Loading...
PU-SR-01 LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The Developer must provide HCDPU with a one (1) year warranty on the water system  improvements installed to serve the Carolina Seasons - Phase 2 Section 2 subdivision. Page 2 of 2PUBLIC UTILITIES STAFF REPORT PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Carolina Seasons Ph 2, Sect 2: Final Property Description PIN(s): 9557-81-1024.000 Acreage: 37.78 acres Address/SR No.: Ponderosa Trail Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Ponderosa Trail Nearest water line size: 6" Fire flow is available for this development Lines permitted under DENR Permit: 08-00069 (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is not available for this development Nearest sewer line location (Road name & SR#): Nearest sewer line size: Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: July 23, 2008 VOTE: Hold CONDITIONS: SHORT TERM: The Profesional Engineer must submit the final As-Built Record Drawings to HCDPU in the  following formats: blueprint (paper), mylar and digital. HCDPU has received the mylar copy only and the other copies must be submitted to HCDPU before the final plat will be approved for recording. The Developer must provide HCDPU with a cost statement indicating the total cost of the water  system improvements installed to serve the Carolina Seasons - Phase 2 Section 2 subdivision. The Utility Contractor must complete all punch list items from the HCDPU final inspection on  water system installed to serve the Carolina Seasons - Phase 2 Section 2 subdivision. Page 1 of 2PUBLIC UTILITIES STAFF REPORT