Loading...
Summerhill DRB Decision Packet DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Summer Hill Development Type: Major Subdivision Final Plan/Plat Date: Apr. 11, 2007 The above referenced application shall be HELD for further revision and review. SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. E911/Addressing: ON SHEET 1 "OAK LEAF DR" AND "MAPLE LEAF CT" SHOULD BE LISTED.  : ON THE VICINITY MAPS ON SHEETS 1, 2 AND 3 US 421 SHOULD BE LISTED AS "US 421 N" AND SR 1229 SHOULD BE LISTED WITH MCDOUGALD RD.  : ON SHEET 3 "OAK LEAF DR" SHOULD BE LISTED.  : THE ROAD SIGN COST IS $250.00 FOR THE 2 INTERSECTIONS. Environmental Health: The soils report submitted was a preliminary not a final soils report. Cannot review unless final soils report is submitted Fire Marshal: Temporary turn-around must be provided at dead-end road Planning Department: Date must be revised  : PIN must be corrected  : Deed reference must be corrected  : Watershed notation to be removed (tract is not in watershed)  : All easements to be shown  : Thoroughfare plan notation must be included (may be included in notes section; 'McDougald Rd., SR 1229 is on the Harnett County Thoroughfare Plan')  : Maintenance responsibility for ALL easements must be shown (includes drainage, sign, septic, and all other easements)  : Total number of lots must be shown  : Lots 5 and 18 must meet minimum lot width of 100 feet  : Street lights must be shown or noted  : Landscaping type and maintenance requirements for streetscape buffer must be noted  : Off site septic lots must identify building lots that will be using it, maintenance responsibility, and easements must be provided so that all lots using off site septic have direct access Summerhill DRB Decision Packet 3/30/2009 1  : Off site septic lots must be noted as non-buildable lots  : Harnett County Review Officer certification to be amended (Review officer is not subdivision administrator)  : Certification of ownership and dedication must be signed  : Surveyor certification and seal must be signed  : NCDOT driveway permit approval must be provided; NCDOT must sign  : E-911 certification to be removed  : Environmental Health certification to be removed  : Subdivision administrator certification to be removed  : Planning Director certification to be removed  : Rec fees must be paid ($17,500- 35 lots at $500 per lot)  : Verification of street sign purchase must be provided  : Buffer must be completed prior to approval  : Temporary gate at entrance must be removed prior to final approval Public Utilities: NCDENR - PWSS has issued the Final Approval for the new water line(s) installed to serve this subdivision. HCDPU may release water meters for the lots of this new subdivision once the E-911 addresses have been assigned to the lots and the Developer has paid the Capacity Use Fees. See the Approval Process for New Water Line Extensions as described on the Harnett County website. LONG RANGE CONDITIONS The following conditions must be satisfied Public Utilities: The Developer and Contractor must provide HCDPU with a one (1) year warranty on the new water mains and sewer collection lines and associated appurtenances that serve this project once the new utility improvements have been approved by HCDPU and NCDENR.  :  :  : Development Review Board Chairman If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you the next business day. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If HELD, you must submit 10 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options. Summerhill DRB Decision Packet 3/30/2009 2