Loading...
HomeMy WebLinkAbout2023.07.12 Birchwood Phase 3 As-BuiltsBIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS UNDERFOOT PROJECT # C20035.00 SHEET INDEX 1.THESE AS-BUILT PLANS SHOW ORIGINALLY APPROVED DESIGN BY HUGH J. GILLEECE AND ASSOCIATES EXCEPT WHERE NOTED IN RED. THIS AS-BUILT IS FOR WATER AND STORM ONLY. 2.WATERLINES SHOWN IN THE PROFILES IN THIS PLAN SET ARE SHOWN PER THE ORIGINALLY APPROVED DESIGN, SINCE NO VERTICAL AS-BUILT SURVEY WAS PROVIDED. PER THE CONTRACTOR, THE WATERLINE HAS BEEN INSTALLED AT THE DEPTH PER PLAN. 3.PERIODIC SITE VISITS WERE PERFORMED BY UNDERFOOT ENGINEERING TO OBSERVE THIS PROJECT DURING CONSTRUCTION AND IT WAS DETERMINED THAT THE UTILITIES WERE BUILT IN GENERAL CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. AS CONFIRMED BY THE CONTRACTOR, IT IS ALSO NOTED THAT THE ENGINEERING/UTILITY INSPECTOR FOR HARNETT REGIONAL WATER WAS ON-SITE DURING CONSTRUCTION, AS REQUIRED. 4.AS-BUILT UTILITIES ARE SHOWN GRAPHICALLY FOR REFERENCE. ACTUAL LOCATIONS ARE LISTED IN STATE PLANE COORDINATES (NORTHING, EASTING, ELEVATION) ON SHEETS C-6. 5.AS-BUILT SURVEY INFORMATION WAS PROVIDED BY MAERSTAN SURVEYING IN APRIL 2023. ALL ELEVATIONS RE IN REFERENCE TO THE BENCHMARK SET ON-SITE WITH THE FOLLOWING COORDINATES 623997.361, 2050627.206, 283.47. DATUM ARE NAVD 88 AND NAD 83. 6.SHOP DRAWING AND MATERIAL SUBMITTALS WERE PROVIDED BY THE CONTRACTOR PRIOR TO INSTALLATION AND WERE REVIEWED/APPROVED BY UNDERFOOT ENGINEERING AND SUBSEQUENTLY BY HRW. DUE TO NATIONWIDE MATERIAL SHORTAGES, C-900 WATERLINE (INSTEAD OF SDR-21) WAS PROPOSED AND ACCEPTED BY HRW FOR INSTALLATION. THE C-900 INSTALLED DOES MEET NSF-PW STANDARDS. COVER SHEET - AS-BUILT CVR #SHEET NAME CVR COVER SHEET - AS-BUILT C6 PHASE 3 UTILITY SHEET - AS BUILT C8 GRADING AND DRAINAGE SHEET B - AS-BUILT C12 PHASE 3 P&P SAINT CLAIR DRIVE (A) - AS-BUILT C13 PHASE 3 P&P ROBERT HOWE (A) - AS-BUILT C14 PHASE 3 P&P PUTNAM COURT - AS-BUILT C15 PHASE 3 P&P TARLETON DRIVE - AS-BUILT C16 PHASE 3 P&P JOHN STARK DRIVE (A) - AS-BUILT C17 PHASE 3 P&P THOMAS GAGE DR (B) - AS-BUILT UTILTY AS-BUILT NOTES PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 7.12.23 @ 10:35 AM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING AS-BUILT WATERLINE PIPE SIZE PIPE MATERIAL PIPE LENGTH 8"C900 4247.44' EIS EIP EIP EIP EXIST. AXLE OS1823,524 SF 18.91 AC OS3 98,102 SF 2.25 AC. PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATEDRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT 10 x 70(TYP) 10 x 70 (TYP)S10° 01' 04.23"W1940.43PROPOSED 20' PRIVATE DRAINAGE EASEMENT 10 x 70 (TYP) SUITABLE SOILS S82° 26' 49.18"E 298.99 L=670.12, R = 5 0 0 L =238.62,R=310N27° 58' 31.70"E844.62L=134.40,R=400N08° 43' 29.22"E267.03N08° 43' 29.22"E271.18L = 74 3.3 0, R = 4 5 0 N85° 54' 55.52"W 1059.50 S86° 13' 31.66"W160.97L=70.27,R=400 N83° 42' 34.97"W 525.95 S86° 03' 25.98"E 136.80 L =9 4 5 .1 5 ,R =9 0 0 N33° 46' 22.27"E152.98S14° 38' 07.63"E 75.20 L=113.68, R=402 SUITABLE SOILS 108.54'106.45'105.20'64.74' 88.18' 129.48' 10 x 70 (TYP) S53° 16' 50.55"W 131.06 S67° 53' 1 4. 2 6 " W 145.82 =230OS2 43,401 SF 1.00 AC PC11+15.0812 +0 0 13 + 0 0 PT1 3 + 5 3 . 7 0 14+ 0 0 15+ 0 0 16+ 0 0 17+ 0 0 18+ 0 0 19+ 0 0 20+ 0 0 21+ 0 0 PC 2 1 + 9 8 . 3 2 22+ 0 0 23+00 PT23+32.72 24+00 25+00 26+00 27+00 28+00 PC28+70.93 29+00 30+00 31+00 32+0033+0034+0035+0036+00PT36+14.2337+0038+0039+0040+0041+0042+0043+0044+0045+0046+0046+73.7310+0011+0012+0013+00PC13+98.0314+0015+0016+0017+0018+0019+00PT19+13.3320+0021+0022+00PC22+89.4923+0024+0025+00PT27+80.17 30+0031+00PC31+20.39 32+00PT3 2 + 1 1 . 7 7 33+00PC33+41.7434+0035+0036+0037+0019+00PT19+03.8820+0020+49. 7 011+0012+00PC12+98.9913+0014+0015+0016+0017+0018+0019+0010+0011+0012+0013+0014+0015+0016+0017+ 0 0 1 8 + 0 0 19 + 0 0 20 + 0 0 21 + 0 0 22 + 0 0 22+34.937+79.12 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+0027+19.55FHFH8" WL1-8"X8"CROSS4-8" GV1-8"X8" TEE3-8" GVDI-215DI-216DI-217DI-113Ø ØØØØØ1-8"x8" TEE3-8" GVFHFES 305DI 305AFES 3048" WLJOHN STARK DRIVE50' PUBLIC R/W & UTILITYMCIN T O S H C O U R T JOHN STARK DRIVE50' PUBLIC R/W & UTILITY1-8"X4" TE E 2-8" GV 1-4" GV FH 8" WLDI 554 DDI 555 JOHN STARK DRIVE 50'PUBLIC R/W & UTILITYTARLETON DRIVE 50'PUBLIC R/W & UTILITYPROPOSED 20'PRIVATEDRAINAGEEASEMENTPROP O S E D 20' DS 1 DS 2 DS 3A DS 3B DS 3C DS 4B DS 4C DS 5 DS 6B DS 6A DS 7A 8+11.12 10+0 0. 0 0 10+00.00 17+57.19 11+00 12+00 13+00 14+00 15+00 22+ 2 6 . 4 69+0010+00 11 + 0 0 12+ 0 0 13+0 0 14+0 0 15+0 0 16+0 0 17+ 0 0 18+ 0 0 19 + 0 0 20 + 0 0 21 + 0 0 22 + 0 0 16+00 17+00 DS 4A 10 x 70 (TYP) PROPOSED 20' PRIVATE DRAINAGE EASEMENT S04° 46' 21.51"W398.03L = 5 1 5.3 0, R =340 S82° 03' 48.80"E 376.16 L= 4 9 0.6 7,R= 3 1 0 L=91.38, R=310 S25° 30' 48.83"W129.98L=503.51,R= 3 10N60° 0 7 ' 4 1 . 0 0 " W 100. 5 7 L=38.64,R=310 N5 2 ° 5 9 ' 1 0 . 3 1 " W 22 6 . 6 4 L=74.17,R=310 N66° 4 1 ' 4 2 . 9 3 " W 517.3 9 L =249.77, R=400 OS2 43,401 SF 1.00 AC BARN BARN WELLHOUSE BARN WELL HOME RUINS BARN BARN *TBR *TBR *TBR *TBR *TBR *TBR *TBR *TBR EOPEOPEOPEOPEOPEOPEOPEOPEOP PROP O SE D 34"WATE R S E R VI C E (TYP)PROPOSED 34"WATER SERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)8" SDR-21 PVC WL-5' OFF EOP8" SDR-21 PVC WL-5' OFF EOP8" SDR-21 PVC WL-5' OFF EOP50' 20' 50'20' 50' 20' 50' 20' 50' 20' 50' 20' 50'20' 50' 20' 50'20' 50'20' 50' 20' R50 R35 PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT 238.04'N 09°55'04"E848.37'N 10°04'32"E810.38'N 88°31'54"W 527.71'N 10°05'25"E527.47'10+00.00 10+00.00 ØØEXISTING POND EXISTING WETLAND JB 109DI 109ADI 110DI 512BDI 512ADI 51245'45'45'30'210'30'160'199'30'29'45'30'30'148'45'30'30'45'47'30'30'30'45'PROPOSED 20' PRIVATE DRAINAGE EASEMENT DI 306DI 307DI 307ADS 3D 105.71'103.35'BOA FH 10x70(TYP) 10x70 (TYP) 10x70(TYP) FH 1-8"X8" TEE 3-8" GV 1-8"X8" TEE3-8" GV FH FH FH JOHN STARK D R I V E 50' PUBLIC R/ W & U T I L I T Y FH 1-8"X8" TEE 3-8" GV FH EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATERSERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) PROPOSED 34"WATER SERVICE(TYP) 1-8"X8" TEE 3-8" GV 8" SDR-21 PVC WL- 5' OFF EOP 8" SDR-21 PVC WL-5' OFF EOP 8" SDR-21 PVC WL-5' OFF EOP 8" SDR-21 PVC WL-5' OFF EOP 2" SDR-21 PVC WL- 5' OFF EOP 8" SDR-21 PVC WL-5' OFF EOP EOP FUTUREEOP EOP 8" SDR-21 PVC WL- 5' OFF EOP 8" SDR-21PVC WL-5' OFF EOP TH O M A S G A G E 50' P U B L I C R /W & U T I L I T Y 8" SDR-21PVC WATERLINE 2"BOA WITH 8" GVWILL BE REMOVEDAT THE TIME OFPHASE 4 WATER LINECONSTRUCTION ARESTRAINED JOINTWILL BE ADDED 168'FROM CAP PUTNAM S T R E E T 50' PUBLIC R / W & U T I L I T Y JOHN STARK DR IVE50' PUBL IC R /W & UT IL ITY PUTNA M ST R EET 50' PUBLIC R/ W & UTI LITY SAINT C L A I R D R I V E 50' PUBLI C R / W & U T I L I T YROBERT HOWE DRIVE50' PUBLIC R/W & UTILITYPROPOSED 34" WATER SERVICE (TYP) 8" WL 10x70(TYP) PROPOSED 34" WATER SERVICE (TYP) PROPOSED 34"WATER SERVICE(TYP) BOA 2" SDR-21 PVC WL-5' OFF EOP 2" WL 2-8"GV TEE1-8"X8" CROSS3-8" GV 1- 8" CAP 1-2" GV T A R L E T O N D R I V E 50 ' P U B L I C R /W & U T I L I T Y 1-8"X8" CROSS3-8" GV 8" SDR-21 PVC WL- 5' OFF EOP EOP 2"BOA WITH 8" GV WILLBE REMOVED AT THETIME OF PHASE 4 WATERLINE CONSTRUCTION ARESTRAINED JOINT WILLBE ADDED 168' FROM CAP THOMAS GAGE DRIVE50' PUBLIC R/W & UTILITY1617 24 25 26 27 18 29 30 31 32333435 3637383940414243 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 92 93 94 95 96 97 98 99 100 101 102 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141142143 144145 146 147 148 149 150151 152153154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 19 20 21 22 23 28 8" WL PHASE 3 PHASE 4 PHASE 3 PHASE 4 PHASE 3 PHASE 4 PHASE 2 PHASE 3PHASE 3PHASE 4PHASE 3PHASE 2PHASE 3PHASE 2PHASE 2PHASE 1PHASE 1PHASE 2PHASE 1PHASE 2PHAS E 3 PHAS E 2 PHASE 3 PHASE 4 BO WMWM WMWM WMWM WM WM WM WM WM WM WM WM WM WM WM WM WM BO WM WM WM WMWM WMWM WMWM WMWM WMWM BO WM WM WM WM WM WM WM WM WM WM BO WM BO WM WM WM WM WM WM WM BIRCHWOOD PHASE 3 WATERLINE AS-BUILT Point # 21114 21115 21116 21117 21119 21120 21121 21122 21123 21124 21125 21126 21127 21128 21129 21130 21131 21132 21133 21134 21135 21136 21137 21139 21140 21141 21142 21143 21144 21145 21146 21153 21154 21158 21159 Description WM 177 WM 176 WM 63 WM 175 WM 61 WM 60 WM 62 WV 4 FH 1 WM 58 WM 174 WM 56 WM 57 WM 55 WM 54 WM 53 WM 52 WV 10 TEMP BLOW OFF 1 WM 157 WM 158 WM 159 FH 2 WM 173 WM 172 WM 160 WM 161 WM 171 WM 170 WM 169 WM 168 WM 132 WM 133 WV 20 TEMP BLOW OFF 2 Elevation 296.842 296.942 294.635 299.229 300.240 300.087 300.208 299.491 300.860 304.290 306.082 307.760 307.249 311.749 312.379 320.323 321.122 322.939 323.110 324.584 315.177 314.954 308.485 307.002 306.951 306.446 306.263 304.867 304.758 304.537 304.707 303.221 302.839 303.638 303.189 Northing 625154.0070 625155.7950 625093.3470 625169.8200 625038.1900 625047.5050 625085.6920 625203.7940 625201.8510 625252.7390 625375.7560 625468.4460 625454.9860 625667.1360 625677.3000 625876.7890 625886.5870 625969.5900 625973.3120 625965.1490 625777.6260 625767.3400 625608.8190 625545.2110 625545.3530 625611.9460 625613.0350 625572.4560 625574.7890 625645.2380 625647.8830 625804.1710 625809.9220 626270.8080 626274.0920 Easting 2049232.3790 2049222.8050 2049241.6360 2049122.5850 2048939.5280 2048941.6230 2049007.4970 2049013.8920 2049023.6180 2048976.8600 2049060.0780 2049013.3740 2049010.7140 2049049.1520 2049050.4270 2049085.4440 2049087.2160 2049146.8620 2049147.7980 2049161.4770 2049128.4200 2049126.6050 2049123.5650 2049283.0720 2049291.6290 2049376.8550 2049386.7110 2049481.2080 2049490.0480 2049681.2620 2049688.3400 2049906.6520 2049913.1710 2049992.6110 2049991.7030 BIRCHWOOD PHASE 3 WATERLINE AS-BUILT Point # 21160 21161 21162 21163 21164 21165 21166 21167 21168 21169 21379 21380 21381 21382 21383 21384 21385 21386 21387 827 832 836 837 838 839 840 841 842 843 844 845 858 860 861 Description WM 137 WM 136 WV 19 FH 4 WM 22 WV 16 WV 17 WV 18 WM 135 WM 134 WM 29 WM 28 WM 27 WV 23 FH 5 WM 30 WM 31 WV 22 TEMP BLOW OFF 3 WM 59 WV 6 WV 15 BLOW OFF 2 WM 162 WM 163 WM 164 WM 165 WM 166 WM 167 WV 14 FH 3 WM 21 TEE 8 TEE 9 Elevation 301.810 301.475 301.100 298.929 299.487 300.310 300.394 300.230 300.441 300.381 290.613 293.489 293.819 293.150 292.375 295.189 295.915 299.538 299.011 307.288 306.482 305.753 307.039 307.321 308.863 308.723 306.992 307.143 303.516 298.094 Northing 626173.1110 626164.3570 626142.8687 626150.1810 626139.6760 626123.2480 626119.5340 626119.1540 625968.4290 625960.7300 626577.6950 626601.3230 626609.0830 626643.8040 626653.2660 626720.9330 626727.5680 626776.7040 626778.1300 625245.2394 625599.2680 625875.3170 625873.5060 625804.2910 625811.6390 625915.9730 625922.0100 625895.3920 625884.7090 625736.3560 625751.8060 626069.2330 626121.6253 626141.6687 Easting 2049992.5810 2049998.9980 2050074.4645 2050081.7440 2050094.3730 2050093.5450 2050097.5700 2050093.6390 2050042.9140 2050036.9620 2050499.3870 2050410.0090 2050403.9750 2050431.1170 2050441.2910 2050373.1280 2050365.9470 2050237.3970 2050233.0610 2048975.0318 2049084.7140 2049609.7570 2049609.4540 2049632.9980 2049630.0180 2049611.9060 2049622.6420 2049698.0900 2049702.2280 2049704.6180 2049755.4170 2050253.5650 2050095.3036 2050073.2857 BIRCHWOOD PHASE 3 WATERLINE AS-BUILT Point # 21183 21186 21187 21188 21190 21192 21193 21194 42923 11004 11065 11081 42886 42887 42892 42893 42894 42895 42896 49000 49001 49002 49004 49005 49014 49015 49016 49017 49018 21096 21097 21110 21111 21112 21113 Description WV 21 WT WL WT WL CL45BEND TOP 45 BEND WT-WL TOP 45 BEND WT WL CL45BEND WT WL WT WL WV PH2 WV PH2 WV PH2 TEE 7 WV 22 WV 11 WV 12 WV 13 TEE 5 TEE 6 WV 9 TEE 4 WV 7 WV 8 TEE 3 WV 1 WV 2 WV 3 TEE 1 TEE 2 BLOW OFF 1 WV 5 WM 65 WM 64 WM 179 WM 178 Elevation 293.038 286.888 286.902 288.485 288.529 288.431 286.847 286.617 287.172 296.470 302.523 299.771 301.284 302.378 303.022 303.103 302.729 301.470 301.571 306.778 305.623 307.346 307.288 305.942 298.866 298.833 300.920 297.599 298.334 296.584 297.288 297.365 297.721 297.951 297.879 Northing 626247.4270 626440.4450 626453.1930 626454.9730 626464.6770 626474.2860 626475.9480 626488.1540 626564.6340 625053.3790 625586.0850 626052.5260 625741.3970 625742.2590 625715.4880 625711.4320 625711.1700 625712.8520 625714.1470 625597.1980 625596.1760 625602.4950 625596.7760 625599.6920 625165.2980 625167.9750 625170.8090 625168.5800 625204.1380 624937.4400 624939.8380 625047.5010 625049.9340 625108.0430 625111.9100 Easting 2050534.5680 2050533.6480 2050531.0030 2050530.7020 2050528.2760 2050525.1440 2050524.6970 2050520.7300 2050485.3560 2049501.9110 2049827.6590 2050238.3570 2049762.6420 2049761.9840 2049722.1080 2049721.0970 2049715.0620 2049717.2660 2049720.0080 2049122.6820 2049122.6710 2049082.2460 2049081.4670 2049081.7000 2049006.2610 2049009.4110 2049007.1040 2049006.8920 2049013.1860 2048967.1770 2048967.2300 2049416.1010 2049406.1430 2049427.7840 2049418.8290 PHASE 3 UTILITY SHEET - AS BUILT C6 PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 5.31.23 @ 2:47 PM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING 40 80080 GRAPHIC SCALE 160 NORTH EIS EIP EIP EIP EXIST. AXLE OS1 823,524 SF 18.91 AC OS3 98,102 SF 2.25 AC. PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT S10° 01' 04.23"W1940.43PROPOSED 20' PRIVATE DRAINAGE EASEMENT SUITABLE SOILS S82° 26' 49.18"E 298.99 L=6 70.12, R = 5 0 0 L =238.62,R=310N27° 58' 31.70"E844.62L=134.40,R=400N08° 43' 29.22"E267.03N08° 43' 29.22"E271.18L = 7 43.3 0, R = 4 5 0 N85° 54' 55.52"W 1059.50 S86° 13' 31.66"W160.97L=70.27,R=400 N83° 42' 34.97"W 525.95 S86° 03' 25.98"E 136.80 L =9 4 5 .1 5 ,R =9 0 0 N33° 46' 22.27"E152.98S14° 38' 07.63"E 75.20 L=113.68, R=402 SUITABLE SOILS 108.54'106.45'105.20'64.74' 88.18' 129.48' S53° 16' 50.55"W 131.06 S67° 53' 1 4. 2 6 " W 145.82 =230OS2 43,401 SF 1.00 AC PC11+15.0812 +0 0 13 + 0 0 PT1 3 + 5 3 . 7 0 14+ 0 0 15+ 0 0 16+ 0 0 17+ 0 0 18+ 0 0 19+ 0 0 20+ 0 0 21+ 0 0 PC2 1 + 9 8 . 3 2 22+ 0 0 23+00 PT23+32.72 24+00 25+00 26+00 27+00 28+00 PC28+70.93 29+00 30+00 31+00 32+0033+0034+0035+0036+00PT36+14.2337+0038+0039+0040+0041+0042+0043+0044+0045+0046+0046+73.7310+0011+0012+0013+00PC13+98.0314+0015+0016+0017+0018+0019+00PT19+13.3320+0021+0022+00PC22+89.4923+0024+0025+00PT27+80.17 30+0031+00PC31+20.39 32+00PT3 2 + 1 1 . 7 7 33+00PC33+41.7434+0035+0036+0037+0019+00PT19+03.8820+0020+49. 7 011+0012+00PC12+98.9913+0014+0015+0016+0017+0018+0019+0010+0011+0012+0013+0014+0015+0016+0017+ 0 0 1 8 + 0 0 19 + 0 0 20 + 0 0 21 + 0 0 22 + 0 0 22+34.937+79.12 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+0027+19.55FHFH8" WL1-8"X8"CROSS4-8" GV1-8"X8" TEE3-8" GVDI-215DI-216DI-217DI-113Ø ØØØØØ1-8"x8" TEE3-8" GVFHFES 305DI 305AFES 3048" WLJOHN STARK DRIVE50' PUBLIC R/W & UTILITYMCIN T O S H C O U R T JOHN STARK DRIVE50' PUBLIC R/W & UTILITY1-8"X4" TE E 2-8" GV 1-4" GV FH 8" WLDI 554 DDI 555 JOHN STARK DRIVE 50'PUBLIC R/W & UTILITYTARLETON DRIVE 50'PUBLIC R/W & UTILITYPROPOSED 20'PRIVATEDRAINAGEEASEMENTPROP O S E D 20' DS 1 DS 2 DS 3A DS 3B DS 3C DS 4B DS 4C DS 5 DS 6B DS 6A DS 7A 8+11.12 10+0 0. 0 0 10+00.00 17+57.19 11+00 12+00 13+00 14+00 15+00 22+ 2 6 . 4 69+0010+0 0 11 + 0 0 12+ 0 0 13+ 0 0 14+0 0 15+ 0 0 16+0 0 17+0 0 18+ 0 0 19 + 0 0 20 + 0 0 21 + 0 0 22+ 0 0 16+00 17+00 DS 4A PROPOSED 20' PRIVATE DRAINAGE EASEMENT S04° 46' 21.51"W398.03L = 5 1 5.3 0, R =340 S82° 03' 48.80"E 376.16 L = 4 90.6 7, R = 3 1 0 L=91.38, R=310 S25° 30' 48.83"W129.98L=503.51,R= 3 10N60 ° 0 7 ' 4 1 . 0 0 " W 100. 5 7 L=38.64,R=310 N5 2 ° 5 9 ' 1 0 . 3 1 " W 22 6 . 6 4 L=74.17,R=310 N66° 4 1 ' 4 2 . 9 3 " W 517.3 9 L =249.77, R=400 OS2 43,401 SF 1.00 AC BARN BARN WELLHOUSE BARN WELL HOME RUINS BARN BARN *TBR *TBR *TBR *TBR *TBR *TBR *TBR *TBR EOPEOPEOPEOPEOPEOPEOPEOP PROP O SE D 34"WATE R S E R VI C E (TYP)PROPOSED 34"WATER SERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)8" SDR-21 PVC WL-5' OFF EOP8" SDR-21 PVC WL-5' OFF EOP8" SDR-21 PVC WL-5' OFF EOP50' 20' 50'20' 50' 20' 50' 20' 50' 20' 50' 20' 50'20' 50' 20' 50'20' 50'20' 50' 20' R50 R35 PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGEEASEMENT 238.04'N 09°55'04"E848.37'N 10°04'32"E810.38'N 88°31'54"W 527.71'N 10°05'25"E527.47'10+00.00 10+00.00 ØØEXISTING POND EXISTING WETLAND JB 109DI 109ADI 110DI 512BDI 512ADI 51245'45'45'30'210'30'160'199'30'29'45'30'30'148'45'30'30'45'47'30'30'30'45'PROPOSED 20' PRIVATE DRAINAGE EASEMENT DI 306DI 307DI 307ADS 3D 105.71'103.35'10x70(TYP) 10x70 (TYP) 10x70(TYP) DI-106 DI-105A DI-508 DI-507 DI-508A DI-508B DI-519 HW 502 AND 501 JOHN STARK D R I V E 50' PUBLIC R/ W & U T I L I T Y DI 111-A JB 111 DI 107-A DI 108 FES 107 DI- 503A DI- 511 DI-520 PROPOSED 20'PRIVATE DRAINAGEEASEMENT PROPOSED 20'DRAINAGEEASEMENT PROPOSED 20'PRIVATEDRAINAGEEASEMENT PROPOSED 20'PRIVATEDRAINAGEEASEMENT PROPOSED 20'PRIVATEDRAINAGEEASEMENT EW 501 EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EW 502 DS 3C DS 3B DS 3A PROPOSED 20' PRIVATE DRAINAGE EASEMENT EOP FUTUREEOP EOP DI-512 DI-511A DI 112 DS 3D TH O M A S G A G E 50' P U B L I C R / W & U T I L I T Y PROPOSED 20' DRAINAGE EASEMENT PUTNAM S T R E E T 50' PUBLIC R / W & U T I L I T Y JOHN STARK DR IVE50' PUBL IC R /W & UT IL ITY PUTNA M ST R EET 50' PUBLIC R/ W & UTI LITY SAINT C L A I R D R I V E 50' PUBLI C R / W & U T I L I T YROBERT HOWE DRIVE50' PUBLIC R/W & UTILITYDI-112A 10x70(TYP) DS-10 PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' DRAINAGE EASEMENT T A R L E T O N D R I V E 50 ' P U B L I C R /W & U T I L I T Y EOP THOMAS GAGE DRIVE50' PUBLIC R/W & UTILITY1617 24 25 26 27 18 29 30 31 32333435 3637383940414243 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 92 93 94 95 96 97 98 99 100 101 102 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141142143 144145 146 147 148 149 150151 152153154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 19 2021 22 23 28 PHASE 3 PHASE 4 PHASE 3 PHASE 4 PHASE 3 PHASE 4 PHASE 2 PHASE 3PHASE 3PHASE 4PHASE 3PHASE 2PHASE 3PHASE 2PHASE 2PHASE 1PHASE 1PHASE 2PHASE 1PHASE 2PHAS E 3 PHAS E 2 PHASE 3 PHASE 4 GRADING AND DRAINAGE SHEET B - AS-BUILT C8 40 80080 GRAPHIC SCALE 160 NORTH PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 5.31.23 @ 2:47 PM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING EIP OS3 98,102 SF 2.25 AC. 10 x 70 (TYP) S82° 26' 49.18"E298.99 L=670.12, R =500106.45'105.20'64.74' 88.18'129.48'11+0012+00PC12+98.9913+0014+0015+0016+0017+009+00 10+00 11+00 12+00 ØØØDS 6B DS 6A PROPOSED 34"WATER SERVICEN 10°05'25"E527.47'10+00.00 EXISTING POND EXISTING WETLAN D 29'45'30'BOA 10x70 (TYP) 10x70 (TYP) DI 111-A JB 111 DI 107-A DI 108 FES 107 FH 1-8"X8" TEE 3-8" GV PROPOSED 20' PRIVATE DRAINAGE EASEMENT PROPOSED 20' PRIVATE DRAINAGE EASEMENT EOP EOP EOP PROPOSED 34" WATER SERVICE (TYP) PROPOSED 34" WATER SERVICE (TYP) 8" SDR-21 PVC WL- 5' OFF EOP 8" SDR-21 PVC WL- 5' OFF EOP EOP DI 112 SAINT CLAIR D R I V E 50' PUBLIC R/W & U T I L I T YROBERT HOWE DRIVE50' PUBLIC R/W & UTILITY58 59 60 61 62 63 64 65 66 175 176 177 178 179 180 8" WL PHASE 3PHASE 2WMWM WMWM WMWM WM WM WM WM WM WM WM PVI STA.10+10.01PVI ELEV.301.31PVC STA.11+00.00PVC ELEV.299.02PVI STA.11+50.00PVI ELEV.297.75PVT STA.12+00.00PVT ELEV.296.69100.00VC -2.12% 1000.00SD PVC STA.12+00.00PVC ELEV.296.69PVI STA.12+50.00PVI ELEV.295.63PVT STA.13+00.00PVT ELEV.296.17100.00VC-2.12%1.07%31.36K-Val 249.87SD PVC STA.13+75.00PVC ELEV.296.97PVI STA.14+50.00PVI ELEV.297.77PVT STA.15+25.00PVT ELEV.296.73150.00VC1.07%-1.39%61.01K-Val CREST STA.14+40.35 CREST ELEV.297.32 345.30SD -1.95%PVI STA.16+50.00PVI ELEV.295.00PVI STA.18+75.00PVI ELEV.290.61-2.55% 1.07% -1.39% CREST STA.14+40.35 CREST ELEV.297.32 -1.95% -2.50%DI 104-C -REF. STA=16+47.68 RIM 292.33INV IN 287.85 - DDI 104-D - 30" ØINV OUT 287.75DI 104-B -REF. STA=17+15.26 RIM 291.02INV IN 287.40 - DI 104-C - 30" ØINV OUT 287.30DI 104-A -REF. STA=17+15.26 RIM 291.02INV IN 286.49 - DI 104-B - 30" ØINV OUT 286.39R_HOWE 10+00 301.5224"RCP III @ 0.51% 44.00LF STA12+65.05 24.00" Ø CRN EL. 291.53 INV EL. 289.53 24"MIN 30"RCP III @ 0.50% 70.51LF STA16+47.68 30.00" Ø CRN EL. 290.35 INV EL. 287.85 HGL 25 HGL 10 1-8"X8" TEE 3-8" GV EXISTING GRADE PROPOSED GRADE PROPOSED 8" SDR-21PVC WATERLINE 3' MIN 232.56 K-VAL PROPOSED 3:1 TIE IN AT PHASE LINE 24"MIN 24"MIN DITCH-FLOW L I N E PROPOSED FIRE HYDRANT TO BE INSTALLED IN PHASE 3 -2.00% STA10+44.37 18.00" Ø CRN EL. 294.74 INV EL. 293.24 DI JB 111 -REF. STA=10+44.37RIM 297.82INV OUT 293.68DI JB 111A -REF. STA=10+44.37RIM 297.74INV IN 293.24 - DI 111-A - 18" ØINV IN 293.24 - DI 112 - 18" ØINV OUT 293.14DI 107-A -REF. STA=12+65.05RIM 293.28INV IN 289.93 - DI JB 111 - 18" ØINV IN 289.53 - DI 108 - 24" ØINV OUT 289.43Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø ØØØØØØØ Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø 18"RCP III @ 1 . 4 5 % 2 2 0 . 6 8 L F 18"RCP III @ 0.99% 44.00LF STA17+15.26 30.00" Ø CRN EL. 288.61 INV EL. 286.11 2" BOA WITH 8" GV 8" GV TO BE CLOSED AND BOA REMOVED AT TIME OF PHASE 3 CONSTRUCTIONPHASE 3EXISTING PHASE 2PHASE 3 P&P SAINT CLAIR DRIVE (A) - AS-BUILT C12 PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 5.31.23 @ 2:47 PM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING 0 502550 GRAPHIC SCALE 100 NORTH EIPEXIST. AXLEPROPOSED 20' PRIVATEDRAINAGE EASEMENT10 x 70(TYP)S10° 01' 04.23"W1940.43 S82° 26' 49.18"E298.99S86° 03' 25.98"E136.80108.54'106.45'105.20'88.18'11+0010+0011+007+79.129+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0050'20'N 10°04'32"E 810.38'N 88°31'54"W527.71'N 10°05'25"E527.47'10+00.0010+00.0029' 45' 30'30'148'BOAFH10x70(TYP)10x70(TYP)10x70(TYP)FH1-8"X8" TEE3-8" GVDI 111-AJB 111FH1-8"X8" TEE3-8" GVPROPOSED 20'PRIVATE DRAINAGEEASEMENTEOPEOPEOPPROPOSED 34"WATER SERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)(TYP)8" SDR-21 PVC WL-5' OFF EOP8" SDR-21 PVC WL-5' OFF EOPDI 1122"BOA WITH 8" GVWILL BE REMOVEDAT THE TIME OFPHASE 4 WATER LINECONSTRUCTION ARESTRAINED JOINTWILL BE ADDED 168'FROM CAPROBERT HOWE DRIVE 50' PUBLIC R/W & UTILITY DI-112APROPOSED 34" WATERSERVICE (TYP)10x70(TYP)515253545556575859606162156157158159174175PHASE 3PHASE 4BOWMWMWMWMWMWMWMWMWMWMWMWMBOWMWMWMWMFH PUTNAM 14+38.52 309.51SAINT CLAIR 10+00 301.521.82% 4.32%PVC STA.14+75.00PVC ELEV.310.18PVI STA.15+75.00PVI ELEV.312.00PVT STA.16+75.00PVT ELEV.316.7815"RCP III @ 1.3 4 % 3 2 3 . 4 3 L FDI 112 -REF. STA=9+79.92 RIM 298.45INV IN 294.50 - DI 112-A - 15" ØINV OUT 294.21DI 112-A -REF. STA=13+03.35 RIM 304.34INV OUT 298.84ØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØØDITCH - F L O W L I N E EXISTING GRADE PROPOSED GRADE 1-8"X8" TEE 3-8" GV 1-8"X8" TEE 3-8" GV BOA JB 111 -REF. STA=9+79.92 RIM 297.74INV IN 293.24 - DI 112 - 18" ØINV IN 293.24 - DI 111-A-18"ØINV OUT 293.14STA 9+79.92 18" Ø CRN EL. 294.74 INV EL. 293.24 HGL 25 HGL 10 PROPOSED 8" SDR-21PVC WATERLINE 3' MIN PROPOSED 3:1 TIE IN AT PHASE LINE BOA 24"MIN 4.78%PVT ELEV.320.25PVT STA.17+50.00PVI ELEV.319.17PVI STA.17+25.00PVC ELEV.317.97PVC STA.17+00.00411.06SD 67.67K-Val 4.78%1.82%200.00VC 50.00VC 4.78% 108.62K-Val 1468.68SD 4.32% FUTURE ROBERT HOWE EXTENSION EXISTING GRADEPHASE 3FUTURE PHASE 4PHASE 3 P&P ROBERT HOWE (A) - AS-BUILT C13 PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 5.31.23 @ 2:47 PM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING 0 502550 GRAPHIC SCALE 100 NORTH PROPOSED 20' PRIVAT E D R A I N A G E PR O P O S E D 2 0 ' P R I V A T E 10 x 7 0 (TY P ) S86 ° 0 3 ' 2 5 . 9 8 " E 136 . 8 0 L=945.15,R=900 N33° 4 6' 2 2. 2 7" E 152.98 S14° 38' 07.63"E 75.20 L=113.68, R=402 16+0017+0018+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0022+34 . 9 3 1 4 + 0 0 15 + 0 0 ØDS 4C 8+11.12 9+0010+00L=515.30,R=34050'20' 50' 20' R50 R35 10 + 0 0 . 0 0 ØØ30'148'45'30'30'10x 7 0 (TY P ) FH DI-1 0 6 DI-1 0 5 A DI-5 0 8 DI-5 0 7 DI-5 0 8 A DI-5 0 8 B DI-5 1 9 1-8" X 8 " T E E 3-8" G V FH DI-5 2 0 FH PR O P O S E D 2 0 ' DR A I N A G E EAS E M E N T EO P EO P EOP EO P EOP EO P PR O P O S E D 3 4" WA T E R S E R V I C E (TY P ) PR O P O S E D 3 4" WA T E R S E R V I C E (TY P ) 8" S D R - 2 1 P V C W L - 5' O F F E O P 8" S D R - 2 1 P V C W L - 5' O F F E O P 2" S D R - 2 1 P V C W L - 5' O F F E O P 8" S D R - 2 1 P V C W L - 5' O F F E O P 8" S D R - 2 1 P V C W L - 5' O F F E O P PUTN A M S T R E E T 50' PU B L I C R / W & U T I L I T Y JOHN STARK DRIVE50' PUBLIC R/W & UTILITYPUTN A M S T R E E T 50' PU B LI C R/ W & U TI L I T Y " W A T E R SE R V I C E ( T Y P ) 8" W L 10x 7 0 (TY P ) PR O P O S E D 3 4" WA T E R S E R V I C E (TY P ) PR O P O S E D 3 4" WA T E R S E R V I C E (TY P ) BO A 2" S D R - 2 1 P V C W L - 5' O F F E O P DS- 1 0 PR O P O S E D 2 0 ' PRI V A T E DR A I N A G E EAS E M E N T 2" W L 2-8" GV T E E 1-8" X 8 " C R O S S 3-8" G V 1- 8" C A P 1-2" G V TARLETON DRIVE50' PUBL IC R/W & UT IL ITY 1-8" X 8 " C R O S S 3-8" G V 8" S D R - 2 1 P V C W L - 5' O F F E O P 132 133 134 135 136 137 158 159 160 161 162 163 165 166 167 171 172 173 174 PH A S E 3 WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM BO WM WM WM WM WM WM J_STARK rev 102919 22+34.93 301.17R_HOWE 10+00 309.51TARLETON 16+64.96 304.69-1.88% -1.20%PVI STA.10+10.06PVI ELEV.309.320.89%PVC STA.14+50.00PVC ELEV.304.06PVI STA.15+00.00PVI ELEV.303.46PVT STA.15+50.00PVT ELEV.303.91100.00VC-1.20%0.89%47.84K-Val 894.45SD -0.95%PVC STA.16+14.96PVC ELEV.304.49PVI STA.16+64.96PVI ELEV.304.94PVT STA.17+14.96PVT ELEV.304.46100.00VC0.89%-0.95%54.21K-Val CREST STA.16+63.42 CREST ELEV.304.71 410.26SD -0.50%PVC STA.18+75.00PVC ELEV.302.94PVI STA.19+25.00PVI ELEV.302.46PVT STA.19+75.00PVT ELEV.302.21100.00VC-0.95%-0.50%221.85K-Val 1000.00SD 2.08%PVI STA.22+24.93PVI ELEV.300.96EXISTING GRADE PROPOSED GRADE 1-8"X8" CROSS 3-8" GV 1-8"X8" TEE 3-8" GV 1-8"X8" TEE 3-8" GV PROPOSED 8" SDR-21PVC WATERLINE HGL 25 HGL 1024"MIN 3' MIN FH 24"MIN DITCH-FLOW LI N E DITCH-FLOW LINE 18"RCP III @ 0.92% 1 3 7 . 9 8 L F 18"RCP III @ 0.50% 139.22LF 24"RCP III @ 0.50% 201.06LFDI 520 -REF. STA=16+19.00RIM 301.83INV OUT 298.56DI 519 -REF. STA=17+14.40RIM 301.83INV IN 298.09 - DI 520 - 18" ØINV OUT 297.99DI 508-B -REF. STA=18+55.99RIM 300.41INV IN 296.72 - DI 519 - 18" ØINV OUT 296.62DI 508-A -REF. STA=19+98.85RIM 299.39INV IN 295.92 - DI 508-B - 18" ØINV OUT 295.42DI 508 -REF. STA=22+02.04RIM 298.46INV IN 294.41 - DI 508-A - 24" ØINV OUT 294.31DI 507 -REF. STA=22+06.83RIM 298.02INV IN 294.05 - DI 508 - 24" ØINV OUT 293.55Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø ØØØØØØØ Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø ØDI 105-A -REF. STA=15+06.72RIM 301.01INV IN 297.70 - DI 106 - 18" ØINV OUT 297.60DI 106 -REF. STA=15+07.19RIM 301.01INV OUT 297.8418"RCP III @ 0.50% 93.01LF FH PHASE 3 P&P PUTNAM COURT - AS-BUILT C14 PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 5.31.23 @ 2:47 PM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING 0 502550 GRAPHIC SCALE 100 NORTH OS398,102 SF2.25 AC.10 x 70(TYP)PROPOSED 20'PRIVATE DRAINAGEEASEMENTN 2 7 ° 5 8 ' 3 1 . 7 0 " E 8 4 4 . 6 2 L=945.15,R=900S14° 38' 07.63"E 75.20 L=113.68, R=402 17+0 0 18+0 0 15+00 16+00 17+00 18+00 19+00 8+11.129+00 10+00 11+00 12+0 0 13+0 0 14+0 0 15+0 0 DS4AN66° 41' 42.93" W 517.39L =2 4 9 .7 7 ,R =4 0 0 EOPPROPOSED 34"WATER SERVICE(TYP)50'20'50'20'R50R35JB 109DI 109ADI 11045'30'PROPOSED 20' PRIVATEDRAINAGEEASEMENTDI-106DI-508BDI-519DI-520FHEOPEOPEOPEOPPROPOSED 34"WATER SERVICE(TYP)2" SDR-21 PVC WL-5' OFF EOPPROPOSED 20'PRIVATE DRAINAGEEASEMENT8" SDR-21 PVC WL-5' OFF EOPPROPOSED 20'DRAINAGEEASEMENTPROPOSED 34"WATER SERVICE(TYP)BOA2" SDR-21 PVC WL-5' OFF EOPPROPOSED 20'PRIVATEDRAINAGEEASEMENT2" WL2-8"GV TEE1-8"X8" CROSS3-8" GV1- 8" CAP1-2" GVTARLETO N D R I V E 50' PUBL I C R / W & U T I L I T Y1-8"X8" CROSS3-8" GV8" SDR-21 PVC WL-5' OFF EOP131132162163164165166167168169184185186187188189PHASE 3PHASE 4PHASE 3PHASE 2WMWMWMWMBOWMWMWMWMWMWM 2.08%PVI STA.9+90.00PVI ELEV.304.50-2.0 8 %PVI STA.10+00.00PVI ELEV.304.94-0.81%PVI STA.10+10.00PVI ELEV.304.500.49%PVC STA.13+25.00PVC ELEV.301.94PVI STA.13+75.00PVI ELEV.301.54PVT STA.14+25.00PVT ELEV.301.79100.00VC-0.81%0.49% 77.04K-Val 1000.00SD 2.28%PVI STA.16+49.18PVI ELEV.302.89-2.08%PVI STA.16+59.21PVI ELEV.303.12PVI STA.16+69.21PVI ELEV.302.91DI 519-REF. STA=17+14.40RIM 301.83INV IN 298.09-DI 520 - 18" ØINV OUT 297.84PUTNAM10+00 304.94DI 520 -REF. STA=16+19.00RIM 301.83INV OUT 298.5618" RCP FROM DI 520-ELEV 298.18 18" RCP III @ 0.50% 44.00 LF T_GAGE16+59.21 303.121-8"X8"CROSS 4-8" GV 1-8"X8" CROSS 3-8" GV HGL 25 HGL 10 24"MIN 3' MIN PROPOSED 2" SDR-21PVC WATERLINE PROPOSED 3:1 TIE IN AT PHASE LINE DITCH-FLO W L I N E 1- 8" CAP 1-2" GV REMOVE EXISTING BOA AND EXTEND AS SHOWN -1.51% 18"RCP III @ 0.33% 319.49LFDI 109-A -REF. STA=13+89.15RIM 298.99INV IN 295.36 - DI 110 - 18" ØINV OUT 295.26DI 110 -REF. STA=13+88.55RIM 298.99INV IN 295.68 - DI 113 - 18" ØINV OUT 295.58DI 113 -REF. STA=17+08.04RIM 300.02Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø ØØØØØØØØØØØ Ø PROPOSED 8" SDR-21PVC WATERLINE BOA 12"MIN CONCRETE CRADLE SEE SHT. CD9 PHASE 3EXISTING PHASE 2PHASE 3 P&P TARLETON DRIVE - AS-BUILT C15 PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 5.31.23 @ 2:47 PM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING 0 502550 GRAPHIC SCALE 100 NORTH PROP OS ED 20' P RIVATE D R AIN A G E EASEME NT N0 8 ° 4 3 ' 2 9 . 2 2 "E 2 6 7 . 03N0 8 ° 4 3 ' 29 . 2 2 " E 27 1 . 1 8 S86° 13' 31.66"W 160.97L =7 0.2 7,R =400N33° 46' 22.27"E152.98SUITABLE 10 x 70 (TYP) 24+0 0 25+0 0 26+0 0 27+0 0 28+0 0 12+0013+00PC13+98.0314+0015+0016+0017+0018+0019+00PT19+13.3320+0021+0022+00PC22+89.4923+0024+0022+0022+34.938" WLØØØDS 3A DS 3B DS 4C17+57.19 15+0 0 16+00 17+00 S 0 4 ° 4 6 ' 2 1 . 5 1 "W 3 9 8 . 0 3 L=515.30,R=340 S82° 0 3' 4 8. 8 0" E 376.16 BARN *TBREOP EOPPROPOSED WATER SERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)50'20'DI 512199'30'47'DI-508DI-5071-8"X8" TEE3-8" GV FH JOHN S T A R K D RI V E 50' P U B LI C R/ W & U TI LI T YDI- 503A DI- 511PROPO S ED 20'PROPOS E D 20' PRIV AT E DRAINA G E EASEM E NT EOP EOP EOP EOPEOP PRO P O SE D 34"WATE R SE R VI C E (TYP)PROP OS E D 34"WATE R S E RVI CE (TYP) PRO P OSE D 34"WATE R SE RVI CE (TYP)1-8"X8" TEE 3-8" GV 8" SDR-21 P V C WL-5' OFF E O P DS 3B DI-512 DI-511A JO H N S T A R K D R I V E 50' P U B L I C R / W & U T I L I T Y PRO P O SE D 20'DRAINA G E EASEM ENT24 181221231241251351381391401491920212223PHASE 1PHASE 2PHASE 3PHASE 4BO WM WM WM WM 0.50%PVI STA.10+10.00PVI ELEV.305.57-1.06%PVC STA.11+75.00PVC ELEV.306.40PVI STA.12+25.00PVI ELEV.306.65PVT STA.12+75.00PVT ELEV.306.11100.00VC0.50%-1.06%63.92K-Val CREST STA.12+06.97 CREST ELEV.306.48 474.81SD PVC STA.18+60.00PVC ELEV.299.89PVI STA.19+20.00PVI ELEV.299.25PVT STA.19+80.00PVT ELEV.300.00120.00VC-1.06%1.25%51.85K-Val 600.48SD PVC STA.19+90.00PVC ELEV.300.13BRODHEAD 14+44.21 304.31T_GAGE 10+00 305.78EXISTING GRADE PROPOSED GRADE HGL 25HGL 10 1-8"X8" TEE 3-8" GV 1-8"X8" TEE 3-8" GV PUTNAM 17+39.32 301.171-8"X8" TEE 3-8" GV PROPOSED 8" SDR-21PVC WATERLINE 24"MIN 3' MIN FH PROPOSED 3:1 TIE IN AT PHASE LINE PROPOSED 3:1 TIE IN AT PHASE LINE BOA 24"MIN DITCH-FLOW L I N E 1.25% -2.08% EXISTING 2" BOA WITH 8" BOA CLOSE EXISTING 8" GV AND REMOVE 2" BOA AND EXTENDØØØØØØØØØØØØØØØØØØØ Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø ØØØ30"RCP III @ 0.30% 182.57LF 30"RCP III @ 0.80% 1 9 2 . 9 6 L FDI 510 -REF. STA=10+45.54RIM 303.04INV IN 299.33 - DI 510-A - 18" ØINV OUT 298.33DI-JB 504-A -REF. STA=12+28.12RIM 303.73INV IN 297.78 - DI 510 - 30" ØINV IN 297.78 - DI 504-B - 30" ØINV OUT 297.68DI 504 -REF. STA=14+19.24RIM 301.75INV IN 296.13 - DI-JB 504-A - 30" ØINV IN 295.98 - DI 509 - 18" ØINV OUT 295.07DI 503-A -REF. STA=14+42.36RIM 301.63INV IN 294.52 - DI 504 - 30" ØINV OUT 294.0230"RCP III @ 0.50% 149.07LFDI 507 -REF. STA=17+68.95RIM 298.02INV IN 294.05 - DI 508 - 24" ØINV OUT 293.55DI 512 -REF. STA=19+08.77RIM 296.89INV IN 292.80 - DI 507 - 30" ØINV IN 293.63 - DI 521 - 15" ØINV IN 293.38 - DI 512-A - 18" ØINV OUT 292.38DI 511-A -REF. STA=19+14.55RIM 296.89INV IN 292.25 - DI 512 - 30" ØINV OUT 292.1515"RCP III @ 0.30% 188.29LF STA 10+45.54 18.00" Ø CRN EL. 300.83 INV EL. 299.33 STA12+28.12 30.00" Ø CRN EL. 300.28 INV EL. 297.78 STA14+19.24 18.00" Ø CRN EL. 297.48 INV EL. 295.98 STA17+68.95 24.00" Ø CRN EL. 296.05 INV EL. 294.05 STA19+08.77 15.00" Ø CRN EL. 294.88 INV EL. 293.63 STA19+08.77 18.00" Ø CRN EL. 294.88 INV EL. 293.38 30"RC P I I I @ 1.00% 5 5 . 5 0 L F PROPOSED 8" SDR-21PVC WATERLINE FUTURE PHASE 4PHASE 3PHASE 3EXISTING PHASE 2PHASE 3 P&P JOHN STARK DRIVE (A) - AS-BUILT C16 PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 5.31.23 @ 2:47 PM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING 0 502550 GRAPHIC SCALE 100 NORTH PROPOSED 20' PRIVATEDRAINAGE EASEMENTSUITABLESOILSN0 8 ° 4 3 ' 2 9 . 2 2 " E 27 1 . 1 8 L =74 3 .30,R=45 0 10 x 70 (TYP)OS243,401 SF1.00 AC26+0027+0028+00PC28+70.9329+0030+0031+0032+0033+0034+0035+0036+00PT36+14.2322 + 0 0 PC22+89.4923 + 0 0 ØØØPROPOSED 20'PRIVATEDS3BDS3C10 x 70OS243,401 SF1.00 ACPROPOSED 34"WATER SERVICE50'20'30'JB 552DS3DHW 502 AND 501FHFHPROPOSED 20'PRIVATEDRAINAGEEASEMENTEW 501EOPPROPOSED 34"WATER SERVICE(TYP)PROPOSED WATERSERVICE(TYP)PROPOSED 34"WATER SERVICE(TYP)EW 502DS 3CDS 3BDS 3AEOPFUTUREEOPDS 3DTHOM A S G A G E 50' PU B L I C R / W & U T I LI T Y 8" SDR-21PVCWATERLINEEOP2"BOA WITH 8" GV WILLBE REMOVED AT THETIME OF PHASE 4 WATERLINE CONSTRUCTION ARESTRAINED JOINT WILLBE ADDED 168' FROM CAPT H O M A S G A G E D R I V E 50 ' P U B L I C R / W & U T I L I T Y 1516172627182930313233341231928PHASE 2PHASE 3PHASE 3PHASE 4PHASE 1PHASE 2WMWMWMWMWMBOJ_STARK rev 102919 25+99.74 299.52-4.0 1 %PVT STA.25+50.00PVT ELEV.300.91-4.01%PVI STA.25+89.74PVI ELEV.299.32PVI STA.25+99.74PVI ELEV.299.52-4.7 8 %PVI STA.26+09.74PVI ELEV.299.31-1.53%PVC STA.26+25.00PVC ELEV.298.58PVI STA.27+00.00PVI ELEV.295.00PVT STA.27+75.00PVT ELEV.293.85150.00VC-4.78%-1.53%46.20K-Val 296.34SD PVC STA.30+00.00PVC ELEV.290.40PVI STA.30+75.00PVI ELEV.289.25PVT STA.31+50.00PVT ELEV.291.15150.00VC-1.53%2.53%36.92K-Val 218.21SD Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø ØØØØØØØØØØØØØØØØØØØ Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø -2.11% 2.05% PROPOSED GRADEDI 522 -REF. STA=25+62.68 RIM 297.54INV OUT 295.08DI 521 -REF. REFER TO J_STARK RD PROFILE RIM 297.52INV IN 294.80 - DI 522 - 15" ØINV OUT 294.702-36" RCP III @ 1.04% 47.87 LF 48.00 LF 1-8"X8"CROSS 4-8" GV HGL 25 HGL 10 18"RCP III @ 0.50% 69.89LF 24"MIN 3' MIN FH FH PROPOSED 3:1 TIE IN AT PHASE LINE STA:33+5024"MIN DIT C H - F L O W L I N E PROPOSED FIRE HYDRANT TO BE INSTALLED IN PHASE 3 20' STEEL CASING PIPE CENTERED AT CULVERTS SEE SHEET CD9. 2 SPIDERS PER JOINT 2.53% FUTURE THOMAS GAGE ROAD EXTENSION EXISTING GRADE BOA PROPOSED 8" SDR-21PVC WATERLINE DIP UP TO 45 CONNECTION BOAEXISTING PHASE 2PHASE 3PHASE 3FUTURE PHASE 4MATCHLINEMATCHLINEPHASE 3 P&P THOMAS GAGE DR (B) - AS-BUILT C17 PLAN REVISIONS #DATE REVISION BY PROJECT #: DRAWN BY: REVIEWED BY: 1ST SUBMITTAL: SCALE: SEALED:X:\CIVIL\PROJECTS\2020\C20035.00 - BIRCHWOOD GROVE CA\TECHNICAL\CONSTRUCTION ADMIN\AS-BUILTS & CERTIFICATIONS\CAD\PHASE 3\ASB SHEET SET\COVER & STORM.DWG PRINTED BY: MICHAELPETERSON 5.31.23 @ 2:48 PM LAST SAVED BY: MICHAELPETERSONPREPARED BY: PREPARED FOR: KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. R PROJECT: SHEET: C20035 MP LL 2023.05.31 AS NOTED BIRCHWOOD GROVE SUBDIVISION PHASE 3 UTILITY AS-BUILT PLANS KB HOMES U.S. 401 HARNETT COUNTY HECTOR CREEK, NC under foot ENGINEERING 1149 EXECUTIVE CIRCLE CARY, NC 27511 P:919.576.9733 NCBELS # C-3847 NOR T H C ARO LI NALAND O N M. L O V E LACEPRO F E S SIO N ALENGIN E E R 032674 2023.05.31 AS-BUILT RECORD DRAWING 0 502550 GRAPHIC SCALE 100 NORTH