BUILDING Plan Box Number h LOt Job Name C4.tOL ,A 6-L4 /1 15 Y
Date 1-1 ), ) 1!
Required Inspections for SFA/SFD
Appl # 11 Soo 14(.01
Valuation42ks7qD9
Sq Feet Loa--
Sequence
10 R* Bldg Footing
10 G --- R* Mono Slab
10 30R* Elec Temp Service Pole
20 Foundation Survey
20 R* Building Foundation
20 !/---_ Address Confirmation Slab
30 999 Open Floor
30 999 /----- V Bldg Slab Insp Mono V
30 999 (---- R* Elec Under Slab
30 999 R*Plumb Under Slab Crawl
40 Four Trade Rough In
40 v------ Four Trade Rough In> 2500
40 Three Trade Rough In
40 Three Trade Rough In> 2500
40 Two Trade Rough In
40 Two Trade Rough In> 2500
40 One Trade Rough In
40 One Trade Rough In > 2500
50 c/ R* Insulation
60 Four Trade Final
60 c1- Four Trade Final > 2500
60 Three Trade Final
60 Three Trade Final > 2500
60 Two Trade Final
60 Two Trade Final > 2500
60 One Trade Final
60 One Trade Final > 2500
999 Envir Operations Permit