Loading...
PU-SR-01PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Evergreen - Preliminary Plat Plan Property Description PIN(s): 9537-83-5120.000  Acreage: 64.23 acres  Address/SR No.: Milton Welch Road (SR 1320)   Water Public water  available for this development (via ) Water capacity  available for this development Nearest water line location (Road name & SR#): Milton Welch Road (SR 1320) Nearest water line size: 6" Fire flow  available for this development Lines permitted under DENR Permit:       (DEH Serial Number) Sewer Public sewer  available for this development (via ) Sewer capacity  available for this development Nearest sewer line location (Road name & SR#):       Nearest sewer line size:       Lines permitted under DENR Permit:       (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes  No  N/A Cost Statement for water improvements Yes  No  N/A Cost Statement for sewer improvements Yes  No  N/A Professional Engineer’s Certifications for water/sewer extension Yes  No  N/A Final Plat & As-Built Record Drawings are identical Yes  No  N/A DOT Encroachment Agreement Yes  No  N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes  No  N/A Master Plan submitted for additional phases if intended Yes  No  N/A Ballot REVIEWER: Tim Payseur Date: September 3, 2008 VOTE:  CONDITIONS: SHORT TERM: Consideration should be given to loop the Apache Trail & Mohawk Drive together or let them intersect so the water main can be looped through the development without a dead end. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process. The Utility Plans for the proposed development should be submitted to HCDPU and NCDENR for review and permitting in accordance with the approval process. The Professional Engineer (P.E.) must provide HCDPU with the Engineer's report, the Project Specifications and the DEH Water Application with the Utility Plans in approval process established by the county and the state. The Utility Plans for the proposed development should be submitted to HCDPU and NCDENR for review and permitting in accordance with the approval process. The Professional Engineer (P.E.) must provide HCDPU with the Engineer's report, the Project Specifications and the DEH Water Application with the Utility Plans in approval process established by the county and the state.