Loading...
PU-SR-01 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Buffalo Lakes Business Park – Final Property Description PIN(s): 9575-96-6106.000 Acreage: 8.54 acres Address/SR No.: Buffalo Lakes Road (SR 1115) Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Buffalo Lakes Road (SR 1115) & Amarillo Lane Nearest water line size: 8" Fire flow is available for this development Lines permitted under DENR Permit: 07-00982 (DEH Serial Number) Sewer Public sewer is available for this development (via Harnett County) Sewer capacity is available for this development Nearest sewer line location (Road name & SR#): Buffalo Lakes Road (SR 1115) & Amarillo Lane Nearest sewer line size: 8" Gravity and 4" Force Main Lines permitted under DENR Permit: WQ0031882 (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: Feb 27, 2008 VOTE: Hold CONDITIONS: SHORT TERM: • The Utility Contractor must schedule the final inspection with HCDPU on the water and sewer lines installed to serve Buffalo Lakes Business Park. If a punch list is generated from the final inspection, then the punch list items must be completed to satisfy HCDPU requirements. • The Utility Contractor must schedule the draw down test on the sewer lift station following the final inspection on the water and sewer lines. If a punch list is generated from thedraw down test, then the punch list items must be completed to satisfy HCDPU requirements. • The PE must provide HCDPU with a complete set of As-Built Record Drawings (mylar, paper & digital formats) on the water and sewer improvement installed to serve the Buffalo Lakes Business Park. Page 1 of 2 PUBLIC UTILITIES STAFF REPORT installed to serve Buffalo Lakes Business Park. • The PE must provide HCDPU with a Final Certification on the sewer improvements installed under Permit # WQ0031882. • The Developer must provide HCDPU with a cost statement for the water and sewer improvements installed to serve Buffalo Lakes Bussiness Park. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The Developer must provide HCDPU with a one (1) year warranty for the water and sewer  improvements installed to serve the Buffalo Lakes Bussiness Park. Page 2 of 2 PUBLIC UTILITIES STAFF REPORT