007-0-30-F SR Public Utilities 01
Approval for the new water lines has been issued to HCDPU.
Page 2 of 2PUBLIC UTILITIES STAFF REPORT
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Natures Crossroads - Phase 2
Property Description
PIN(s): _9575-14-5576.000 Acreage: 24.56 acres
Address/SR No.: Hwy 24
Water
Public water is available for this development (via Harnett County)
Comments: The new water lines installed in Phase 2 have not been tested per Harnett County
Department
of Public Utilities (HCDPU) requirements. The water lines must be pressure tested and water samples
submitted to the HCDPU laboratory for bacteria testing before the Final Plat for Phase 2 may be approved
by HCDPU. The professional engineer must submit the As-Built Record Drawings, PE Certification and
Cost
statement for the value of the water system improvements to HCDPU prior to Final Plat approval by
HCDPU.
Sewer
Public sewer is not available for this development (via Harnett County)
Comments: Septic Tanks must be properly sized and installed on each residential building lot to handle
the wastewater disposal as HCDPU does not have county sewer available within close proximity of this
development.
NOTE: The septic tanks for each residential lot must be approved by The Harnett County Environmental
Health Department.
NOTE: HCDPU provides this information as a curteousy to the developer and profeesional engineer for
design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and
inaccurate
information provided through this preliminary approval process. It is therefore recommended that the
engineer or developer "field verify" the information provided by HCDPU prior to purchasing, grading,
excavating, clearing, or developing the subject property. HCDPU will not make provisions to extend new
water lines to new developments at the county's expense and HCDPU will not provide assistance to
upgrade, install or improve the new or existing water services in the proximity of this project unless the
developer can provide HCDPU proper justification and demonstrate a benefit for Harnett County.
Ballot
REVIEWER: Tim Payseur Date: Feb. 14, 2007
VOTE: Hold
CONDITIONS:
SHORT TERM: The new water lines must be tested and inspected by HCDPU
LONGE RANGE: The professional engineer must submit the As-Built Record Drawings, PE Certification
and Cost statement for the value of the water system improvements to HCDPU prior to Final Plat
approval by HCDPU. Water meters for the residential lots may not be released until the NCDENR Final
Page 1 of 2PUBLIC UTILITIES STAFF REPORT