Loading...
PATTON'S POINT DECISION PACKET 2 (2) DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: PATTON’S POINT PHASE 2 & 3 Development Type: Major Subdivision Preliminary Plan/Plat Date: Jun. 13, 2007 The above referenced application is CONDITIONALLY APPROVED as listed below. SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. Planning Department: ENSURE THAT ALL PROPER CERTIFICATIONS ARE SIGNED Fire Mashal: RECOMMENDATION FOR 8" LINE AND FIRE HYDRANT LOCATIONS TO BE VERIFIED ON SUBMITTAL TO PUBLIC UTILITIES. Public Utilities: The Professional Engineer (PE) must submit a Master Development Plan to HCDPU before HCDPU will review or approve the Utility Plans for Phase 3. Public Utilities: The Professional Engineer (PE) must revise the As-Built Record Drawings for Phase 1 to correct a known error before HCDPU will review or approve the Utility Plans for Phase 3. Public Utilities: The Professional Engineer (PE) must submit a complete fire flow analysis for the entire development of Phases 1, 2 & 3 of Patton's Point along with any other phases which may be planned for the future using the existing six (6") inch water line along Tingen Road and Fifty Caliber Drive.  :  :  :  :  :  :  :  :  :  :  :   PATTON'S POINT DECISION PACKET 2 4/1/2009 1   LONG RANGE CONDITIONS The following conditions must be satisfied Public Utilities: The Professional Engineer (PE) must submit three (3) sets of utility plans for Phase 3, an engineer's report, and project specifications to HCDPU for review and subsequent approval. Public Utilities: HCDPU must complete the final inspections and testing of the water line extensions installed to serve this subdivision. Public Utilities: The Professional Engineer (PE) must submit the As-Built Record Drawings, PE Certification and Cost Statement to HCDPU for the new water and sewer collection lines installed in this subdivision. Public Utilities: The Developer must provide HCDPU with a one (1) year warranty on the new water lines and the associated appurtenances that serve this subdivision once approved by HCDPU and NCDENR.  :  :  :  :  :  :  :     Development Review Board Chairman If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you the next business day. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If HELD, you must submit 10 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options. PATTON'S POINT DECISION PACKET 2 4/1/2009 2