Loading...
PU-SR-02 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Regal Crest - Final Plan/Plat Property Description PIN(s): 0633-32-7599.000 Acreage: 23.28 acres Address/SR No.: River Road (SR 1418) Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): River Road (SR 1418) Nearest water line size: 4" Fire flow is not available for this development Lines permitted under DENR Permit: 07-02308 (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is not available for this development Nearest sewer line location (Road name & SR#): US 401 Nearest sewer line size: 48" Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: May 21, 2008 VOTE: Hold CONDITIONS: SHORT TERM: HCDPU must complete the final inspection and testing of the water main installed to serve this  subdivision. The Professional Engineer (P.E.) must submit the As-Built Record Drawings (mylars, paper and  digital formats) for the water line to HCDPU. The Professional Engineer (P.E.) must submit the P.E. Certification for the water line to HCDPU.  The Developer must provide HCDPU with a cost statement of the water system improvements  installed to serve the subdivision. LONG RANGE: Page 1 of 2 PUBLIC UTILITIES STAFF REPORT Please visit www.harnett.org/utilities for more information on the approval process.  The Developer must provide HCDPU with a one (1) year warranty on the water system  improvements installed for this subdivision. Page 2 of 2 PUBLIC UTILITIES STAFF REPORT