Loading...
PU-SR-01 LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The Developer must provide HCDPU with a one (1) year warranty on the water system  improvements installed to serve the Carolina Seasons - Phase 2 Section 1 subdivision. Page 2 of 2PUBLIC UTILITIES STAFF REPORT PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Carolina Seasons Ph 2, Sect 1: Final Property Description PIN(s): 9557-81-1024.000 Acreage: 50.87 acres Address/SR No.: Ponderosa Trail Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Ponderosa Trail Nearest water line size: 6" Fire flow is available for this development Lines permitted under DENR Permit: 07-01391 (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is not available for this development Nearest sewer line location (Road name & SR#): Nearest sewer line size: Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: July 2, 2008 VOTE: Hold CONDITIONS: SHORT TERM: The Profesional Engineer must submit the final As-Built Record Drawings to HCDPU in the  following formats: blueprint (paper), mylar and digital. HCDPU has received only one blueprint (paper) copy and Sheet S-5 contains lots 191 -196 that are not shown on the final plat to be approved for recording. The Developer must provide HCDPU with a cost statement indicating the total cost of the water  system improvements installed to serve the Carolina Seasons - Phase 2 Section 1 subdivision. The Utility Contractor must complete all punch list items from the HCDPU final inspection on  water system installed to serve the Carolina Seasons - Phase 2 Section 1 subdivision. Page 1 of 2PUBLIC UTILITIES STAFF REPORT