Loading...
SummerHill-Public Utilities-SR-F-01 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Summer Hill Subdivision - Final Property Description PIN(s): 0539-89-3880.000 Acreage: 28.14 acres Address/SR No.: McDougald Rd Water Public water is available for this development (via Harnett County) Comments: Harnett County Department of Public Utilities (HCDPU) has inspected the six (6") inch water main along Oakleaf Drive & Maple leaf Ct that was installed to serve the Summer Hill Subdivision. These water mains should be able to adequately serve this project. The plans for the water line extensions from the existing water main have been previously submitted to HCDPU and NCDENR-PWSS for approval. The proposed water line extensions for this project have been permitted by NCDENR-PWSS under Tracking Number 06-01788. The utility contractor has completed the construction of the water mains in accordance with the approved plans. The PE has submitted the As-Built Record Drawings (paper, mylar & digital formats), the PE Certification and the Cost Statement for the for the water line(s) installed to serve this subdivision. These documents must be submitted to HCDPU prior to the final plat being stamped by the Development Review Board (DRB). See the Approval Process for New Water Line Extensions as described on the Harnett County website. NOTE: HCDPU provides this information as a curteousy to the developer and professional engineer for design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and inaccurate information provided through this preliminary and/or final plat approval process. It is therefore recommended that the professional engineer or developer "field verify" the information provided by HCDPU. Sewer Public sewer is not available for this development (via Harnett County) Comments: Septic Tanks must be properly sized and installed on each residential building lot to handle the wastewater disposal as HCDPU does not have county sewer available within close proximity of this development. The septic tanks for each residential lot must be approved by The Harnett County Environmental Health Department. NOTE: HCDPU provides this information as a curteousy to the developer, land surveyor and professional engineer for design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and inaccurate information provided through this preliminary approval process. It is therefore recommended that the engineer or developer "field verify" the information provided by HCDPU prior to purchasing, grading, excavating, clearing, or developing the subject property. HCDPU will not make provisions to extend new water lines to new developments at the county's expense and HCDPU will not provide assistance to upgrade, install or improve the new or existing water services in the proximity of this project unless the developer can provide HCDPU proper justification and demonstrate a benefit for Harnett Page 1 of 2 PUBLIC UTILITIES STAFF REPORT County. Ballot REVIEWER: Tim Payseur Date: Apr. 11, 2007 VOTE: Conditionally Approve CONDITIONS: SHORT TERM: NCDENR - PWSS has issued the Final Approval for the new water line(s) installed to serve this subdivision. HCDPU may release water meters for the lots of this new subdivision once the E-911 addresses have been assigned to the lots and the Developer has paid the Capacity Use Fees. See the Approval Process for New Water Line Extensions as described on the Harnett County website. LONGE RANGE: The Developer and Contractor must provide HCDPU with a one (1) year warranty on the new water mains and sewer collection lines and associated appurtenances that serve this project once the new utility improvements have been approved by HCDPU and NCDENR. Page 2 of 2 PUBLIC UTILITIES STAFF REPORT