BUFFALO LAKES BUSINESS DECISION
DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: BUFFALO LAKES BUSINESS PARK
Development Type: Major Subdivision Final Plan/Plat
Date: FEBRUARY 27, 2008
The above referenced application
is CONDITIONALLY APPROVED as listed below.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
Fire Marshal (910)893-7580:
Approve:
ON THE VICINITY MAP NC 87/24 SHOULD BE LISTED AS "NC
E911/Addressing (910)814-2038:
87 S".
Conditionally Approve:
SOUTH OF THE NC 87 S AND NC 24 INTERSECTION THE
ROAD SHOULD BE LISTED AS "NC 24-87".
THE CIRCLED 24 SHOULD BE LISTED AS "NC 24".
ROAD SIGN FEE NEEDS TO BE PAID
Update FIRM panel info (3710956400J, effective October 3,
Planning Department (910)893-7525:
2006)
Conditionally Approve:
Show total acreage of development
Note total # of proposed lots
Note that fire hydrants and street lights will be installed per
Harnett County Subdivision Regulations.
Note that Buffalo Lakes Rd is on the NCDOT Thoroughfare
Plan
Note that this development is within the Highway Corridor
Overlay District
Show street length and note that it will be public.
Note who will maintain drainage easements.
30’ streetscape buffer required along lot #8.
Streetscape buffer needs to be planted, or bonded
Street lights need to be installed, or provided a letter from
the contractor.
• The Utility Contractor must schedule the final inspection with
Public Utilities (910)893-7575:
HCDPU on the water and sewer lines installed to serve Buffalo
Conditionally Approve:
Lakes Business Park. If a punch list is generated from the final
inspection, then the punch list items must be completed to satisfy
HCDPU requirements.
• The Utility Contractor must schedule the draw down test on the
sewer lift station following the final inspection on the water and
sewer lines. If a punch list is generated from the draw down test,
then the punch list items must be completed to satisfy HCDPU
requirements.
• The PE must provide HCDPU with a complete set of As-Built
BUFFALO LAKES BUSINESS DECISION
3/16/2009
1
Record
Drawings (mylar, paper & digital formats) on the water and sewer
improvements installed to serve the Buffalo Lakes Business Park.
installed to serve Buffalo Lakes Business Park.
• The PE must provide HCDPU with a Final Certification on the sewer
improvements installed under Permit # WQ0031882.
• The Developer must provide HCDPU with a cost statement for the
water and sewer improvements installed to serve Buffalo Lakes
Business Park.
Environmental Health (910)893-7547:
Approve:
LONG RANGE CONDITIONS
The following conditions must be satisfied
Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.
Public Utilities (910)893-7575: The Developer must provide HCDPU with a one (1) year warranty for
the water and sewer improvements installed to serve the Buffalo Lakes
Business Park.
Development Review Board
Chairman
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2)
business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all
items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait,
as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Friday following the meeting
the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with
Planning Staff to discuss other potential options.
BUFFALO LAKES BUSINESS DECISION
3/16/2009
2