BUILDING C . ( 2, 1
Plan Box Number G 3.
Job Name 0.4a 20
Date: I — C 1 I
Required Inspections for SFA/SFD
Appl. # I I — roo'Z S S�
Valuation Z 4-(c
Sq. Feet / 9 / c/
Sequence
10 ✓ R* Bldg. Footing
10 -30 R* Elec. Temp Service Pole
20 R* Building Foundation
20 ,/ Address Confirmation
30 -999 Open Floor
30 -999 R* Bldg. Slab Insp.
30 -999 R* Elec. Under Slab
30 -999 R *Plumb. Under Slab
40 ✓ Four Trade Rough In
40 Four Trade Rough In> 2500
40 Three Trade Rough In
40 Three Trade Rough In> 2500
40 Two Trade Rough In
40 Two Trade Rough In> 2500
40 One Trade Rough In
40 One Trade Rough In > 2500
50 ,✓ R* Insulation
60 ✓ Four Trade Final
60 Four Trade Final > 2500
60 Three Trade Final
60 Three Trade Final > 2500
60 Two Trade Final
60 Two Trade Final > 2500
60 One Trade Final
60 One Trade Final > 2500
999 ,/ Envir. Operations Permit