HomeMy WebLinkAboutLighting contract example for cotton farmsDuke Energy Progress Area Lighting NC-ALS-66 Contract
.
Customer Name
Street Address
City, State, Zip
Customer Phone:
CIM Account Number
Drawing # / Design Description
Service Location of Light(s)
Pricing Changes Effective 6-1-2021
Light Fixture / Pole Type
Sodium Vapor Area Lights - No Longer Available to New Applicants
Semi-Enclosed
Semi-Enclosed, Cutoff Enclosed
Post Top (Styles "A", "S" & "M")
*Decorative Black Cutoff Enclosed
Cutoff Enclosed
* Decorative Black Cutoff Enclosed
Frozen to Existing Matchups (Encl) (Shoebox - No longer Available)
*Shoebox Forward Throw (No longer Available)
Cutoff Enclosed, Shoebox (Shoebox-No longer Available)
*Decorative Black Cutoff Enclosed
*Shoebox Forward Throw (No longer Available)
Cutoff Enclosed, Shoebox (Shoebox-No longer Available)
*Shoebox Forward Throw (No longer Available)
NOTE: *The Unit Monthly Charge for these lights includes an additional facilities charge
Sodium Vapor Floodlights - No Longer Available to New Applicants
Flood
Flood
Flood
Metal Halide (Not for New Installs Effective 5/17)
Shoebox (No Longer Available)
Post Top (Styles "A", "S" & "M")
Flood
Cutoff Enclosed, Shoebox, Flood
*Decorative Black Cutoff Enclosed
*Shoebox Forward Throw (No longer Available)
Cutoff Enclosed, Shoebox, Flood
*Shoebox Forward Throw (No longer Available)
Shoebox, FT Shoebox, Cube, Flood
NOTE: *The Unit Monthly Charge for these lights includes an additional facilities charge
Poles / Posts
Wood Pole
Gray Fiberglass Pole / Metal** Pole
16' Black Fiberglass Post
12' Smooth Black Concrete Post
16' Smooth Black Concrete Post
30' Decorative Square Metal Pole
13' Fluted Black Concrete Post (Style VII)
13' Fluted Black Concrete Post w/Receptacle (Non Std)
13' Fluted Black Concrete Post w/Receptacle (Non Std)
12' Decorative Aluminum Post
35' Decorative Tapered Metal Pole (Bronze/Black)
UG Service Charge (per pole).
Total Standard Monthly Charges
Additional Facilities Monthly Charges (See Attached Page)
Prices and terms per North Carolina Area Lighting Rate Schedule ALS-66 effective 6-1-2021
The term of the contract shall be ___ years from date of installation. ***
Total Proposed Monthly Charges
One Time Underground Service Charge
Per Pole NC
Other One Time Charges From Attached Page
Total One Time Charges Before Taxes
The term of the contract shall be ___ years from date of installation. ***
Total Proposed One-Time Charges
Comments:
I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as
outlined in the Company's rate schedule.
Print Name/Title:
Signature:
* The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be
adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs.
** Limited Design Availability
*** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area
Lighting Service Schedule.
Rates - North Carolina - ALS
5800 S/V
9500 S/V
16000 S/V
28500 S/V
50000 S/V
50000 S/V Flood
9000 M/H
20000 M/H
33000 PS M/H
40000 M/H
110000 M/H
22000 S/V
7000 M/V
Duke Energy Progress Area Lighting NC-ALS-66 Contract
Pricing Changes Effective 6-1-2021
Prices and terms per North Carolina Area Lighting Rate Schedule ALS-66 effective 6-1-2021
LIGHTING
SOLUTIONS
Lumens
5800
9500
9500
9500
16000
16000
22000
22000
28500
28500
28500
50000
50000
9500
28500
50000
9000
9000
20000
20000
20000
33000
40000
110000
(MFC)
(MFC)
(MFC)
w/Monthly Receptacle Charge (MFC)
w/Up-Front Receptacle Charge (MFC)
Cost
6.33
10.06
11.75
14.23
19.71
22.13
11.94
17.16
22.22
23.21
43.53
12.49
8.87
Watts
70
100
100
100
150
150
200
200
250
250
250
400
400
100
250
400
100
100
250
250
250
350
400
1000
Proposal Date:
Prepared by:
Job Title:
Phone:
# Items
47
30
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
Date:
7/9/2021
BILL BRYAN
ENGINEERING TECHNOLOGIST III
919-239-0671
Corp. ID#:
Mail Code:
Construction Schedule Date:
WO#:
Monthly
Charge*
6.33
10.06
10.06
10.44
11.75
12.2
12.49
12.85
14.23
14.85
14.81
19.71
20.29
10.06
14.23
22.13
11.94
11.94
17.16
17.58
46.54
18.08
23.21
43.53
2.09
4.97
4.97
17.46
18.86
10.66
17.09
20.17
17.09
17.45
27.72
3.24
Subtotal
7% Tax
Total
580
Subtotal
7% Tax
Total
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Monthly
Cost
0
0
0
0
0
0
587.03
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
319.8
0
0
0
0
0
0
906.83
0
906.83
63.4781
970.3081
0
0
0
0
0
4/5/2018
0.38
0.45
0.62
0.42
0.29
0.38
17.46
18.86
17.09
20.17
17.09
Duke Energy Progress Other Lighting Item Prices NC-ALS-66 Contract
Customer Name
Street Address
City, State, Zip
Customer Phone:
CIM Account Number
Drawing # / Design Description
Service Location of Light(s)
Pricing Changes Effective 6-1-2021
Black Fiberglass Poles (Monthly Facility Charge)
NOTE: 10 Year Contract Period
Tenon Adapter for Shoebox Fixtures (Special Order)
Style "A" Alum Direct Embed Poles (Facility Charge)
Style "A" Alum Anchor Base Poles (Facility Charge)
Black Decorative Round 35' Steel Pole
Standard Poles-Galvanized MFC+
+ Fiberglass poles should have been installed
but were not due to customer preference.
Early On Photo Control (Car Lots, etc.)
Non Std Wood Pole Bracket
10' Mast Arm
16' Mast Arm
Transformers for "Lighting Only" (MFC)
Overhead Service - (OH 13.2 kv) 3 KVA Pole Mount………………………..
Overhead Service - (OH 7.2 kv) 3 KVA Pole Mount………………………..
Overhead Service - (OH 13.2 kv) 10 KVA Pole Mount………………………..
Overhead Service - (OH 7.2) 10 KVA Pole Mount…………………………….
Underground Service - (UG 13.2 kv) 25 KVA Pad Mount…………………..
Underground Service - (UG 7.2 kv) 25 KVA Pad Mount…………………….
Miscellaneous Additional Facilities/Monthly Facilities Charges
Details :
Total Proposed Monthly Charges Before Taxes
One Time Pole Hand-Dig / Hand-Set Surcharge (CIAC) - Per Pole
One Time Hand Dig Pole Hole ONLY (CIAC) - Per Pole
Underground Boring Service Charge
Total Proposed One Time Charges Before Taxes
The term of the contract shall be ____ years from date of installation. **
Comments:
I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as
outlined in the Company's rate schedule.
Print Name/Title:
Signature:
* The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be
adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs.
** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area
Lighting Service Schedule.
Duke Energy Progress Other Lighting Item Prices NC-ALS-66 Contract
LIGHTING
SOLUTIONS
0
0
0
0
0
0
0
Mounting Height
25'
30'
12'
17'
12' and 17'
35'
Mounting Height
30'
35'
Proposal Date:
Prepared by:
Job Title:
Phone:
# of Items
# of Items
# of Items
# of Items
# of Items
# of Items
Date:
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
7/9/2021
BILL BRYAN
ENGINEERING TECHNOLOGIST III
919-239-0671
Corp. ID#:
Mail Code:
Construction Schedule Date:
0
WO#:
Monthly*
6.55
7.37
1.82
10.52
11.89
18.03
27.14
Monthly*
11.85
11.44
Monthly*
0.21
Monthly *
0.63
1.55
Monthly
7.78
9.68
11.3
10.18
19.82
22.16
Monthly*
Total
300
140
Total
0
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Total Cost
0
0
0
0
0
0
0
Total Cost
0
0
Total Cost
0
Total Cost
0
0
Total Cost
0
0
0
0
0
0
Total Cost
0
0
0
0
0
0
6.55
7.37
1.82
10.52
11.89
18.03
27.14
11.85
11.44
0.21
0.63
1.55
7.78
9.68
11.3
10.18
19.82
22.16
4/5/2018
Add these to the LED page also
Add these to the LED page also
Add these to the LED page also
May need to move to Std page
1/1/2020
1/2/2020
1/3/2020
Duke Energy Progress Sanibel, Teardrop & Mongoose NC-ALS-66 Contract
Customer Name
Street Address
City, State, Zip
Customer Phone:
CIM Account Number
Drawing # / Design Description
Service Location of Light(s)
Pricing Changes Effective 6-1-2021
Teardrop - Nonstandard
Sodium Vapor (Black)
Metal Halide (Black) (Not for New Installs Effective 5/17)
Sodium Vapor (Jade Green)
LED 50
LED 150
Black Concrete Pole(s) (MFC)
Existing Galvanized Metal (painted black)*
Existing Metal Distribution (painted black)*
6' Black Single Bracket
6' Black Twin Bracket
Sanibel (MFC)
Sodium Vapor
Metal Halide (Not for New Installs Effective 5/17)
LED 50
LED 150
Sanibel Shepherd's Crook Arm (MFC)
Single Arm
Twin Arm
Sanibel Posts with 6" Tenon
12' Smooth Black Concrete Post (MFC)
16' Smooth Black Concrete Post (MFC)
Mongoose
Sodium Vapor Hi-Tilt
Sodium Vapor Lo-Tilt
Sodium Vapor Lo-Tilt
Monthly Underground Service Charge
Per Pole NC
Total Proposed Monthly Charges Before Taxes
One-Time Underground Service Charge
Per Pole NC
One-Time LED Conversion Charges (Lights Less than 20 years old)
Fixtures
Poles
The term of the contract shall be ____ years from date of installation. **
NOTE: Additional upfront cost are applicable for existing poles that are painted black. Also, these poles will be billed monthly at
the special metal pole rate. Lead-based paint on existing metal distribution poles must be stripped per Duke Energy Progress guidelines
and poles repainted black.
Comments:
I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as
outlined in the Company's rate schedule.
Print Name/Title:
Signature:
* The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be
adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs.
** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area
Lighting Service Schedule.
Rates - North Carolina - ALS
28,500 HPS
20,000 M/H
50,000 S/V (Not the Flood Price)
9,500 S/V
9,000 M/H
LED TEARDROP (LED Basic 150 RATE)
LED TEARDROP/Sanibel (LED Basic 50 RATE)
Sanibel LED 75 (Standard Rate)
Sanibel LED 150 (Basic Rate)
MFC
Sanibel LED 150 - MFC Charge
Sanibel LED 50
Teardrop LED 50
Duke Energy Progress Sanibel, Teardrop & Mongoose NC-ALS-66 Contract
LIGHTING
SOLUTIONS
0
0
0
0
0
0
0
Lumens
28500
20000
28500
Mounting Height
27'
Various
Various
Lumens
9500
9000
Mounting Height
12'
16'
Lumens
28500
28500
50000
Cost
14.23
17.16
19.71
10.06
11.94
11.59
7.25
5.62
11.59
7.45
6.71
9.04
Watts
250
250
250
50
150
Watts
100
100
50
150
Watts
250
250
400
Proposal Date:
Prepared by:
Job Title:
Phone:
# of Items
# of Items
# of Items
# of Items
# of Items
# of Items
# of Items
# of Items
# of Items
Date:
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
7/9/2021
BILL BRYAN
ENGINEERING TECHNOLOGIST III
919-239-0671
Corp. ID#:
Mail Code:
Construction Schedule Date:
0
WO#:
Monthly*
22.4
25.1
24.26
16.29
21.67
Monthly*
22.17
0.34
0.35
Monthly*
12.74
16.11
14.13
19.04
Monthly*
5.01
6.96
Monthly*
17.46
18.86
Monthly*
16.44
15.88
21.62
Monthly*
3.24
Total
One-time Charge
580
One-time Charge
50
500
0
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Total Cost
0
0
0
0
0
Total Cost
0
0
0
0
0
Total Cost
0
0
0
0
Total Cost
0
0
Total Cost
0
0
Total Cost
0
0
0
Total Cost
0
0
Total Cost
0
Total Cost
0
0
8.17
7.94
10.03
9.04
10.08
22.17
0.34
0.35
2.68
4.17
6.88
7.45
5.01
6.96
17.46
18.86
2.21
1.65
1.91
8/29/2019
7/3/2020
7/3/2020
7/3/2020
Duke Energy Progress LED - Company Owned - NC-ALS-66 Contract
Customer Name
Street Address
City, State, Zip
Customer Phone:
CIM Account Number
Drawing # / Design Description
Service Location of Light(s)
Pricing Changes Effective 6-1-2021
LED Fixtures
LED 50 Roadway / NEIGHBORHOOD
LED 50 FLOODLIGHT
LED 70/75 Roadway
LED 105/110 Roadway
LED 130 FLOODLIGHT
LED 150 Roadway
LED 215/220 Roadway
LED 260 FLOODLIGHT
LED 280 Roadway
LED 150 Sitelighter (MFC) Not for New Installs
LED 150 Shoebox (MFC)
LED 205/220 Shoebox w/MFC - Not for New Installs
LED 220 Shoebox
LED 420 Shoebox
LED 530 Shoebox
LED Post Top Fixtures
Mini Bell (MFC)
Traditional /Traditional Open (MFC)
Pedestrian Shoebox "S" (MFC)
Acorn "A" (MFC)
Mitchell With Top Hat
Enterprise 50 (MFC)
Enterprise 150 (MFC)
Enterprise 220 (MFC)
Standard Pole(s)
Wood Pole
16' Black Fiberglass Pole
Gray Fiberglass Pole / Metal** Pole
Decorative Square Metal Pole
Non Standard Pole(s)
Black Fiberglass Poles (MFC)
Black Fiberglass Poles (MFC)
Black Fiberglass Poles (MFC)
Black Decorative Round 35' Steel Pole (MFC)
Style "A" Alum Direct Embed Poles (MFC)
Style "A" Alum Direct Embed Poles (MFC)
Style "A" Alum Anchor Base Poles (MFC)
Tenon Adapter (MFC)
(Use when Site Lighter(s) are mounted on Round Black Fiberglass and Round Black Tapered Steel Poles. One adapter is used for each pole.
Monthly Underground Service Charge
Per Pole NC
One-Time Underground Service Charge
Per Pole NC
One-Time LED Conversion Charges (Lights Less than 20 years old)
Fixtures
Poles
Total Proposed "Monthly" Charges Before Taxes
Total Proposed One-Time Charges
The term of the contract shall be __5__ years from date of installation. ***
Comments:
I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as
outlined in the Company's rate schedule.
Print Name/Title:
Signature:
* The Monthly Charge is based on the current Area or Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be
adjusted to reflect approved charges in subsequent Area and Street Lighting Tariffs.
** Limited Design Availability
*** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Area
Lighting Service Schedule.
Rates - North Carolina - ALS
LED 50 (No MFC)
LED 50 FLOODLIGHT (No MFC)
LED 75 (No MFC)
LED 105 (No MFC)
LED 130 FLOODLIGHT (No MFC)
LED 150 (No MFC)
LED 215 (No MFC)
LED 260 FLOODLIGHT (No MFC)
LED 280 (No MFC)
LED 205 Site Lighter/Shoebox (ADD MFC)
LED 220 SHOEBOX
LED 420 (No MFC)
LED 530 (No MFC)
Additional Facilities Charges - MFC
LED 205 Site Lighter (MFC)
Minibell (MFC)
LED Traditional /Traditional Open (MFC)
Pedestrian Shoebox "S" (MFC)
Enterprise 50 (MFC)
Enterprise 150 (MFC)
Enterprise 220 (MFC)
Acorn (MFC)
Duke Energy Progress LED - Company Owned - NC-ALS-66 Contract
Pricing Changes Effective 6-1-2021
LIGHTING
SOLUTIONS
REECE CONSTRUCTION
25 DEER TAIL LN
FUQUAY VARINA
NOT OFFICIAL CONTRACT
0
Watts
50
50
75
105
130
150
215
260
280
150
150
205
220
420
530
50
50
50
50
50
50
150
220
Mounting Height
25', 30', 35'
16'
25', 30', 35'
30'
Mounting Height
25'
30'
35'
35'
12'
17'
12' and 17'
Cost
7.25
10.61
7.41
9.05
21.3
11.59
14.15
38.75
15.93
11.66
18.08
38.3
46.54
Cost
6.45
4.94
2.51
4.24
4.61
3.76
2.69
0.77
Proposal Date:
Prepared by:
Job Title:
Phone:
# of Items
18
# of Items
18
# of Items
# of Items
18
# of Items
# of Items
Date:
new
new
new
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
4/19/2023
TOHSIYA TSUJIMURA
ENGNIEERING TECHOLOGIST III
919-548-7096
Corp. ID#:
Mail Code:
Construction Schedule Date:
0
WO#:
Monthly*
7.25
10.61
7.41
9.05
21.3
11.59
14.15
38.75
15.93
15.69
14.8
18.11
18.08
38.3
46.54
12.19
9.76
11.49
8.02
13.34
11.86
15.35
16.84
Monthly*
2.09
4.97
4.97
10.66
Monthly*
6.55
7.37
7.97
27.14
10.52
11.89
18.03
1.82
Monthly*
3.24
One-time Charge
580
One-time Charge
50
500
Subtotal
7% Tax
Total
Subtotal
7% Tax
Total
0
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Total Cost
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
175.68
0
0
0
0
0
Total Cost
0
89.46
0
0
Total Cost
0
0
0
0
0
0
0
0
Total Cost
58.32
Total Cost
0
Total Cost
0
0
323.46
22.6422
346.1022
0
0
0
4/5/2018
4.1
3.21
6.45
4.94
2.51
4.24
6.55
7.37
7.97
27.14
10.52
11.89
18.03
1.82
Fix at bottom
Fix at bottom
1/1/2020
1/1/2020
1/1/2020
Duke Energy Progress LED - Amber Turtle Fixtures - NC-ALS-66 Contract
Customer Name
Street Address
City, State, Zip
Customer Phone:
CIM Account Number
Drawing # / Design Description
Service Location of Light(s)
Pricing Changes Effective 6-1-2021
LED Amber Turtle Fixtures
LED 70/75 Roadway
LED 105/110 Roadway
Standard Pole(s)
Wood Pole
Gray Fiberglass Pole / Metal** Pole
Monthly Underground Service Charge
Per Pole NC
One-Time Underground Service Charge
Per Pole NC
Total Proposed "Monthly" Charges Before Taxes
Total Proposed One-Time Charges
The term of the contract shall be 10 years from date of installation. ***
Comments:
I certify that I am legally authorized to sign this document and request Duke Energy Progress to install lights as outlined herein. I agree to the monthly rate and contract term as
outlined in the Company's rate schedule.
Print Name/Title:
Signature:
* The Monthly Charge is based on the current Street Lighting Tariff in effect at the time of signing of this contract. Future cost will be
adjusted to reflect approved charges in subsequent Street Lighting Tariffs.
** Limited Design Availability
*** Termination of the lighting prior to the term of the contract will result in contract termination charges pursuant to the Company's applicable Street
Lighting Service Regulations.
Rates - North Carolina - ALS
LED 75 (No MFC)
LED 105 (No MFC)
MFC
LED 70 (MFC)
LED 110 (MFC)
Duke Energy Progress LED - Amber Turtle Fixtures - NC-ALS-66 Contract
LIGHTING
SOLUTIONS
0
0
0
0
0
0
0
Watts
75
105
Mounting Height
25', 30', 35'
25', 30', 35'
Cost
7.41
9.05
Cost
3.33
4.28
Proposal Date:
Prepared by:
Job Title:
Phone:
# of Items
# of Items
# of Items
# of Items
Date:
@
@
@
@
@
@
12:00:00 AM
0
0
0
Corp. ID#:
Mail Code:
Construction Schedule Date:
0
WO#:
Monthly *
10.74
13.33
Monthly *
2.09
4.97
Monthly *
3.24
One-time Charge
580
Subtotal
7% Tax
Total
Subtotal
7% Tax
Total
0
0
0
=
=
=
=
=
=
Total Cost
0
0
Total Cost
0
0
Total Cost
0
Total Cost
0
0
0
0
0
0
0
4/5/2018
MFC
7.97
27.14
1.82
North Carolina
Updated 5/17/2020
Maximo CU
LSH-GLARE-RW-LED-50-PUB-P
LSH-GLARE-RW-LED-50-PVT-P
LSH-GLARE-RW-LED-105-PUB-P
LSH-GLARE-RW-LED-105-PVT-P
LSH-GLARE-RW-LED-150-PUB-P
LSH-GLARE-RW-LED-150-PVT-P
LSH-GLARE-RW-LED-215-PUB-P
LSH-GLARE-RW-LED-215-PVT-P
LSH-GLARE-RW-LED-280-PUB-P
LSH-GLARE-RW-LED-280-PVT-P
LSH-GLARE-AREA-LED-50-PUB-P
LSH-GLARE-AREA-LED-50-PVT-P
LSH-GLARE-TRAD-LED-50-PUB-P
LSH-GLARE-TRAD-LED-50-PVT-P
LSH-GLARE-SBX-LED-205-PUB-P
LSH-GLARE-SBX-LED-205-PVT-P
LSH-GLARE-SBX-LED-420-PUB-P
LSH-GLARE-SBX-LED-420-PVT-P
LSH-GLARE-SBX-LED-530-PUB-P
LSH-GLARE-SBX-LED-530-PVT-P
NOTE: Does not include grossed up amount nor tax
WMIS CU's
LLRDWYLED05GSC
LLRDWYLED05GSC
LLRDWYLED10GSC
LLRDWYLED10GSC
LLRDWYLED15GSC
LLRDWYLED15GSC
LLRDWYLED22GSC
LLRDWYLED22GSC
LLRDWYLED28GSC
LLRDWYLED28GSC
LLAREALED05GSC
LLAREALED05GSC
LLMCLSGLAREC
LLMCLSGLAREC
LLSBLED205GSC
LLSBLED205GSC
LLSBLED420GSC
LLSBLED420GSC
LLSBLED530GSC
LLSBLED530GSC
Catalog #
4202956
4202956
4203093
4203093
1524257
1524257
4203092
4203092
1524258
1524258
1534848
1534848
4167888
4167888
1525356
1525356
1525356
1525356
1525356
1525356
Description
Shield, AEL ATB0 20LED 50W, 75W
Light Shield glare Roadway LED 50W PRIVATE
Light Shield glare Roadway LED 105W public
Light Shield glare Roadway LED 105W PRIVATE
Light Shield glare Roadway LED 150W public
Light Shield glare Roadway LED 150W PRIVATE
Light Shield glare Roadway LED 215W public
Light Shield glare Roadway LED 215W PRIVATE
Light Shield glare Roadway LED 280W public
Light Shield glare Roadway LED 280W PRIVATE
Light Shield glare Area/Neighborhood LED 50W public
Light Shield glare Area/Neighborhood LED 50W PRIVATE
Light Shield glare Traditional LED 50W public
Light Shield glare Traditional LED 50W PRIVATE
Light Shield glare Shoebox LED 205W (4 panel) public
Light Shield glare Shoebox LED 205W (4 panel) PRIVATE
Light Shield glare Shoebox LED 420W (8 panel) public
Light Shield glare Shoebox LED 420W (8 panel) PRIVATE
Light Shield glare Shoebox LED 530W (10 panel) public
Light Shield glare Shoebox LED 530W (10 panel) PRIVATE
Installed Cost (MFC) (Engineering Estimate--Not to be quoted to the Customer)
161.74
161.74
164.6
166.42
210.44
251.07
135.07
135.07
189.84
268.03
307.13
1% ~ NC Additional Facility Charge - NORTH CAROLINA
1.61
1.61
1.65
1.65
1.66
1.66
2.11
2.11
2.51
2.51
1.35
1.35
0.94
0.94
1.9
1.9
2.68
2.68
3.07
3.07
NC Up Front Contribution Cost (CIAC) DOES NOT include grossed up amount nor tax
161.74
161.74
164.6
164.6
166.42
166.42
210.44
210.44
251.07
251.07
135.07
135.07
94
94
189.84
189.84
268.03
268.03
307.13
307.13
NEW
NEW
NEW
North Carolina
Updated 3/8/2021
Maximo CU
LSH-GLARE-RW-LED-MICRO-2X1-HOUSE-___-P
LSH-GLARE-RW-LED-MICRO-2X1-STREET-___-P
LSH-GLARE-AREA-NEIGH-LED-___-P
LSH-GLARE-RW-LED-4X1-___-P
LSH-GLARE-RW-LED-6X1-___-P
LSH-GLARE-RW-LED-4X2-HOUSE-___-P
LSH-GLARE-RW-LED-4X2-STREET-___-P
LSH-GLARE-RW-LED-6X2-HOUSE-___-P
LSH-GLARE-RW-LED-6X2-STREET-___-P
LSH-GLARE-RW-LED-8X2-HOUSE-___-P
LSH-GLARE-RW-LED-8X2-STREET-___-P
LSH-GLARE-OTRAD-LED-HOUSE-___-P
LSH-GLARE-OCA-LED-180-___-P
LSH-GLARE-TRAD-LED-WHITE-HOUSE-___-P
LSH-GLARE-MTCH-LED-180-___-P
LSH-GLARE-TD-CLER-LED-___-P
LSH-GLARE-MONT-LED-180-___-P
LSH-GLARE-MTCHO-LED-HOUSE-___-P
LSH-GLARE-SBX-LED-205-___-P
LSH-GLARE-SBX-LED-420-___-P
LSH-GLARE-SBX-LED-530-___-P
NOTE: Does not include grossed up amount nor tax
Item #
1602110
1602111
1525131
1535522
1535526
1524257
1602281
1535528
1602282
1535529
1602295
1602296
1602298
1602300
1524189
1602303
1602304
1602305
1525356
1525356
1525356
Description
House Side Shield for Auto Micro
Street Side Shield for Auto Micro
Light Trespass Shield, Neighborhood (40w, 50w and 70w)
Light Trespass Shield, ATB0 50w and 70w
Light Trespass Shield, 110w and 150w
House Side Shield Light Shield, Larger 150w
Street Side Light Shield, Larger 150w
House Side Light Shield, 220w and 280w
Street Side Light Shield, 220w and 280w
House Side Light Shield, Turtle Light
Street Side Light Shield, Turtle Light
Open Traditional
House Side Shield, Ocala Acorn 180 degree
White House Side Shield, Traditional
180 degree House Side Shield, Mitchell
House Side Shield, Large Teardrop
House Side Shield, Monticello
Louvered House Side Shield, Open Mitchell and Open Monticello
Light Shield glare Shoebox LED 205W (4 panel)
Light Shield glare Shoebox LED 420W (8 panel)
Light Shield glare Shoebox LED 530W (10 panel)
1% Monthly Additional Facility Charge
1.32
1.32
1.09
1.32
1.32
1.38
1.61
1.67
1.61
1.96
1.79
1.11
1.07
1.05
1.37
1.51
1.27
1.14
1.9
2.68
3.07
Up Front Contribution Cost (CIAC) DOES NOT include grossed up amount nor tax
132.04
132.04
108.64
132.04
132.04
138.48
161.29
167.14
161.29
196.39
178.84
110.98
107.47
105.13
136.72
150.76
127.36
114.49
189.84
268.03
307.13
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW