Loading...
BUILDING C . ( 2, 1 Plan Box Number G 3. Job Name 0.4a 20 Date: I — C 1 I Required Inspections for SFA/SFD Appl. # I I — roo'Z S S� Valuation Z 4-(c Sq. Feet / 9 / c/ Sequence 10 ✓ R* Bldg. Footing 10 -30 R* Elec. Temp Service Pole 20 R* Building Foundation 20 ,/ Address Confirmation 30 -999 Open Floor 30 -999 R* Bldg. Slab Insp. 30 -999 R* Elec. Under Slab 30 -999 R *Plumb. Under Slab 40 ✓ Four Trade Rough In 40 Four Trade Rough In> 2500 40 Three Trade Rough In 40 Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 40 One Trade Rough In 40 One Trade Rough In > 2500 50 ,✓ R* Insulation 60 ✓ Four Trade Final 60 Four Trade Final > 2500 60 Three Trade Final 60 Three Trade Final > 2500 60 Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 ,/ Envir. Operations Permit