Loading...
HomeMy WebLinkAboutDuke Energy P3 Streetlight AgmtDuke Energy Progress LED - Company Owned - NC-SLS-79 Estimate LIGHTING Proposal Date:7/27/23 SOLUTIONS Prepared by: EDDIE M WATKINS Job Title:SR ENG TECH Phone: Business Partner BIRCHWOOD GROVE PH 3 Corp. ID#: Street Address 5865 US 401 Mail Code: City, State, Zip FUQUAY VARINA NC 27526 Construction Schedule Date: Customer Phone: Contract Account WO#: Installation # Drawing # / Design Description Service Location of Light(s)BIRCHWOOD GROVE PH 3 Pricing Changes Effective 6-1-2023 LED Fixtures Watts # of Items Monthly *Total Cost LED 50 Roadway / NEIGHBORHOOD 50 11 @ $8.34 =91.74 LED 50 Cobra (MFC)50 @ $8.66 =- LED 75 Cobra (MFC)75 @ $8.78 =- LED 70/75 Roadway 75 @ $8.71 =- LED 105/110 Roadway 105 @ $10.80 =- LED 150 Roadway 150 @ $14.15 =- LED 215/220 Roadway 215 @ $17.51 =- LED 280 Roadway 280 @ $20.33 =- LED 150 Sitelighter (MFC) Not for New Installs 150 @ $18.25 =- LED 150 Shoebox (MFC)150 @ $17.36 =- LED 205/220 Shoebox (MFC) Not for New Installs 205 @ $21.15 =- LED 220 Shoebox 220 @ $21.88 =- LED 420 Shoebox 420 @ $45.50 =- LED 530 Shoebox 530 @ $55.51 =- LED Post Top Fixtures Mini Bell (MFC)50 @ $13.40 =- Traditional /Traditional Open (MFC)50 @ $8.68 =- Pedestrian Shoebox "S" (MFC)50 @ $12.58 =- Acorn "A" (MFC)50 @ $9.11 =- Enterprise 50 (MFC)50 @ $12.95 =- Enterprise 150 (MFC)150 @ $17.91 =- Enterprise 220 (MFC)220 @ $20.20 =- Standard Pole(s)Mounting Height # of Items Monthly *Total Cost Wood Pole 25', 30', 35'@ $1.83 =- 16' Black Fiberglass Pole 16'@ $3.21 =- Gray Fiberglass Pole / Metal** Pole 25', 30', 35'11 @ $3.21 =35.31 Decorative Square Metal Pole 30'@ $12.26 =- Non Standard Pole(s)Mounting Height # of Items Monthly *Total Cost Black Fiberglass Poles (MFC)25'@ $6.55 =- Black Fiberglass Poles (MFC)30'@ $7.37 =- Black Fiberglass Poles (MFC)35'@ $7.97 =- Black/Bronze Decorative Round 35' Steel Pole (MFC)35'@ $27.14 =- Style "A" Alum Direct Embed Poles (MFC)12'@ $11.61 =- Style "A" Alum Direct Embed Poles (MFC)15'@ $11.85 =- Style "A" Alum Direct Embed Poles (MFC)17'@ $12.82 =- Style "A" Alum Anchor Base Poles (MFC)12' and 17'@ $18.03 =- Tenon Adapter @ $1.82 =- Use when Site Lighter(s) are mounted on Round Black Fiberglass and Round Black Tapered Steel Poles. One adapter is used for each pole. Monthly Underground Service Charge # of Items Monthly *Total Cost Per Pole NC @ $3.45 =- One-Time Underground Service Charge # of Items One-time Charge Total Cost Per Pole NC 11 @ $580.00 =6,380.00 One-Time LED Conversion Charges (Lights Less than 20 years old) # of Items One-time Charge Total Cost Fixtures @ $50.00 =- Poles @ $500.00 =- Total Proposed "Monthly" Charges Before Taxes Subtotal 127.05 7% Tax 8.89 Total 135.94$ Total Proposed One-Time Charges Subtotal 6,380.00 7% Tax 446.60 Total 6,826.60$ Comments: This price is to be used as an estimate only.