The above referenced application
shall be HELD for further revision and review.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
Need to evaluate the width of the alley way for apparatus
Fire Marshal (910)893-7580:
entry and exit
Hold:
Need to evaluate the fire hydrant locations in regards to the
alley way concept.
Need to evaluate the need for signage on the alley ways for
emergency response
Need to evaluate the need for addressing the back of the
residence for emergency response.
Water lines and fire hydrants to be located on the right side
of the road.
NEED AN OVERVIEW OF ENTIRE PROJECT
E911/Addressing (910)814-2038:
NEED A NEW ROAD NAME, "RHYNE LN" WILL NOT WORK
Conditionally Approve:
NEED A NEW ROAD NAME, "ALLEY AA" AND "ALLEY BB" WILL
NOT WORK, THIS ALSO NEEDS TO BE 1 ROAD NAME
Note that “A foundation survey should be submitted at the
Planning Department (910)893-7525:
completion of foundation construction.”
Conditionally Approve:
Submit updated Master Development Plan.
The Developer must provide HCDPU with a complete Master
Public Utilities (910)893-7575:
Development Plan to include all proposed phases, lots,
Hold:
streets, and utilities.
The water and sewer lines for the existing Keith Hills
subdivision currently belong to Campbell University.
Campbell University is planning to sell or give these utilities
to Harnett County in the near future. Permitting for the
proposed water and sewer lines will need to be approved by
HCDPU, Campbell University and NCDENR at this time.
HCDPU will be the permittee once the transfer of the existing
utilities have been turned over to Harnett County.
Harnett County Dept of Public Utilities (HCDPU) must be
provided a twenty (20’) feet wide easement for each water
and sewer line once the project construction is completed and
approved by HCDPU Campbell University and NCDENR.
The lot numbers are not consecutively numbered which has
changed from the previous plat submitted to the DRB.
The fire hydrant legs should not be located under the
pavement.
Water lines should be located on the right side of the street
as viewed when entering the subdivision.
KEITH HILLS TRACT J DECISION PACKET 2
4/6/2009
1
Environmental Health (910)893-7547:
Approve:
LONG RANGE CONDITIONS
The following conditions must be satisfied
Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.
Please visit www.harnett.org/utilities for more information on the approval process.
The developer must provide HCDPU a one (1) year warranty on the water and sewer lines
installed to serve this development.
The developer’s engineer must provide utility plans, and engineers report, project specifications
along with the NCDENR applications to HCDPU for review and approval. No construction may
begin on the water and sewer lines without the required NCDENR permits.
Development Review Board
Chairman
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2)
business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all
items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait,
as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wesnesday following the
meeting the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with
Planning Staff to discuss other potential options.