Loading...
PU-SR-01 required to connect to Harnett County's existing sewer system since the project site is over one (1) mile from the nearest sanitary sewer line. Page 2 of 2PUBLIC UTILITIES STAFF REPORT PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Maggie Reid Farm Property Description PIN(s): 0652-38-2442.000 Acreage: 76.59 acres Address/SR No.: Harnett Central Road (SR 2215) Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Harnett Central Road (SR 2215) Nearest water line size: 12" Fire flow is available for this development Lines permitted under DENR Permit: Not Yet Permitted (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is available for this development Nearest sewer line location (Road name & SR#): FV-Lillington WW Interceptor Nearest sewer line size: 48" Lines permitted under DENR Permit: Existing sewer system over 1 mile from project site WQ 0028647 (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: 07-23-2008 VOTE: Approve CONDITIONS: SHORT TERM: None  LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The Professional Engineer must submit utility plans, an engineer's report and project  specifications to HCDPU in accordance with the established approval process, but this long range requirement will not affect preliminary plat approval by HCDPU. Water and sewer is available in adequate supply to serve this proposed development, but the developer will not be Page 1 of 2PUBLIC UTILITIES STAFF REPORT