Loading...
BUILDING Plan Box Number - Z Job Name Date: 12 - 2 8' -1 b Required Inspections for SFA/SFD Appl.# y B 8' s ?GS ' 2Y 9 Valuation t ? 2 `l3 tJ Sq. Feet 2. c Sequence 10 ✓ R* Bldg. Footing 10 -30 R* Elec. Temp Service Pole 20 • R* Building Foundation 20 Address Confirmation 30 -999 / Open Floor 30 -999 R* Bldg. Slab Insp. 30 -999 R* Elec. Under Slab 30 -999 R *Plumb. Under Slab 40 ✓ Four Trade Rough In 40 Four Trade Rough In> 2500 40 Three Trade Rough In 40 Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 40 One Trade Rough In 40 One Trade Rough In > 2500 50 ,i R* Insulation 60 i/ Four Trade Final 60 Four Trade Final > 2500 60 Three Trade Final 60 Three Trade Final > 2500 60 Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 Envir. Operations Permit