HomeMy WebLinkAbout05-12-26 Work Sessionl'-
149
Dunn City Council
Work Session
Tuesday, May 12, 2026
6:30 p.m., Dunn Municipal Building
Minutes
PRESENT: Mayor William P. Elmore Jr., Mayor Pro Tern April Gaulden, Council Members
Raquel McNeil, Alan Hargis, and Billy N. Tart.
ABSENT: Council Members 1. Wesley Sills and Dr. David L. Bradham
ALSO PRESENT: City Manager Justin Hembree, Assistant City Manager Billy R. Godwin,
Finance Director Cary McNallan, Senior Planner Stephanie Goodrich, Police Chief Lynn Gay,
Administrative Support Specialist Christy Sweeney; CityAttorney'Tilghman Pope and City Clerk
Melissa Matti.
CALL TO ORDER
Mayor William P. Elmore, Jr. called the City Council Work Session to order on Tuesday, May
12, 2026, at 6:30 PM at the Dunn Municipal Building, 401 East Broad Street, Dunn, North
Carolina.
INVOCATION & PLEDGE OF ALLEGIANCE
The invocation and Pledge of Allegiance were led by Council Member Alan Hargis.
CONSIDERATION & APPROVAL OF THE AGENDA
Mayor Elmore called for a motion to approve the agenda as presented.
Motion by Council Member Tart and seconded by Council Member Hargis to approve
the agenda as presented. The motion carried unanimously.
CONSENT AGENDA
• Approval of April 28, 2026 Regular Meeting Minutes
• 66th Annual Public Works Week (May 17-23, 2026) Proclamation. Acopy ofthe Public works
Week Proclamation is incorporated into these minutes as Attachment #1.
Mayor Elmore noted that two (2) Council members were unable to attend due to prior
obligations, but that a quorum was present. Both Consent Agenda items were brought
forward together for approval.
Motion by Mayor Pro Tern Gaulden and seconded by Council Member Hargis to
approve the Consent Agenda as presented. The motion carried.
ITEMS FOR DISCUSSION & CALENDARING FOR MAY 26, 2026
Designated Truck Routes
& No Through Trucks - Phase 2
Lieutenant Apelles Hart presented Phase 2 of the City's truck route review, building on the
prior Work Session discussion. He explained that the presentation covered three (3) areas:
the Proposed Designated Truck Routes, the No -Through -Truck Routes, and a Proposed City
Ordinance Amendment.
As a recap from Phase 1, Lieutenant Hart noted that the City currently has twenty-nine (29)
outdated Designated Truck Routes, and that under the existing codification, any route that is
not specifically designated a Designated Truck Route is essentially a No -Through -Truck
Route.
Proposed Designated Truck Route
Lieutenant Hart presented a map showing a single proposed Designated Truck Route,
depicted in yellow, running north -to -south and east -to -west through` Dunn. This route
Mirrors the secondary alternate route already established by the North Carolina Department
of Transportation (NCDOT) for use in emergencies such as an I-95 closure, so the City
adopted it rather than creating a new designation. Red lines on the map indicated streets
where No -Through -Truck signage is already posted.
Council DiscussiononRoute Concerns
fF3f,
Council Member Hargis raised a recurring concern about South Wilson Avenue, which is not
currently on the No -Through -Truck list but has been a source of repeated complaints. He
described a pattern of trucks turning onto Wilson Avenue to bypass the congested US-301
intersection, traveling down to Pearsall Street; and in the process repeatedly damaging cable
lines along the route. He noted that he had previously requested no -truck access on that
street. Lieutenant Hart explained that the purpose of the ordinance amendment is precisely
to address such situations —once the new framework is in place, officers will be able to
properly enforce the law and issue citatiogson any street not on the designated route, absent
a legitimate delivery reason.
Council Member Billy Tart raised a safety concern about the proposed route directing trucks
to turn left onto Granville Street to access US-301, noting that the intersection at Granville
and Ellis Avenue is not well -suited for large tractor -trailers making that turn, particularly
under congested conditions. He suggested that a safer.alternative would be to designate
Jonesboro Road as a Designated Truck rather than Granville Street since that street runs
through a residential corridor. Lieutenant Hart acknowledged the concern and agreed to
explore that option with NCDOT, noting that any modification to the, route along a DOT -
maintained road would requireNCDOT's approval. City Manager Justin Hembree clarified
that the approach would likely be to request NCDOT add Jonesboro Road as an alternate
truck corridor in addition to the existing US-301 route.
Enforcement
The Council asked how officers would determine whether a truck had a legitimate reason to
be on a non -designated street. Lieutenant Hart explained that officers would stop trucks
found on non -designated routes and ask for documentation. Truck drivers are required to.
carry logs indicating their origin and destination, and if no delivery or legitimate business
purpose can be established for that street, a citation may be issued. He noted that
enforcement activity, once begun, tends to produce results quickly, as word spreads among
drivers.
Ordinance Amendment
City Manager Hembree summarized the overall intent of the amendment: to correct a
historical misunderstanding in which streets were codified as designated truck routes'when
the intent was to identify delivery areas —effectively making almost every City street a
designated truck route. The proposedamendment, drafted by staff, would establish a single
designated truck route, after which all other streets would be inherently no -through -truck
routes subject to enforcement. The amendment also updates the definition of "commercial
vehicle" to align with NCDOT's standards, avoiding the need to separately update the City's
own definitions going forward.
Lieutenant Hart confirmed he would follow up with NCDOT regarding the potential addition
of Jonesboro Road to the truck route. No formal action was taken; the item is calendared for
the May 26, 2026 regular meeting.
Rezoning/Map Amendment RZ-26-02)
809 & 811 E Cumberland Street
Planner Goodrich presented a preview of a rezoning request for the properties at 809 and
811 East Cumberland Street, proposing a map amendment from Office and Institutional
'(0&I) to General Commercial(C-3); consistent with the surrounding commercial corridor.
The Planning Board has reviewed the request and forwarded it with a unanimous
recommendation of approval. The two (2) lots have been recombined into a single parcel,
and site plans are currently undergoing Technical Review Committee review.
City Manager Hembree clarified that no action was requested at this meeting; the item is
scheduled for a formal Public Hearing and full presentation at the May 26, 2026. Regular
meeting:
Mayor Elmore expressed his primary concern regarding traffic, specifically the need for a
turn lane in front of the subJect property, drawing a comparison to the backup issues
experienced at the Starbucks location across US-421. Ms. Goodrich confirmed that NCDOT
has been invited to comment as part of the site plan review process, though a response has
not yet been received.
Data Center' Discussion
151
City Manager Hembree presented a staff overview of data centers, their characteristics, and
the emerging regulatory landscape, noting that research for the presentation was largely
conducted by staff member Alex Abling.
Overview and Context
A data center, as defined for purposes of this discussion, refers to the physical building that
houses and stores data —not the data itself. Data centers range from small server rooms to
large hyperscale facilities exceeding 10,000 square feet, consuming megawatts of electricity
and significant volumes of water. Examples of large-scale facilities already operating in
North Carolina include Google's data center in Lenoir, an Apple facility in Catawba County,
and a Facebook facility in Bradford County.
Benefits and Concerns
Staff presented both sides of the issue. Potential benefits include property tax revenue
(particularly from the building and equipment), construction -phase employment, possible
community infrastructure contributions, and the potential to attract ancillary tech industry
activity. Concerns noted included significant environmental impact (diesel generator
exhaust, PFAS), very high water consumption for cooling systems, high energy demand and
grid strain, a notably low number of permanent jobs relative to building size, and localized
noise and light pollution. Staff cited a Federal study acknowledging that the true long-term
impact of data centers remains under -researched due to the novelty and pace of the land use
type.
Legislative and Regulatory Landscapes
At the Federal level, the Clean Cloud Act (HR 6179) has been introduced to place energy
accountability standards on data centers. At the State level, Bills under consideration include
one that would remove tax incentives for data centers and the Ratepayer Resource
Protection Act, which addresses who bears the cost of grid expansion needed to serve these
facilities. Both State Bills are in committee.
Locally, City Manager Hembree noted that North Carolina General ,Statute 160D allows
municipalities and counties to adopt temporary development moratoriums for the purpose
of studying a land pse and developing appropriate regulations. Five counties in central North
Carolina have already adopted moratoriums, including Harnett County, which acted the
week prior. Several municipalities including Apex, Wendell, and Durham have also adopted
moratoriums, and Cumberland County is actively discussing one.
Current Status in Dunn
Based on staff analysis, approximately twenty (20) parcels within Dunn's planning
jurisdiction could currently meet conditions for a data center under the existing ordinance,
primarily within the I-100 (Heavy Industrial) zoning district, assuming a minimum of ten
(10) acres and a 500-foot buffer from residential areas. City Manager Hembree stressed that
because data centers are not explicitly listed in Dunn's Unified Development Ordinance, staff
is currently relying on interpretation of other uses =and that if a qualifying applicant walked
into the Planning Department tomorrow, there may be limited grounds to deny a zoning
permit. Any approval would also require a public utilities review to ensure adequate water
supply capacity. City Attorney Tilghman Pope confirmed that Harnett County's moratorium
does not apply within the City of Dunn's jurisdiction.
Council Discussion and Direction.
Mayor Elmore expressed support for a 6-month moratorium, citing concern that allowing a
data center to consume industrial land and City Water resources for a use that generates
very few permanent jobs would undermine the City's Economic Development priorities.
Council Member Hargis agreed and asked about counties that have chosen to permit data
centers. City Manager Hembree indicated those decisions were likely driven by the
significant addition to the tax base, particularly in more ruraicounties, and noted that at least one recent attempt to locate a data center near Tarboro was denied and has since resulted
in litigation.
City Attorney Pope noted that a moratorium under 160D would require a Public Hearing
before formal adoption, and that it would buy staff the time needed to properly address a
land use that is not currently defined in the City's ordinance. He confirmed that the Council
could lift the moratorium. at any time. The consensus of the Council was to direct staff to
prepare a Moratorium Ordinance for consideration, with a Public Hearing to be calendared
152
for the May 26, 2026 Regular meeting if the timeline permits. A copy ofthe Data Center Presentation
is incorporated into these minutes as Attachment #2.
Dunn Representative for
Harnett CounV Library Board of Trustee
City Manager Hembree introduced Dunn Branch Library Manager Leslie Schultz, who was
present to provide an annual update on library operations. He noted that the anticipated
appointment recommendation for a seat on the Harnett County Library Board of Trustees
was withdrawn because the prospective appointee was no longer available, and that portion
of the agenda item was deferred.
Ms. Schultz, who has served as Dunn Branch Manager since April 21, 2025, provided the
following statistical highlights for the past year:
• Circulations: 47,977 items circulated, including books, magazines, audiobooks, DVDs,
and various specialty kits.
• Patron Visits: 43,396 visits to the branch.
• Programs: 261 programs held across all age groups, with 4,094 total program
attendees. Programming included adult and youth cooking classes, book clubs, fitness
classes, computer literacy classes, and story times.
• Resources: The branch offers access to Libby (digital books and audiobooks), NC LIVE
databases, Northstar Digital Literacy, Ancestry.com, and the Thousand Books Before
Kindergarten program.
Ms. Schultz thanked the Council and City staff for improvements made to the library facility
over the pastyear, including bathroom upgrades, a new HVAC unit, a ramp for the book drop,
parking lot restriping, grounds maintenance, and pest control. Upcoming branch events
include a screening of the Paul Green documentary Playmaker on May 29, a Summer Reading
Program kickoff on June 1, and a book sale at the main Lillington branch on June 5-6.
REPORTS & UPDATES
City Manager's Report
Upcoming Agenda Items
City Manager Hembree noted that the May 26, 2026 Regular Meeting agenda is relatively
light, as a Special Use Permit previously expected for that meeting has been delayed to June.
The primary substantive item anticipated is a budget discussion, as the Council works
toward finalizing and publishing the formal recommended budget. He indicated he would be
reaching out to Council members to schedule additional two (2) -by-two (2) Budget
Meetings. Mayor Elmore noted that a Special Workshop Meeting could be called if needed.
Highway 301 South Elevated Storage Tank
Assistant City Manager Godwin provided an update on the construction of the half -million -
gallon elevated water storage tank on Highway 301 South, which will be the City's fourth
water storage tank. Construction is divided into five (5) phases: preconstruction, fabrication,
tank construction, painting, and punch list.
The preconstruction phase, including foundation work, was completed in March 2026. The
fabrication phase —during which tank components are manufactured off -site —is scheduled
for June and July. A gap of several months then exists on the contractor's schedule before the
on -site tank construction phase begins in October, with completion expected in mid -January
2027. Painting and punch list work would follow, with full project completion anticipated in
early spring 2027.
Assistant City Manager Godwin noted that the tank was originally scheduled for completion
in fall 2026. Staff has engaged the project's managing engineering firm to seek an explanation
from the tank contractor, Phoenix, for the delays and the gaps in the schedule. Council
Member Hargis asked whether a penalty provision existed for delays. Mr. Godwin confirmed
there is a liquidated damages clause of $2,000 per day of delay, and that staff is actively
raising that provision with the contractor's team to determine whether it may apply.
West Broad Street Paving
City Manager Hembree addressed questions the Council has been fielding from residents
regarding the status of West Broad Street paving. He explained that the paving project is
153
currently on a planned two -week pause and then work will resume. However, the West
Broad Street segment requires a more complex approach than a standard resurfacing due to
the need for curb and gutter work and issues related to truck loading areas in front of
businesses such as Sherwin-Williams.
As a first step, the City has engaged East Coast Land Surveying to conduct a Survey and
Topographic Assessment of the corridor. City Manager Hembree explained that over years
of paving activity, the road surface has likely crept outside the original right-of-way, and a
precise survey is needed to determine the correct road alignment and right-of-way
boundaries before any reconstruction work is designed. The Topo Survey will also help
address existing stormwater drainage concerns in the area. Once survey data is available,
staff plans to consult with the contractor, Holland, on the best approach for reconstructing
the segment.
Family Day Picnic
City Manager Hembree reminded Council members and staff of the City's Annual Family Day
Picnic scheduled for Friday, beginning at 4:30 PM. Activities include cornhole, an egg race,
and a home run derby at one of the City's baseball fields.
ANNOUNCEMENTS
Mayor Elmore announced that Farm Family Medical Center has opened on US-421, in the
building formerly known locally as the "purple building," across from the former Motorcycle
Madness location. The facility has been substantially renovated. A Grand Opening Ribbon
Cutting is scheduled for Wednesday, May 13, 2026 at 10:00 AM.
Mayor Elmore also reminded the Council that:
• the next Regular meeting is scheduled for May 26, 2026, and
• the next Work Session is scheduled for June 9, 2026.
ADJOURNMENT
Motion by Council Member Hargis and seconded to adjourn. The motion carried
unanimously.
The meeting was adjourned at 7:35 p.m.
ff
William P. Elmore
Mayor
Attest:
GITY .....
:'pORPOggT�?Z
elissa R. Matti _
City Clerk = '�
2. SEAL
CAROB 0%
'�nnun0•