Loading...
HomeMy WebLinkAboutSerenity - DRB Cover Letter.230208 8601 Six Forks Road Suite 270| Raleigh, NC | 27615 www.greenfieldcommunities.com DATE: February 8, 2023 TO: Development Review Board C/O Jay Sikes, Manager of Planning Services RE: Application for Final Subdivision Plat Review Serenity, Phase 1DE2G Mr. Sikes, The purpose of this letter is to provide an update on Serenity and insight on this application that may not otherwise be recognizable from the submittal package that follows. This cover is intended for our second construction phase of Serenity; consisting of 69 lots under the designation from Construction Drawings as Phases 1D, 1E & 2G. Similar to our first subdivision plat, this submittal package includes two separate applications for DRB’s review; one for lots sized equal and greater than 9,000 square feet, and the other for lots less than 9,000 square feet. As we’ve discussed, the distinction in lot size is the division that requires a fire rated wall assembly (and associated notation) for lots less than 9k, contrast to the map of lots greater than 9k sf that does not require that wall assembly. Construction activity in this phase of Serenity is going very well, but the work is not complete. That said, it’s important to acknowledge this phase is not ready for final on-site inspections that would typically be triggered an application for Final Plat review. Our surveyors have diligently prepared the maps and are looking to solicit your review on that element, as well as the other enclosures listed on the transmittal that follows. Please consider some additional details for context in our current Applications:  Anticipated Construction Milestones for Ph 1DE/2G: - Streets Paved in March ‘23 - Utilities Accepted by HRW April ‘23 - Plats approved by DRB, bonds posted and Map recorded by end of May '23  The DRB application states that HOA documents are required to be enclosed. I hope it’s sufficient to acknowledge that all HOA documents have been previously recorded and shared with the County as part of our phase 1ABC final subdivision plat, previously approved. No changes since.  As suggested above, our intent is to complete installation and obtain acceptance for utility work prior to plat recordation. There will be site related elements that cannot be completed prior to platting, as such an estimate for those items (street trees, sidewalks, final inch, etc.) is enclosed. We intend to have our Engineer update this estimate and certify the amount remaining at that time, just prior to the April DRB hearing, such that we can post the surety for this amount prior to Plat recordation. Page 2 of 2 Your team is welcome to visit Serenity at any time, and it would be our pleasure to give you a tour if helpful. Learning from the review of our first construction phase, we thought this letter was best way to be respectful to the Board’s time and avoid pre-mature site inspections and minimize questions about the completeness of the current phase. Should you have any questions during review, please don’t hesitate to contact me or my team. Sincerely, Ben Taylor, EI Vice President, Development Greenfield Communities cc Withers Ravenel