Loading...
BUILDING Plan Box Number h LOt Job Name C4.tOL ,A 6-L4 /1 15 Y Date 1-1 ), ) 1! Required Inspections for SFA/SFD Appl # 11 Soo 14(.01 Valuation42ks7qD9 Sq Feet Loa-- Sequence 10 R* Bldg Footing 10 G --- R* Mono Slab 10 30R* Elec Temp Service Pole 20 Foundation Survey 20 R* Building Foundation 20 !/---_ Address Confirmation Slab 30 999 Open Floor 30 999 /----- V Bldg Slab Insp Mono V 30 999 (---- R* Elec Under Slab 30 999 R*Plumb Under Slab Crawl 40 Four Trade Rough In 40 v------ Four Trade Rough In> 2500 40 Three Trade Rough In 40 Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 40 One Trade Rough In 40 One Trade Rough In > 2500 50 c/ R* Insulation 60 Four Trade Final 60 c1- Four Trade Final > 2500 60 Three Trade Final 60 Three Trade Final > 2500 60 Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 Envir Operations Permit