Loading...
BUILDING J Plan Box Number Co Job Name A LL_ go Date: - 27 ( 6 Required Inspections for SFA,'SFD Appl. # 22.7 Valuation 1 K I in C. Sq. Feet ra„9 `J ci Sequence 10 R* Bldg. Footing 10 -30 R* Elec. Temp Service Pole 20 ✓ R* Building Foundation 20 Address Confirmation 30 -999 ✓ Open Floor 30 -999 R* Bldg. Slab Insp. 30 -999 R* Elec. Under Slab 30 -999 R *Plumb. Under Slab 40 ✓ Four Trade Rough In 40 Four Trade Rough In> 2500 40 Three Trade Rough In 40 Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 40 One Trade Rough In 40 One Trade Rough In > 2500 50 ✓ ft* Insulation 60 ✓ Four Trade Final 60 Four Trade Final > 2500 60 Three Trade Final 60 three Trade Final > 2500 60 Iwo Trade Final 60 Two Trade Final > 2500 60 ' )ne Trade Final 60 )ne Trade Final > 2500 999 !:nvir. Operations Permit