HomeMy WebLinkAboutDuke Energy Lighting contract_Cotton FarmsDuke Energy Progress LED - Company Owned - NC-ALS-66 Contract
LIGHTING Proposal Date: 4/19/2023
SOLUTIONS Prepared by: TOHSIYA TSUJIMURA
Job Title: ENGNIEERING TECHOLOGIST III
Phone: 919-548-7096
Customer Name REECE CONSTRUCTION Corp. ID#:
Street Address 25 DEER TAIL LN Mail Code:
City, State, Zip FUQUAY VARINA Construction Schedule Date:
Customer Phone: 0
CIM Account Number NOT OFFICIAL CONTRACT WO#: 0
Drawing # / Design Description
Service Location of Light(s)0
Pricing Changes Effective 6-1-2021
LED Fixtures Watts # of Items Monthly* Total Cost
LED 50 Roadway / NEIGHBORHOOD 50 @ $7.25 =-
LED 50 FLOODLIGHT 50 @ $10.61 =-
LED 70/75 Roadway 75 @ $7.41 =-
LED 105/110 Roadway 105 @ $9.05 =-
LED 130 FLOODLIGHT 130 @ $21.30 =-
LED 150 Roadway 150 @ $11.59 =-
LED 215/220 Roadway 215 @ $14.15 =-
LED 260 FLOODLIGHT 260 @ $38.75 =-
LED 280 Roadway 280 @ $15.93 =-
LED 150 Sitelighter (MFC) Not for New Installs 150 @ $15.69 =-
LED 150 Shoebox (MFC) 150 @ $14.80 =-
LED 205/220 Shoebox w/MFC - Not for New Installs 205 @ $18.11 =-
LED 220 Shoebox 220 @ $18.08 =-
LED 420 Shoebox 420 @ $38.30 =-
LED 530 Shoebox 530 @ $46.54 =-
LED Post Top Fixtures
Mini Bell (MFC) 50 @ $12.19 =-
Traditional /Traditional Open (MFC) 50 18 @ $9.76 =175.68
Pedestrian Shoebox "S" (MFC) 50 @ $11.49 =-
Acorn "A" (MFC) 50 @ $8.02 =-
Mitchell With Top Hat 50 @ $13.34
Enterprise 50 (MFC) 50 @ $11.86 =-
Enterprise 150 (MFC) 150 @ $15.35 =-
Enterprise 220 (MFC) 220 @ $16.84 =-
Standard Pole(s)Mounting Height # of Items Monthly* Total Cost
Wood Pole 25', 30', 35' @ $2.09 =-
16' Black Fiberglass Pole 16' 18 @ $4.97 =89.46
Gray Fiberglass Pole / Metal** Pole 25', 30', 35' @ $4.97 =-
Decorative Square Metal Pole 30' @ $10.66 =-
Non Standard Pole(s)Mounting Height # of Items Monthly* Total Cost
Black Fiberglass Poles (MFC) 25' @ $6.55 =-
Black Fiberglass Poles (MFC) 30' @ $7.37 =-
Black Fiberglass Poles (MFC) 35' @ $7.97 =-
Black Decorative Round 35' Steel Pole (MFC) 35' @ $27.14 =-
Style "A" Alum Direct Embed Poles (MFC) 12' @ $10.52 =-
Style "A" Alum Direct Embed Poles (MFC) 17' @ $11.89 =-
Style "A" Alum Anchor Base Poles (MFC) 12' and 17' @ $18.03 =-
Tenon Adapter (MFC)@ $1.82 =-
(Use when Site Lighter(s) are mounted on Round Black Fiberglass and Round Black Tapered Steel Poles. One adapter is used for each pole.
Monthly Underground Service Charge # of Items Monthly* Total Cost
Per Pole NC 18 @ $3.24 =58.32
One-Time Underground Service Charge # of Items One-time Charge Total Cost
Per Pole NC @ $580.00 =-
One-Time LED Conversion Charges (Lights Less than 20 years old) # of Items One-time Charge Total Cost
Fixtures @ $50.00 =-
Poles @ $500.00 =-
Total Proposed "Monthly" Charges Before Taxes Subtotal 323.46
7% Tax 22.64
Total 346.10$
Total Proposed One-Time Charges Subtotal -
7% Tax -
The term of the contract shall be __5__ years from date of installation. ***Total -$
Comments:
Print Name/Title:
Signature:Date:
* The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be
adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs.
** Limited Design Availability
*** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area
Lighting Service Schedule.
I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and
contract term as outlined in the Company's rate schedule.