BUILDING c.
Plan Box Number A Job Name l L v
Date: 1 2- - 1
Required Inspections for SFA /SFD
Appl. # 1 I -Stt2 -Ce6 5
Valuation
Sq. Feet .7 a6 1
Sequence
10 R* Bldg. Footing
10 -30 R* Elec. Temp Service Pole
20 R* Building Foundation
20 Address Confirmation
30 -999 Open Floor
30 -999 ,/ R* Bldg. Slab Insp.
30 -999 R* Elec. Under Slab
30 -999 ✓ R *Plumb. Under Slab
40 Four Trade Rough In
40 ,/ Four Trade Rough In> 2500
40 Three Trade Rough In
40 Three Trade Rough In> 2500
40 Two Trade Rough In
40 Two Trade Rough In> 2500
40 One Trade Rough In
40 One Trade Rough In > 2500
50 R* Insulation
60 Four Trade Final
60 ✓ Four Trade Final > 2500
60 Three Trade Final
60 Three Trade Final > 2500
60 Two Trade Final
60 Two Trade Final > 2500
60 One Trade Final
60 One Trade Final > 2500
999 Envir. Operations Permit
•
1
A