03232000512 DUNN CITY COUNCIL CITY OF DUNN, NORTH CAROLINA MINUTES THE CITY COUNCIL OF THE CITY OF DUNN HELD A SPECIAL CALL MEETING ON MARCH 23, 2000 AT 5:30 P.M. IN THE DUNN MUNICIPAL BUILDING. PRESENT WAS MAYOR PRO -TEM MIKE WOMBLE AND COUNCILMEMBERS PAUL BASS, CAROLYN MCDOUGAL, GEORGE ROBINSON, TOBY SUMNER AND JOEY TART. ALSO PRESENT WERE CITY MANAGER CARL DEAN, CITY CLERK JOYCE VALLEY, CHIEF BUILDING ( INSPECTOR RICKY PARSON, FINANCE DIRECTOR RENEE' DAUGHTRY, CITY ENGINEER ED POWELL, PUBLIC WORKS DIRECTOR TIM HOLLOMAN AND ASSISTANT PUBLIC WORKS DIRECTOR JOE CAMPBELL. MAYOR ABRAHAM OUDEH ARRIVED AT 5:45 P.M. AND OPENED THE MEETING. INVOCATION MAYOR OUDEH ASKED COUNCILMEMBER TART TO GIVE THE INVOCATION. AFTERWARD, THE PLEDGE OF ALLEGIANCE WAS REPEATED. CRITICAL NEEDS WATER AND SEWER GRANT LOAN PROGRAM MAYOR OUDEH YIELDED TO CITY MANAGER DEAN WHO STATED THAT THE CITY WAS SUCCESSFUL IN SECURING A GRANT AWARD OF $2 MILLION DOLLARS AND A STATE LOAN OF- $1 MILLION DOLLARS FROM THE N.C. DEPARTMENT OF EMERGENCY MANAGEMENT FOR IMPROVEMENTS AT THE WATER TREATMENT PLANT. HE FURTHER STATED THAT STAFF IS ALSO CONSIDERING THE REQUEST OF LOAN FUNDS TO DO A COUPLE OF THE PROJECTS LISTED AS CRITICAL NEEDS, SPECIFICALLY THE JUNIPER CREEK OUTFALL ( #2) AND A PORTION OF THE EASTSIDE FORCEMAIN, AMOUNTING TO APPROXIMATELY $500,000.00. HE ADDED THAT THERE IS A STRONG POSSIBILITY THAT THE CITY COULD RECEIVE AN ADDITIONAL $200,000.00 GRANT FOR THIS PORTION OF THE PROJECT AND DUE TO DEADLINES INVOLVING THESE GRANT FUNDS, ACTION MUST BE EXPEDITED IN ORDER TO PROCEED WITH THE PROJECT. HE YIELDED TO CITY ENGINEER ED POWELL FOR EXPLANATION OF THE PROGRAM. - CITY ENGINEER POWELL STATED THAT IT WAS A PLEASURE TO INFORM COUNCIL THAT HIS FIRM WAS ABLE TO SECURE A GRANT AWARD OF $2 MILLION DOLLARS AND A STATE LOAN OF $1 MILLION DOLLARS THROUGH A GRANT PROGRAM OFFERED BY THE DEPARTMENT OF EMERGENCY MANAGEMENT. HE BRIEFED COUNCIL ON THE HISTORY OF THE GRANT PROGRAM, WHICH THE CITY FIRST APPLIED FOR IN MARCH, 1999. HE STATED THAT THE FIRST SERIES OF BOND OFFERS WERE ISSUED IN JULY, 1999 AND THE CITY WAS NOT FORTUNATE TO BE INCLUDED IN THOSE OFFERS DUE TO THE PRIORITY RATING OF THESE PROGRAMS; HOWEVER, AFTER THE STORMS OF THE SUMMER AND FALL OF 1999 THE PROGRAM WAS DELAYED AND THE FINAL SUBMITTAL DATE WAS MOVED TO FEBRUARY, 2000. CITY ENGINEER POWELL STATED THAT THE CITY ORIGINALLY APPLIED FOR $3 MILLION DOLLARS IN WATER FACE,ITY IMPROVEMENT PROGRAMS AND $3 MILLION DOLLARS IN WASTEWATER FACILITY IMPROVEMENT PROGRAMS; HOWEVER, THE SECRETARY OF THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, THROUGH AUTHORITY GIVEN IN THE PROGRAM WAS AUTHORIZED TO REDUCE THE AMOUNT OF GRANTS FROM $3 MILLION DOLLARS TO $2 MILLION DOLLARS AND SU?PLEMENT THE GRANTS WITH A LOAN PROGRAM. HE ADDED THAT THE CITY WAS NOTIFIED IN MID-MARCH THAT GRANTS WERE AWARDED IN THE WATER PROGRAM AND THAT THE CITY WOULD NOT BE FUNDED IN THE WASTEWATER AREA DUE TO THE CITY'S NEEDS BEING IN THE SYSTEM AND NOT THE TREATMENT OF WASTEWATER. CITY ENGINEER POWELL STATED THAT THE REASON HE IS ADDRESSING COUNCIL ( AT A SHORT NOTICE SPECIAL MEETING IS BECAUSE HIS FIRM WAS NOT AUTHORIZED TO PROCEED WITH ANY DESIGN AT THE WATER PLANT AND IN ORDER TO PROCEED WITH THE PROGRAM, THE CITY NEEDS TO PROVIDE NECESSARY CONSTRUCTION PLANS AND SPECIFICATIONS TO RECEIVE A PERMIT BY JULY 7, 2000. HE STATED THAT HE WOULD BE GLAD TO ANSWER ANY QUESTIONS FROM COUNCIL CONCERNING THE PROGRAM. MAYOR OUDEH ASKED HOW MUCH THE ENTIRE PROJECT WOULD COST 513 CITY ENGINEER POWELL RESPONDED $3 MILLION DOLLARS, OF WHICH $1 MILLION WOULD BE A LOAN AND $2 MILLION WOULD BE A GRANT FROM THE STATE. COUNCILMEMBER BASS ASKED IF THE CITY MUST BORROW $500- $700,000.00 TO ASSURE THE $2 MILLION DOLLAR GRANT. CITY ENGINEER POWELL RESPONDED YES, THAT IN ORDER TO RECEIVE THE GRANT, THE CITY MUST CONSTRUCT THOSE FACILITIES THAT PROVIDED THE CITY WITH THE PRIORITY TO RECEIVE FUNDING. HE STATED THAT THOSE CRITICAL NEEDS ARE TO INSTALL A 3 MG CLEARWELL, ALUM SLUDGE RENOVATIONS, WATER TREATMEN" PLANT AND RAW WATER PUMP STATION1 GENERATORS. HE ADDED THAT SOME OF THESE PROJECTS COULD BE DELAYED; HOWEVER, IBEY MUST BE DONE LATER. HE FURTHER STATED THAT HE HAD RECOMMENDED TO STAFF THAT TIM CITY PROCEED WITH THE DESIGN OF THE WHOLE PROGRAM, ACCEPT THE $2 MILLION DOLLAR GRANT, AGREE TO THE LOAN AND TAKE THE SCADA SYSTEM, LABORATORY EXPANSION AS AN ALTERNATE BID AND WHEN BIDS A-RE RECEIVED AND ACTUAL CONSTRUCTION AMOUNTS ARE DETERMINED, THAT AREA COULD BE FINALIZED AND COUNCIL COULD MAKE A DETERMINATION ONCE THE ACTUAL NUMBERS ARE PRESENTED. MAYOR PRO -TEM WOMBLE ASKED IF ONCE THE CITY AGREES TO THE LOAN, WERE THERE ANY PENALTIES IF THE CITY PRE -PAYS THE LOAN. CITY ENGINEER POWELL RESPONDED THAT THERE WERE NO PENALTIES FOR PREPAYMENT TO HIS KNOWLEDGE HE ADDED THAT ON MOST EVERY LOAN PROGRAM THAT THE CITY HAS HAD IN WATER AND WASTEWATER, THERE HAVE BEEN SOME PRE - PAYMENT OPTION'S AND IN SOME INSTANCES, WHERE THERE HAVE BEEN SOME FEDERAL LOW INTEREST LONG -TERM LOANS, FEDERAL LOANS HAVE BEEN MOVED TO BANK LOANS AT A REDUCED AMOUNT OF PRINCIPAL AND THEY USUALLY WORK WITH MUNICIPALITIES TO REDUCE THE AMOUNT OF INDEBTEDNESS. COUNCILMEMBER BASS ASKED IF THE CITY MUST BORROW $500,0004700,000 OR COULD THE CITY PAY THIS AMOUNT OUT OF SURPLUS FUNDS. CITY ENGINEER POWELL STATED THAT IN THIS PARTICULAR AREA, HE THINKS THE CITY COULD PAY OUT OF SURPLUS; HOWEVER, NOBODY HAS EVER ASKED THAT QUESTION BECAUSE OFFERS HAVE JUST COME ABOUT THAT WERE HALF GRANT AND HALF LOAN. HE ADDED THAT THE CITY WOULD BE USING STATE FUNDING CAPABILITY BY TAKING A LOAN AND IF THE CITY DOES NOT NEED IT, HE WOULD IMAGINE THAT THE CITY COULD TAKE THEIR GRANT AND SPEND ITS MONEY IN THIS PARTICULAR PROGRAM. MAYOR OUDEH ASKED WHAT WAS -HE INTEREST RATE. CITY ENGINEER POWELL RESPONDED 5.5 %. MAYOR OUDEH STATED THAT EVEN IF THE CITY HAS SURPLUS FUNDS, HE WOULD RATHER KEEP THE MONEY IN THE CITY OF DUNN RATHER THAN GO SOMEWHERE ELSE AND BORROW MORE. MAYOR PRO -TEM WOMBLE STATED THAT THE METHOD USED TO BORROW THE MONEY DEPENDS ON A LOT OF CIRCUMSTANCES. CITY ENGINEER POWELL STATED THAT THE ONLY CRITICAL TIME ELEMENT AT THIS TIME IS TO GET STARTED WITS DESIGNS AND THE CITY HAS ONLY RECEIVED NOTIFICATION OF THE GRANT AWARD. COUNCILMEMBER SUMNER ASKED IF COUNCIL MUST ALSO LOOK AT THE WASTEWATER SIDE OF THIS PROJECT. CITY ENGINEER POWELL STATED THAT THE CITY DID NOT RECEIVE A CRITICAL NEEDS GRANT OFFER ON THE WASTEWATER PROJECT; HOWEVER, THE CITY ONLY APPLIED FOR A GRANT. HE ADDED THAT ALL AVAILABLE PROGRAM GRANT FUNDS IN THIS 1998 BOND PROGRAM HAVE NOW BEEN EXPANDED WITH A LARGE POOL OF LOAN FUNDS REMAINING AND THE RURAL CENTER HAS AN ONGOING SUPPLEMENTAL GRANT PROGRAM AVAILABLE WHEREBY GRANTS OF UP TO $200,000 ARE AVAILABLE TO SUPPLEMENT LOAN FUNDS ON WATER AND WASTEWATER PROJECTS. 514 HE STATED THAT WHILE ALL ITEMS IDENTIFIED IN THE CITY'S PROPOSAL GRANT PROGRAM WERE CONSIDERED CRITICAL AND WILL NEED TO BE ADDRESSED, TWO SPECIFIC PROJECTS REPRESENT CONDITIONS WHICH COULD FAIL AT ANY TIME AND REQUIRE EMERGENCY REPAIRS OR REPLACEMENT: UPPER 1,700 FEET OF THE JUNIPER CREEK OUTFALL SEWER AND THE UPPER 2,400 FEET OF THE EASTSIDE FORCEMAIN WHICH ARE DETERIORATED DUT TO EXTREME HYDROGEN SULFIDE ATTACK. HE FURTHER STATED THAT THE ESTIMATED COST OF THESE TWO PROJECTS IS APPROXIMATELY $750,000.00 AND SUCCESS IN SECURING A SUPPLEMENTAL GRANT OF $200,000.00 FROM THE RURAL CENTER AND A $550,000.00 LOAN FROM THE 1998 BOND PROGRAM WOULD FUND THESE NEEDED IMPROVEMENTS. HE u ADDED THAT UPON COUNCIL APPROVAL, THE EXISTING PRELIMINARY ENGINEERING REPORT COULD BE REMISED AND PREPARATION OF THE NEEDED APPLICATIONS FOR THESE GRANT AND LOAN FUNDS, WITH A COST OF APPROXIMATELY $2,500 COULD MEET THE SELECTION DEADLINE OF MARCH 31, 2000. COUNCILMEMBER TART ASKED WHAT WOULD HAPPEN IF COUNCIL DOES NOT ACCEPT THE AWARD OF THE GRANT AND LOAN. CITY ENGINEER POWELL STATED THAT THE CRITICAL NEED ITEMS DISCUSSED WOULD BE REPAIRED WITH LOCAL FUNDS. AFTER DISCUSSION, MOTION BY MAYOR PRO -TEM WOMBLE, SECONDED BY COUNCILMEMBER ROBINSON TO ACCEPT $2,000,000.00 GRANT FROM THE N.C. DEPARTMENT OF EMERGENCY MANAGEMENT AND LOAN WITH THE AMOUNT TO BE DETERMINED, PROCEED WITH THE DESIGN AND ENGINEERING OF THE WATER TREATMENT PLANT, AND RESOLUTION AUTHORIZING THE MAYOR TO SIGN REVISED CRITICAL NEEDS WASTEWATER LOAN APPLICATION AND A SUPPLEMENTAL RURAL CENTER GRANT APPLICATION AND MAKE ANY ASSURANCES NEEDED THERETO. MOTION UNANIMOUSLY APPROVED (ATTACHMENT #1) ATTEST: '1L n l� � L C VALLEY,CMC LERK A EH MA R 0 "%J0 -, ; �� �.fF'a0naeaan°.��n� ii i F `r! ♦ T s d W x ° lS y ea