HomeMy WebLinkAboutMcLamb_SRHARNETT COUNTY
BOARD OF ADJUSTMENTS
September 14,2026
Staff Contact: Emma Harris, Planner I
(910) 893-7525 Email: eharris@harnett.org
CASE NUMBER: BOA2608-0002
APPLICANT: Brianna Marie McLamb
OWNER: Brianna Marie McLamb
LOCATION: GEORGE LEE PERRY RD DUNN, NC 28334
ZONING: RA-30 and Commercial
ACREAGE: +/- 1.00 PIN# 1537-16-2975.000
LAND USE CLASSIFICATION: Employment Growth Area
REQUEST: Singlewide Manufactured Home in the RA-30 Zoning District
AERIAL:
Directions from Lillington: Travel to US-421 S/E Cornelius Harnett Blvd/US Hwy 421 S– Take Leslie
Cambell Avenue to NC-27 E– Turn right onto Hodges Chapel Rd – Turn right onto George Perry Lee Rd
– Arrive at the parcel.
LAND USE CLASSIFICATION MAP
ZONING DISTRICT MAP
PHYSICAL CHARACTERISTICS
A. Site: Vacant parcel.
B. Surrounding Land Uses: Heavy Manufacturing, warehousing, various residential sites, agricultural, and
forestry related land uses.
C. Utilities: Water – Private Well Sewer – Private Septic
TRANSPORTATION:
• Annual daily traffic count for this section of George Perry Lee Rd is unavailable but the adjacent Hodges
Chapel Rd has a traffic county of 1500 vehicle trips per day.
• Site distances are good.
BACKGROUND:
• Applicants are proposing to place a singlewide manufactured home on the property within the area zoned
RA-30 as indicated on the site plan.
• The singlewide manufactured home is only eligible to be placed within the area of the property located in
the RA-30 zoning district. The Board does not have the authority to grant the use within the commercial
zoning district.
• If the applicant’s request for a Special Use Permit is approved, the next stage in the development process
will be to obtain all required permits associated with the set-up of the manufactured home. The process will
include the necessary reviews and inspections to ensure all regulatory codes and guidelines are adhered to as
well as any conditions that the Board of Adjustment may place on the requested land use.
UNIFIED DEVELOPMENT ORDINANCE REGULATIONS
ARTICLE V. USE REGULATIONS
1.2 Table of Use Types & Regulations
Zoning Districts IND LI COMM O&I CONS RA-40 RA-30 RA-20R RA-20M PARKING USE GROUP LEVEL BUILDING CODE CLASS Manufactured Homes (on
individual parcel) S* P* P* 2 per
dwelling
unit
1 R-3
3.1.2 Manufactured Homes
RA-30 Zoning District
All requirements or conditions shall be met prior to issuance of a Certificate of Occupancy
(CO) for the home.
A. The structure shall be built to the HUD code for manufactured homes.
B. The structure shall have an a-pitched roof that is covered with material commonly used in standard
residential roofing construction. Said material shall be installed properly and be consistent in appearance.
C. The structure shall have underpinning consisting of a brick curtain wall or have galvanized metal sheeting,
ABS, or PVC plastic color skirting with interlocking edges, installed around the perimeter of the home.
Skirting shall be consistent in appearance, in good condition, continuous, permanent, and unpierced except
for ventilation and access.
1. In cases where the proposed home is located in Flood Zone AE, the home shall be located on a
masonry foundation only, with approved flood vents or breakaway skirting. See “Flood Damage
Prevention” Section of this Ordinance for more information.
D. The exterior siding shall consist predominantly of vinyl, aluminum, wood or hardboard; and shall be
comparable in composition, appearance, and durability to the exterior siding commonly used in standard
residential construction. Said exterior siding shall be in good condition, complete, and not damaged or
loose.
E. The tongue or towing device shall be removed.
HARNETT COUNTY COMPREHENSIVE GROWTH PLAN (HORIZONS 2040)
VISION
Harnett County is a unified, safe, healthy, and engaged community that is culturally vibrant, well-planned with a
thriving economy and a high-quality educational system, in harmony with its environmental and beautiful natural
resources, and with strong leadership ensuring equitable services so that all citizens will prosper.
FUTURE LAND USE CATEGORIES/
Employment Growth Area: These areas are located along major thoroughfares and include prime locations for
economic development opportunities. Uses encouraged in the Employment Growth Areas include but are not
limited to industrial, warehouse, office, research and development, tech flex, medical, energy, and distribution.
Residential development is appropriate only when not in conflict with existing or future industry or commercial
uses or focal development areas.
LAND USE GOALS & STRATEGIES
H-1: Accommodate a mixture of housing types in appropriate areas.
Strategy 1A: Ensure zoning policies continue to provide ample opportunity for a variety of housing types.
SITE PHOTOS
SUBMITTED SITE PLAN