Loading...
Attachments 01-28-2022 Budget RetreatAttachment 01-28 20221 Update on M1!C Demographics 1. NC is the I1th largest economy in the nation 2. New business startups grew 40% in 2020, up 80% over 2019 3. We are still a poor state -- 40th in the country in per capita income 4. Wage growth and inflation likely to moderate in 2022; supply chain issues expected to persist through 2022 S. The personality of this downturn is one that primarily impacted the service economy, so revenue collections by the state were not as affected as expected 6. 2020 census - half of the counties gained population, and half of the counties lost population 7. Half of the population growth over the last ten years has been in Wake and Mecklenburg counties 8. NC expects population growth of 20% over the next 20 years (NC is growing a "City of Wilmington" every year) 9. NC continues to be the 2m or 31d most rural state in the country (80 out of 100 counties classified as rural) 10. By 2035, the 65+ population will be greater than the childhood population 13 Mnrk,t ft...6 M.ie, m+tiik I �eLi-y P�4 , FL�33 iCeM a 1',mvnm v!iv Ine Ini4 au tlbinq�l3�A't Pia-. q J , Y 4miP £ f •mq5'. 1 d. .n_-'.+y, 1 11. F. n. p�l<3oM mi J Tv� 1 tiO,:w JdR q% e 3 tsfi ,mn.uf , + s � 3•t I a�s:p,zao 14 2/2/2022 NC Budget Recap (two-year budget just signed into Law) 1. 2020-2021 revenue collections were unprecedented (almost $7 billion more than forecast); so they began the budget process with $7 billion of unallocated revenue in the bottom line for a total of $18 billion to allocate over the two-year budget period 2. Where did the $18 billion go? 3. Capital Improvements -- Public schools, community colleges, universities ($6 billion); Disaster Recovery ($1 billion), Economic Development ($400 million); Large IT projects ($400 million) ARPA (NC received $5.7 billion) (Must be spent by 2026) • $1.7 billion - water/wastewater • $1 billion - high-speed internet • $700 million - economic development • $400 billion - UNC University system; Community College System • All 100 counties and 525 municipalities received money 15 '� _ ,y y ^yy,...� �✓'� '-„` .yam,". Dunn Smithfield Hope' Mills' Oxford Nashville Population FY21-22 Budget Fund) • • , (General Median Age Household Size r 4 1 Household Income ® �' 16 fl I Mc _ nA9 hn �A \i • t N to C_ (3) Q LLI LL I At 11 IlO M; Srl1 m C) n O O rO' O C IM im N 0 0- Attachment #2 01-28-2022 2/15/2022 UNN t 2021 Accomplishments GoldenLeaf Project -Pipe Bursting on W. Pearsall Street Attachment #3 01-28-2022 • Rehabbed 3,767 LF of sewer line (GoldenLeaf Project and N. Watauga/W. Broad Street Project) • Replaced 4,358 LF of Waterline (Lakeshore Drive, N. Watauga, W. Broad, N. General Lee, and S. Wilson) • Secured $45.555 Million/$38.229 Million (Grant) for additional rehab work (Wastewater Plant, Sewer System and Waterlines) 3 2/15/2022 2022-2023 Goals How Does the City Support Growth after the Sewer Moratorium? 2/15/2022 2022-2023 Goals Sanitary Sewer Evaluation of the System Sanitary Sewer Overflow Caused by Inflow and Infiltration • CCTV • Smoke Testing • Flow Monitoring • Manhole Inspections • Dedicated City Crew 2022-2023 Goals 12-inch Waterline Break S. Elm Avenue • Secure Funding for the Water Plant • Continue to replace aging water infrastructure as budget allows • Complete Bay & Elm Waterline Project (2,520 LF) Smoke Testing -Broken Sewer Lateral Water Plant Backwash Pump Replaced in 2021 3 A 01 28 2022 4 I tg _ o L I ® _ X— X— X— X— X kk1 L X�\ W \ z „ v«�y7 m: 2/16/2022 Example of Vegetated Geo-IIft , WithersRavenel Boulder Toe BOVLBEfli�� WithersRavenel Our Piwoie. Yo��r �uc<os,s. 2/16/2022 ® Off-line from main channel Provide quantity storage and water quality benefits WithersRavenel no. roovt�. war s�«ta. Approximate Costs (per linear font) Laying back bank w/ Coir Fiber matting $10-20 Vegetated Geo-Lifts $150-200 Boulder Toe $100-150 ® Boulder Toe w/ 4' Geo-Lifts $175-250 WithersRavenel ..r l—,(", rw. e--, 2/16/2022 Channelnk Lengths Channel Length (Bank Length), ft 1 = 305 (710) 2 = 316 (632) ® 3 = 302 (604) ® 4 = 157 (314) ® 5 =1,070 (2,140) Total = 2,150 (4,300) Withers Ravenet Westhaven Area DAMS • MARTIN • POWEI E..I RE E RR 6 BMv. .V ORB `i 2/16/2022 Westhaven Area ❑ Several of the streets in the area flood frequently due to Inadequate storm pipe sizes ❑ A prior study evaluated Installing addition piping (and or ditches In some areas) to increase capacity of storm piping from less than 2yr storm, to carry 2yr, or 30yr storm events ❑ Cost for Improvements included in the study varies from $0.6M to $2.3M ❑ Recent budget updates In the study for the direct parallel addition of addition piping considered two options Y Option A-3 includes Installing one additional pipe (or ditch near Currltuck) to carry 2-yr storm event Budget $0.7M Y Option A-4 Includes installing two additional pipe (or ditch near Currltuck) to carry 10-yr storm event Budget $1.1M ❑ Stormwater Piping related ARP grant monies available in the fall of 2022. DAVIS • MARTIN • PO�GELI. ENG I II EER6 6 BU RV EYORS 40 / 3 x �c r' d Yi F E ' 4� r ti r O DAVIS • MARTIN • POWELL ENGIN EER6 6 BURV EYO RB 400 2/16/2022 Cole- Fayetteville Ajr ❑ Several of the streets in the area flood frequently due to inadequate storm pipe sizes ❑ Initial surveying completed to determine sizes/depths of existing piping along Cole and Fayetteville streets ❑ An Engineering Study is needed to determine options for various Improvements & storm intensities LI The conceptual budget is based on the 36" and 48" pipes shown in the exhibit. Conceptual Budget $2.01VI Stormwater Piping related ARP grant monies available in the fall of 2022. DAMS • MARTIN • POWELL ENO .N. 6 Be RVfiYOftB ❑ Juniper Creek Drainage Basin 2016 Study Identified Multiple Areas for additional evaluation ❑ Area along Watauga Ave, north of the Rails to Trails, was evaluated to: ❑ Provide a small environmental education opportunity ❑ Provide a small Juniper Creek Phase 1 watershed enhancement ❑ A conceptual budget for developing the site based on the rendering Conceptual Budget $2.OM ❑ Stormwater Piping related ARP grant monies available In the fall of 2022. Potential other funding sources available as well. DAvis • MARTIN • POWFLL ... I..... 8 . V 1118 CUP G