BUILDING Plan Box Number Fl Lic Job Name emoil a Ai it a Jk)(,7
Date 44 /4 It
Required Inspections for SFA/SFD
Appl # II-Soo 21?31
Valuation. S74FD9
Sq Feet i1'o$S
Sequence
10 R* Bldg Footing
10 v'-- R* Mono Slab
10 30_2,-- V Elec Temp Service Pole
20 Foundation Survey
20 R* Building Foundation
20 Address Confirmation Slab
30 999 Open Floor
30 999 1--- R* Bldg Slab Insp Mono ✓
30 999 z___— R* Elec Under Slab
30 999.___r_. - R*Plumb Under Slab Crawl
40 Four Trade Rough In
40 Four Trade Rough In> 2500
40 Three Trade Rough In
40 Three Trade Rough In> 2500
40 Two Trade Rough In
40 Two Trade Rough In> 2500
40 One Trade Rough In
40 One Trade Rough In > 2500
50 tR* Insulation
60 Four Trade Final
60 c_. Four Trade Final > 2500
60 Three Trade Final
60 Three Trade Final > 2500
60 Two Trade Final
60 Two Trade Final > 2500
60 One Trade Final
60 One Trade Final > 2500
999 Envir Operations Permit