Loading...
HomeMy WebLinkAboutLighting contract example for cotton farmsDuke Energy Progress Area Lighting NC-ALS-66 Contract . Customer Name Street Address City, State, Zip Customer Phone: CIM Account Number Drawing # / Design Description Service Location of Light(s) Pricing Changes Effective 6-1-2021 Light Fixture / Pole Type Sodium Vapor Area Lights - No Longer Available to New Applicants Semi-Enclosed Semi-Enclosed, Cutoff Enclosed Post Top (Styles "A", "S" & "M") *Decorative Black Cutoff Enclosed Cutoff Enclosed * Decorative Black Cutoff Enclosed Frozen to Existing Matchups (Encl) (Shoebox - No longer Available) *Shoebox Forward Throw (No longer Available) Cutoff Enclosed, Shoebox (Shoebox-No longer Available) *Decorative Black Cutoff Enclosed *Shoebox Forward Throw (No longer Available) Cutoff Enclosed, Shoebox (Shoebox-No longer Available) *Shoebox Forward Throw (No longer Available) NOTE: *The Unit Monthly Charge for these lights includes an additional facilities charge Sodium Vapor Floodlights - No Longer Available to New Applicants Flood Flood Flood Metal Halide (Not for New Installs Effective 5/17) Shoebox (No Longer Available) Post Top (Styles "A", "S" & "M") Flood Cutoff Enclosed, Shoebox, Flood *Decorative Black Cutoff Enclosed *Shoebox Forward Throw (No longer Available) Cutoff Enclosed, Shoebox, Flood *Shoebox Forward Throw (No longer Available) Shoebox, FT Shoebox, Cube, Flood NOTE: *The Unit Monthly Charge for these lights includes an additional facilities charge Poles / Posts Wood Pole Gray Fiberglass Pole / Metal** Pole 16' Black Fiberglass Post 12' Smooth Black Concrete Post 16' Smooth Black Concrete Post 30' Decorative Square Metal Pole 13' Fluted Black Concrete Post (Style VII) 13' Fluted Black Concrete Post w/Receptacle (Non Std) 13' Fluted Black Concrete Post w/Receptacle (Non Std) 12' Decorative Aluminum Post 35' Decorative Tapered Metal Pole (Bronze/Black) UG Service Charge (per pole). Total Standard Monthly Charges Additional Facilities Monthly Charges (See Attached Page) Prices and terms per North Carolina Area Lighting Rate Schedule ALS-66 effective 6-1-2021 The term of the contract shall be ___ years from date of installation. *** Total Proposed Monthly Charges One Time Underground Service Charge Per Pole NC Other One Time Charges From Attached Page Total One Time Charges Before Taxes The term of the contract shall be ___ years from date of installation. *** Total Proposed One-Time Charges Comments: I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as outlined in the Company's rate schedule. Print Name/Title: Signature: * The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs. ** Limited Design Availability *** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area Lighting Service Schedule. Rates - North Carolina - ALS 5800 S/V 9500 S/V 16000 S/V 28500 S/V 50000 S/V 50000 S/V Flood 9000 M/H 20000 M/H 33000 PS M/H 40000 M/H 110000 M/H 22000 S/V 7000 M/V Duke Energy Progress Area Lighting NC-ALS-66 Contract Pricing Changes Effective 6-1-2021 Prices and terms per North Carolina Area Lighting Rate Schedule ALS-66 effective 6-1-2021 LIGHTING SOLUTIONS Lumens 5800 9500 9500 9500 16000 16000 22000 22000 28500 28500 28500 50000 50000 9500 28500 50000 9000 9000 20000 20000 20000 33000 40000 110000 (MFC) (MFC) (MFC) w/Monthly Receptacle Charge (MFC) w/Up-Front Receptacle Charge (MFC) Cost 6.33 10.06 11.75 14.23 19.71 22.13 11.94 17.16 22.22 23.21 43.53 12.49 8.87 Watts 70 100 100 100 150 150 200 200 250 250 250 400 400 100 250 400 100 100 250 250 250 350 400 1000 Proposal Date: Prepared by: Job Title: Phone: # Items 47 30 @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ Date: 7/9/2021 BILL BRYAN ENGINEERING TECHNOLOGIST III 919-239-0671 Corp. ID#: Mail Code: Construction Schedule Date: WO#: Monthly Charge* 6.33 10.06 10.06 10.44 11.75 12.2 12.49 12.85 14.23 14.85 14.81 19.71 20.29 10.06 14.23 22.13 11.94 11.94 17.16 17.58 46.54 18.08 23.21 43.53 2.09 4.97 4.97 17.46 18.86 10.66 17.09 20.17 17.09 17.45 27.72 3.24 Subtotal 7% Tax Total 580 Subtotal 7% Tax Total = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = Monthly Cost 0 0 0 0 0 0 587.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 319.8 0 0 0 0 0 0 906.83 0 906.83 63.4781 970.3081 0 0 0 0 0 4/5/2018 0.38 0.45 0.62 0.42 0.29 0.38 17.46 18.86 17.09 20.17 17.09 Duke Energy Progress Other Lighting Item Prices NC-ALS-66 Contract Customer Name Street Address City, State, Zip Customer Phone: CIM Account Number Drawing # / Design Description Service Location of Light(s) Pricing Changes Effective 6-1-2021 Black Fiberglass Poles (Monthly Facility Charge) NOTE: 10 Year Contract Period Tenon Adapter for Shoebox Fixtures (Special Order) Style "A" Alum Direct Embed Poles (Facility Charge) Style "A" Alum Anchor Base Poles (Facility Charge) Black Decorative Round 35' Steel Pole Standard Poles-Galvanized MFC+ + Fiberglass poles should have been installed but were not due to customer preference. Early On Photo Control (Car Lots, etc.) Non Std Wood Pole Bracket 10' Mast Arm 16' Mast Arm Transformers for "Lighting Only" (MFC) Overhead Service - (OH 13.2 kv) 3 KVA Pole Mount……………………….. Overhead Service - (OH 7.2 kv) 3 KVA Pole Mount……………………….. Overhead Service - (OH 13.2 kv) 10 KVA Pole Mount……………………….. Overhead Service - (OH 7.2) 10 KVA Pole Mount……………………………. Underground Service - (UG 13.2 kv) 25 KVA Pad Mount………………….. Underground Service - (UG 7.2 kv) 25 KVA Pad Mount……………………. Miscellaneous Additional Facilities/Monthly Facilities Charges Details : Total Proposed Monthly Charges Before Taxes One Time Pole Hand-Dig / Hand-Set Surcharge (CIAC) - Per Pole One Time Hand Dig Pole Hole ONLY (CIAC) - Per Pole Underground Boring Service Charge Total Proposed One Time Charges Before Taxes The term of the contract shall be ____ years from date of installation. ** Comments: I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as outlined in the Company's rate schedule. Print Name/Title: Signature: * The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs. ** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area Lighting Service Schedule. Duke Energy Progress Other Lighting Item Prices NC-ALS-66 Contract LIGHTING SOLUTIONS 0 0 0 0 0 0 0 Mounting Height 25' 30' 12' 17' 12' and 17' 35' Mounting Height 30' 35' Proposal Date: Prepared by: Job Title: Phone: # of Items # of Items # of Items # of Items # of Items # of Items Date: @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ 7/9/2021 BILL BRYAN ENGINEERING TECHNOLOGIST III 919-239-0671 Corp. ID#: Mail Code: Construction Schedule Date: 0 WO#: Monthly* 6.55 7.37 1.82 10.52 11.89 18.03 27.14 Monthly* 11.85 11.44 Monthly* 0.21 Monthly * 0.63 1.55 Monthly 7.78 9.68 11.3 10.18 19.82 22.16 Monthly* Total 300 140 Total 0 = = = = = = = = = = = = = = = = = = = = = = = = Total Cost 0 0 0 0 0 0 0 Total Cost 0 0 Total Cost 0 Total Cost 0 0 Total Cost 0 0 0 0 0 0 Total Cost 0 0 0 0 0 0 6.55 7.37 1.82 10.52 11.89 18.03 27.14 11.85 11.44 0.21 0.63 1.55 7.78 9.68 11.3 10.18 19.82 22.16 4/5/2018 Add these to the LED page also Add these to the LED page also Add these to the LED page also May need to move to Std page 1/1/2020 1/2/2020 1/3/2020 Duke Energy Progress Sanibel, Teardrop & Mongoose NC-ALS-66 Contract Customer Name Street Address City, State, Zip Customer Phone: CIM Account Number Drawing # / Design Description Service Location of Light(s) Pricing Changes Effective 6-1-2021 Teardrop - Nonstandard Sodium Vapor (Black) Metal Halide (Black) (Not for New Installs Effective 5/17) Sodium Vapor (Jade Green) LED 50 LED 150 Black Concrete Pole(s) (MFC) Existing Galvanized Metal (painted black)* Existing Metal Distribution (painted black)* 6' Black Single Bracket 6' Black Twin Bracket Sanibel (MFC) Sodium Vapor Metal Halide (Not for New Installs Effective 5/17) LED 50 LED 150 Sanibel Shepherd's Crook Arm (MFC) Single Arm Twin Arm Sanibel Posts with 6" Tenon 12' Smooth Black Concrete Post (MFC) 16' Smooth Black Concrete Post (MFC) Mongoose Sodium Vapor Hi-Tilt Sodium Vapor Lo-Tilt Sodium Vapor Lo-Tilt Monthly Underground Service Charge Per Pole NC Total Proposed Monthly Charges Before Taxes One-Time Underground Service Charge Per Pole NC One-Time LED Conversion Charges (Lights Less than 20 years old) Fixtures Poles The term of the contract shall be ____ years from date of installation. ** NOTE: Additional upfront cost are applicable for existing poles that are painted black. Also, these poles will be billed monthly at the special metal pole rate. Lead-based paint on existing metal distribution poles must be stripped per Duke Energy Progress guidelines and poles repainted black. Comments: I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as outlined in the Company's rate schedule. Print Name/Title: Signature: * The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs. ** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area Lighting Service Schedule. Rates - North Carolina - ALS 28,500 HPS 20,000 M/H 50,000 S/V (Not the Flood Price) 9,500 S/V 9,000 M/H LED TEARDROP (LED Basic 150 RATE) LED TEARDROP/Sanibel (LED Basic 50 RATE) Sanibel LED 75 (Standard Rate) Sanibel LED 150 (Basic Rate) MFC Sanibel LED 150 - MFC Charge Sanibel LED 50 Teardrop LED 50 Duke Energy Progress Sanibel, Teardrop & Mongoose NC-ALS-66 Contract LIGHTING SOLUTIONS 0 0 0 0 0 0 0 Lumens 28500 20000 28500 Mounting Height 27' Various Various Lumens 9500 9000 Mounting Height 12' 16' Lumens 28500 28500 50000 Cost 14.23 17.16 19.71 10.06 11.94 11.59 7.25 5.62 11.59 7.45 6.71 9.04 Watts 250 250 250 50 150 Watts 100 100 50 150 Watts 250 250 400 Proposal Date: Prepared by: Job Title: Phone: # of Items # of Items # of Items # of Items # of Items # of Items # of Items # of Items # of Items Date: @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ 7/9/2021 BILL BRYAN ENGINEERING TECHNOLOGIST III 919-239-0671 Corp. ID#: Mail Code: Construction Schedule Date: 0 WO#: Monthly* 22.4 25.1 24.26 16.29 21.67 Monthly* 22.17 0.34 0.35 Monthly* 12.74 16.11 14.13 19.04 Monthly* 5.01 6.96 Monthly* 17.46 18.86 Monthly* 16.44 15.88 21.62 Monthly* 3.24 Total One-time Charge 580 One-time Charge 50 500 0 = = = = = = = = = = = = = = = = = = = = = = = = = = Total Cost 0 0 0 0 0 Total Cost 0 0 0 0 0 Total Cost 0 0 0 0 Total Cost 0 0 Total Cost 0 0 Total Cost 0 0 0 Total Cost 0 0 Total Cost 0 Total Cost 0 0 8.17 7.94 10.03 9.04 10.08 22.17 0.34 0.35 2.68 4.17 6.88 7.45 5.01 6.96 17.46 18.86 2.21 1.65 1.91 8/29/2019 7/3/2020 7/3/2020 7/3/2020 Duke Energy Progress LED - Company Owned - NC-ALS-66 Contract Customer Name Street Address City, State, Zip Customer Phone: CIM Account Number Drawing # / Design Description Service Location of Light(s) Pricing Changes Effective 6-1-2021 LED Fixtures LED 50 Roadway / NEIGHBORHOOD LED 50 FLOODLIGHT LED 70/75 Roadway LED 105/110 Roadway LED 130 FLOODLIGHT LED 150 Roadway LED 215/220 Roadway LED 260 FLOODLIGHT LED 280 Roadway LED 150 Sitelighter (MFC) Not for New Installs LED 150 Shoebox (MFC) LED 205/220 Shoebox w/MFC - Not for New Installs LED 220 Shoebox LED 420 Shoebox LED 530 Shoebox LED Post Top Fixtures Mini Bell (MFC) Traditional /Traditional Open (MFC) Pedestrian Shoebox "S" (MFC) Acorn "A" (MFC) Mitchell With Top Hat Enterprise 50 (MFC) Enterprise 150 (MFC) Enterprise 220 (MFC) Standard Pole(s) Wood Pole 16' Black Fiberglass Pole Gray Fiberglass Pole / Metal** Pole Decorative Square Metal Pole Non Standard Pole(s) Black Fiberglass Poles (MFC) Black Fiberglass Poles (MFC) Black Fiberglass Poles (MFC) Black Decorative Round 35' Steel Pole (MFC) Style "A" Alum Direct Embed Poles (MFC) Style "A" Alum Direct Embed Poles (MFC) Style "A" Alum Anchor Base Poles (MFC) Tenon Adapter (MFC) (Use when Site Lighter(s) are mounted on Round Black Fiberglass and Round Black Tapered Steel Poles. One adapter is used for each pole. Monthly Underground Service Charge Per Pole NC One-Time Underground Service Charge Per Pole NC One-Time LED Conversion Charges (Lights Less than 20 years old) Fixtures Poles Total Proposed "Monthly" Charges Before Taxes Total Proposed One-Time Charges The term of the contract shall be __5__ years from date of installation. *** Comments: I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as outlined in the Company's rate schedule. Print Name/Title: Signature: * The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs. ** Limited Design Availability *** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area Lighting Service Schedule. Rates - North Carolina - ALS LED 50 (No MFC) LED 50 FLOODLIGHT (No MFC) LED 75 (No MFC) LED 105 (No MFC) LED 130 FLOODLIGHT (No MFC) LED 150 (No MFC) LED 215 (No MFC) LED 260 FLOODLIGHT (No MFC) LED 280 (No MFC) LED 205 Site Lighter/Shoebox (ADD MFC) LED 220 SHOEBOX LED 420 (No MFC) LED 530 (No MFC) Additional Facilities Charges - MFC LED 205 Site Lighter (MFC) Minibell (MFC) LED Traditional /Traditional Open (MFC) Pedestrian Shoebox "S" (MFC) Enterprise 50 (MFC) Enterprise 150 (MFC) Enterprise 220 (MFC) Acorn (MFC) Duke Energy Progress LED - Company Owned - NC-ALS-66 Contract Pricing Changes Effective 6-1-2021 LIGHTING SOLUTIONS REECE CONSTRUCTION 25 DEER TAIL LN FUQUAY VARINA NOT OFFICIAL CONTRACT 0 Watts 50 50 75 105 130 150 215 260 280 150 150 205 220 420 530 50 50 50 50 50 50 150 220 Mounting Height 25', 30', 35' 16' 25', 30', 35' 30' Mounting Height 25' 30' 35' 35' 12' 17' 12' and 17' Cost 7.25 10.61 7.41 9.05 21.3 11.59 14.15 38.75 15.93 11.66 18.08 38.3 46.54 Cost 6.45 4.94 2.51 4.24 4.61 3.76 2.69 0.77 Proposal Date: Prepared by: Job Title: Phone: # of Items 18 # of Items 18 # of Items # of Items 18 # of Items # of Items Date: new new new @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ 4/19/2023 TOHSIYA TSUJIMURA ENGNIEERING TECHOLOGIST III 919-548-7096 Corp. ID#: Mail Code: Construction Schedule Date: 0 WO#: Monthly* 7.25 10.61 7.41 9.05 21.3 11.59 14.15 38.75 15.93 15.69 14.8 18.11 18.08 38.3 46.54 12.19 9.76 11.49 8.02 13.34 11.86 15.35 16.84 Monthly* 2.09 4.97 4.97 10.66 Monthly* 6.55 7.37 7.97 27.14 10.52 11.89 18.03 1.82 Monthly* 3.24 One-time Charge 580 One-time Charge 50 500 Subtotal 7% Tax Total Subtotal 7% Tax Total 0 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = Total Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 175.68 0 0 0 0 0 Total Cost 0 89.46 0 0 Total Cost 0 0 0 0 0 0 0 0 Total Cost 58.32 Total Cost 0 Total Cost 0 0 323.46 22.6422 346.1022 0 0 0 4/5/2018 4.1 3.21 6.45 4.94 2.51 4.24 6.55 7.37 7.97 27.14 10.52 11.89 18.03 1.82 Fix at bottom Fix at bottom 1/1/2020 1/1/2020 1/1/2020 Duke Energy Progress LED - Amber Turtle Fixtures - NC-ALS-66 Contract Customer Name Street Address City, State, Zip Customer Phone: CIM Account Number Drawing # / Design Description Service Location of Light(s) Pricing Changes Effective 6-1-2021 LED Amber Turtle Fixtures LED 70/75 Roadway LED 105/110 Roadway Standard Pole(s) Wood Pole Gray Fiberglass Pole / Metal** Pole Monthly Underground Service Charge Per Pole NC One-Time Underground Service Charge Per Pole NC Total Proposed "Monthly" Charges Before Taxes Total Proposed One-Time Charges The term of the contract shall be 10 years from date of installation. *** Comments: I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as outlined in the Company's rate schedule. Print Name/Title: Signature: * The Monthly Charge is based on the current Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be adjusted to reflect approved charges in subsequent Street Lighting Tariffs. ** Limited Design Availability *** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Street Lighting Service Regulations. Rates - North Carolina - ALS LED 75 (No MFC) LED 105 (No MFC) MFC LED 70 (MFC) LED 110 (MFC) Duke Energy Progress LED - Amber Turtle Fixtures - NC-ALS-66 Contract LIGHTING SOLUTIONS 0 0 0 0 0 0 0 Watts 75 105 Mounting Height 25', 30', 35' 25', 30', 35' Cost 7.41 9.05 Cost 3.33 4.28 Proposal Date: Prepared by: Job Title: Phone: # of Items # of Items # of Items # of Items Date: @ @ @ @ @ @ 12:00:00 AM 0 0 0 Corp. ID#: Mail Code: Construction Schedule Date: 0 WO#: Monthly * 10.74 13.33 Monthly * 2.09 4.97 Monthly * 3.24 One-time Charge 580 Subtotal 7% Tax Total Subtotal 7% Tax Total 0 0 0 = = = = = = Total Cost 0 0 Total Cost 0 0 Total Cost 0 Total Cost 0 0 0 0 0 0 0 4/5/2018 MFC 7.97 27.14 1.82 North Carolina Updated 5/17/2020 Maximo CU LSH-GLARE-RW-LED-50-PUB-P LSH-GLARE-RW-LED-50-PVT-P LSH-GLARE-RW-LED-105-PUB-P LSH-GLARE-RW-LED-105-PVT-P LSH-GLARE-RW-LED-150-PUB-P LSH-GLARE-RW-LED-150-PVT-P LSH-GLARE-RW-LED-215-PUB-P LSH-GLARE-RW-LED-215-PVT-P LSH-GLARE-RW-LED-280-PUB-P LSH-GLARE-RW-LED-280-PVT-P LSH-GLARE-AREA-LED-50-PUB-P LSH-GLARE-AREA-LED-50-PVT-P LSH-GLARE-TRAD-LED-50-PUB-P LSH-GLARE-TRAD-LED-50-PVT-P LSH-GLARE-SBX-LED-205-PUB-P LSH-GLARE-SBX-LED-205-PVT-P LSH-GLARE-SBX-LED-420-PUB-P LSH-GLARE-SBX-LED-420-PVT-P LSH-GLARE-SBX-LED-530-PUB-P LSH-GLARE-SBX-LED-530-PVT-P NOTE: Does not include grossed up amount nor tax WMIS CU's LLRDWYLED05GSC LLRDWYLED05GSC LLRDWYLED10GSC LLRDWYLED10GSC LLRDWYLED15GSC LLRDWYLED15GSC LLRDWYLED22GSC LLRDWYLED22GSC LLRDWYLED28GSC LLRDWYLED28GSC LLAREALED05GSC LLAREALED05GSC LLMCLSGLAREC LLMCLSGLAREC LLSBLED205GSC LLSBLED205GSC LLSBLED420GSC LLSBLED420GSC LLSBLED530GSC LLSBLED530GSC Catalog # 4202956 4202956 4203093 4203093 1524257 1524257 4203092 4203092 1524258 1524258 1534848 1534848 4167888 4167888 1525356 1525356 1525356 1525356 1525356 1525356 Description Shield, AEL ATB0 20LED 50W, 75W Light Shield glare Roadway LED 50W PRIVATE Light Shield glare Roadway LED 105W public Light Shield glare Roadway LED 105W PRIVATE Light Shield glare Roadway LED 150W public Light Shield glare Roadway LED 150W PRIVATE Light Shield glare Roadway LED 215W public Light Shield glare Roadway LED 215W PRIVATE Light Shield glare Roadway LED 280W public Light Shield glare Roadway LED 280W PRIVATE Light Shield glare Area/Neighborhood LED 50W public Light Shield glare Area/Neighborhood LED 50W PRIVATE Light Shield glare Traditional LED 50W public Light Shield glare Traditional LED 50W PRIVATE Light Shield glare Shoebox LED 205W (4 panel) public Light Shield glare Shoebox LED 205W (4 panel) PRIVATE Light Shield glare Shoebox LED 420W (8 panel) public Light Shield glare Shoebox LED 420W (8 panel) PRIVATE Light Shield glare Shoebox LED 530W (10 panel) public Light Shield glare Shoebox LED 530W (10 panel) PRIVATE Installed Cost (MFC) (Engineering Estimate--Not to be quoted to the Customer) 161.74 161.74 164.6 166.42 210.44 251.07 135.07 135.07 189.84 268.03 307.13 1% ~ NC Additional Facility Charge - NORTH CAROLINA 1.61 1.61 1.65 1.65 1.66 1.66 2.11 2.11 2.51 2.51 1.35 1.35 0.94 0.94 1.9 1.9 2.68 2.68 3.07 3.07 NC Up Front Contribution Cost (CIAC) DOES NOT include grossed up amount nor tax 161.74 161.74 164.6 164.6 166.42 166.42 210.44 210.44 251.07 251.07 135.07 135.07 94 94 189.84 189.84 268.03 268.03 307.13 307.13 NEW NEW NEW North Carolina Updated 3/8/2021 Maximo CU LSH-GLARE-RW-LED-MICRO-2X1-HOUSE-___-P LSH-GLARE-RW-LED-MICRO-2X1-STREET-___-P LSH-GLARE-AREA-NEIGH-LED-___-P LSH-GLARE-RW-LED-4X1-___-P LSH-GLARE-RW-LED-6X1-___-P LSH-GLARE-RW-LED-4X2-HOUSE-___-P LSH-GLARE-RW-LED-4X2-STREET-___-P LSH-GLARE-RW-LED-6X2-HOUSE-___-P LSH-GLARE-RW-LED-6X2-STREET-___-P LSH-GLARE-RW-LED-8X2-HOUSE-___-P LSH-GLARE-RW-LED-8X2-STREET-___-P LSH-GLARE-OTRAD-LED-HOUSE-___-P LSH-GLARE-OCA-LED-180-___-P LSH-GLARE-TRAD-LED-WHITE-HOUSE-___-P LSH-GLARE-MTCH-LED-180-___-P LSH-GLARE-TD-CLER-LED-___-P LSH-GLARE-MONT-LED-180-___-P LSH-GLARE-MTCHO-LED-HOUSE-___-P LSH-GLARE-SBX-LED-205-___-P LSH-GLARE-SBX-LED-420-___-P LSH-GLARE-SBX-LED-530-___-P NOTE: Does not include grossed up amount nor tax Item # 1602110 1602111 1525131 1535522 1535526 1524257 1602281 1535528 1602282 1535529 1602295 1602296 1602298 1602300 1524189 1602303 1602304 1602305 1525356 1525356 1525356 Description House Side Shield for Auto Micro Street Side Shield for Auto Micro Light Trespass Shield, Neighborhood (40w, 50w and 70w) Light Trespass Shield, ATB0 50w and 70w Light Trespass Shield, 110w and 150w House Side Shield Light Shield, Larger 150w Street Side Light Shield, Larger 150w House Side Light Shield, 220w and 280w Street Side Light Shield, 220w and 280w House Side Light Shield, Turtle Light Street Side Light Shield, Turtle Light Open Traditional House Side Shield, Ocala Acorn 180 degree White House Side Shield, Traditional 180 degree House Side Shield, Mitchell House Side Shield, Large Teardrop House Side Shield, Monticello Louvered House Side Shield, Open Mitchell and Open Monticello Light Shield glare Shoebox LED 205W (4 panel)  Light Shield glare Shoebox LED 420W (8 panel)  Light Shield glare Shoebox LED 530W (10 panel) 1% Monthly Additional Facility Charge 1.32 1.32 1.09 1.32 1.32 1.38 1.61 1.67 1.61 1.96 1.79 1.11 1.07 1.05 1.37 1.51 1.27 1.14 1.9 2.68 3.07 Up Front Contribution Cost (CIAC) DOES NOT include grossed up amount nor tax 132.04 132.04 108.64 132.04 132.04 138.48 161.29 167.14 161.29 196.39 178.84 110.98 107.47 105.13 136.72 150.76 127.36 114.49 189.84 268.03 307.13 NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW