SummerHill-Public Utilities-SR-F-01
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Summer Hill Subdivision - Final
Property Description
PIN(s): 0539-89-3880.000 Acreage: 28.14 acres
Address/SR No.: McDougald Rd
Water
Public water is available for this development (via Harnett County)
Comments: Harnett County Department of Public Utilities (HCDPU) has inspected the six (6") inch water
main along Oakleaf Drive & Maple leaf Ct that was installed to serve the Summer Hill Subdivision.
These water mains should be able to adequately serve this project. The plans for the water line
extensions from the existing water main have been previously submitted to HCDPU and NCDENR-PWSS
for
approval. The proposed water line extensions for this project have been permitted by NCDENR-PWSS
under Tracking Number 06-01788. The utility contractor has completed the construction of the water
mains in accordance with the approved plans.
The PE has submitted the As-Built Record Drawings (paper, mylar & digital formats), the PE Certification
and the Cost Statement for the for the water line(s) installed to serve this subdivision. These documents
must be submitted to HCDPU prior to the final plat being stamped by the Development Review Board
(DRB). See the Approval Process for New Water Line Extensions as described on the Harnett County
website.
NOTE: HCDPU provides this information as a curteousy to the developer and professional engineer for
design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and
inaccurate
information provided through this preliminary and/or final plat approval process. It is therefore
recommended that the professional engineer or developer "field verify" the information provided by
HCDPU.
Sewer
Public sewer is not available for this development (via Harnett County)
Comments: Septic Tanks must be properly sized and installed on each residential building lot to handle
the wastewater disposal as HCDPU does not have county sewer available within close proximity of this
development. The septic tanks for each residential lot must be approved by The Harnett County
Environmental Health Department.
NOTE: HCDPU provides this information as a curteousy to the developer, land surveyor and professional
engineer for design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions,
and inaccurate information provided through this preliminary approval process. It is therefore
recommended that the engineer or developer "field verify" the information provided by HCDPU prior to
purchasing, grading, excavating, clearing, or developing the subject property. HCDPU will not make
provisions to extend new water lines to new developments at the county's expense and HCDPU will not
provide assistance to upgrade, install or improve the new or existing water services in the proximity of
this
project unless the developer can provide HCDPU proper justification and demonstrate a benefit for
Harnett
Page 1 of 2 PUBLIC UTILITIES STAFF REPORT
County.
Ballot
REVIEWER: Tim Payseur Date: Apr. 11, 2007
VOTE: Conditionally Approve
CONDITIONS:
SHORT TERM: NCDENR - PWSS has issued the Final Approval for the new water line(s) installed
to serve this subdivision. HCDPU may release water meters for the lots of this new subdivision once
the
E-911 addresses have been assigned to the lots and the Developer has paid the Capacity Use Fees.
See the Approval Process for New Water Line Extensions as described on the Harnett County website.
LONGE RANGE: The Developer and Contractor must provide HCDPU with a one (1) year warranty on
the
new water mains and sewer collection lines and associated appurtenances that serve this project once
the new utility improvements have been approved by HCDPU and NCDENR.
Page 2 of 2 PUBLIC UTILITIES STAFF REPORT