HomeMy WebLinkAboutBlackberry Manor Phase II-C - DRC Response Letter 060123 1 2 2 C I N E M A D R I V E , W I L M I N G T O N , N C 2 8 4 0 3 P H : ( 9 1 0 ) 7 9 1 - 6 7 0 7 F A X : ( 9 1 0 ) 7 9 1 - 6 7 6 0 June 1, 2023 Theresa M Jones Harnett County 420 Mckinney Pkwy Lillington, NC 27546 VIA EMAIL: tjones@harnett.org RE: Blackberry Manor Phase II-C Final Plat – DRC Response Ms. Jones, We are submitting a response to the DRC decision packet dated March 8, 2023. Please find the DRC comments listed below with our response provided in bold. Engineering, Bill Dreitzler 1. Reshape, seed and mulch the shoulders along Nector Drive. a. Improvements completed. 2. Re-grade the north side ditch line along Nector Drive for positive drainage. Holding water. a. Improvements completed. Fire, Leslie Jackson 1. Approved. a. Thank you. GIS/E-911 Addressing, Tammy Ward 1. Vicinity Map: Kotata Way should be Kotata Ave a. Plat revised accordingly. 2. Rd Sign Fees due $400.00 a. Fees have been paid. Development Services, Jay Sikes; Meade Bradshaw 1. On Plat: a. Add SUB2302-0009 as the case file number for the plat i. Case number added to the site data table. b. Change County References to Harnett in the certifications i. Plat revised accordingly. c. Have road signs been purchased yet i. Yes, the sign fee has been provided to GIS. 1 2 2 C I N E M A D R I V E , W I L M I N G T O N , N C 2 8 4 0 3 P H : ( 9 1 0 ) 7 9 1 - 6 7 0 7 F A X : ( 9 1 0 ) 7 9 1 - 6 7 6 0 d. Have HOA documents been prepared? i. Yes, HOA docs previously provided. 2. Provide a response to comments document. a. Noted. 3. Another submittal is required. a. Noted. Harnett Regional Water, Rudy Wells 1. Complete the HRW Final Checklist in accordance with Sections 3.5.3, 3.5.4, and 3.5.5 of Harnett Regional Water standard specifications. a. Response: Provided to HRW in October 2022. 2. The utility mains that will serve the proposed subdivision must be approved by HRW and NCDEQ before the developer can record the final plat. a. Response: HRW and NCDEQ both have issued approvals and certifications to date (NCDEQ DEH 07-01917; Certified by Engineer and HRW October 2022] (NCDEQ WQ0031803; Certified by Engineer and HRW in October 2022] 3. Show sanitary sewer easement on lot 71 and adjust lot setback lines if applicable. a. Utility easement added to lot 71. 4. The final plat and the As-Built Record Drawings location of utilities should coincide. The As-Built Record Drawings and PE certifications must be submitted to HRW for review before the final plat can be recorded. a. Response: As-builts were completed in Summer of 2022 and approved as indicated above. 5. The Developer must provide HRW a Cost Statement indicating the cost to install the utilities (materials and labor) that will serve the subdivision. a. Response: Wellons Construction provided the utility costs of water: $84,764.00 and sewer: $113,214.75 on March 15 email to Katherine Moore with HRW. 6. The developer and the utility contractor must provide HRW with a one (1) year warranty on the utility system improvements installed to serve the lots in the proposed subdivision. a. Response: Completed. Environmental Health, Oliver Tolksdorf 1. Project served by public sewer a. Thank you. Thank you for your attention to this matter. If you have any questions regarding any of this information or require additional material, please feel free to call. Sincerely, Paramounte Engineering, Inc.