Loading...
HomeMy WebLinkAboutParrish Road PUD TIA Parrish Road Residential Traffic Impact Analysis, Harnett County, NC / May, 2024 Prepared by: McAdams PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 2 of 38 PARRISH ROAD RESIDENTIAL HARNETT COUNTY, NORTH CAROLINA TRAFFIC IMPACT ANALYSIS PROJECT NUMBER: FRS24006 PREPARED BY: TUCKER FULLE, EI REVIEWED BY: NATE BOUQUIN, PE, PTOE DATE: MAY 2024 621 HILLSBOROUGH STREET, SUITE 500 RALEIGH, NC 27603 NC LIC. # C-0293 PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 3 of 38 EXECUTIVE SUMMARY The proposed residential development will be located along Parrish Road, south of Chalybeate Springs Road, in Harnett County, North Carolina. Site access will be served via three (3) full movement driveways along Parrish Road with the northern and southernmost driveways aligned across Parrish Road. The site is currently undeveloped and is expected to consist of a maximum of 183 single family homes, 184 townhomes, and 2,000 square feet (sq. ft.) of retail space. The proposed site is expected to be built-out by the year 2028. The purpose of this Traffic Impact Analysis (TIA) is to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to mitigate the impacts on the roadway network. A NCDOT TIA Scoping Checklist (TIA Scoping Checklist) was submitted to North Carolina Department of Transportation (NCDOT) and Harnett County (County) staff for review of the TIA scope and assumptions. TIA Scoping Checklist and approval correspondence is provided in the Appendix Pf this study. Based on the approved scoping, the following intersections are included in this TIA study area: > US 401 and Chalybeate Springs Road > Chalybeate Springs Road and Lafayette Road > Chalybeate Springs Road and Parrish Road > Chalybeate Springs Road and Purfoy Road > Future NC 55 Bypass and Chalybeate Springs Road > Future NC 55 Bypass and Northern U-Turn Location at Chalybeate Springs Road > Future NC 55 Bypass and Southern U-Turn Location at Chalybeate Springs Road > Parrish Road and Site Access #1 (Proposed) > Parrish Road and Site Access #2 (Proposed) > Parrish Road and Site Access #3 (Proposed) To determine the traffic impacts of the proposed development, the following analysis scenarios are included in this study: > Existing (2024) Traffic Conditions > No-Build (2028) Traffic Conditions > Build (2028) Traffic Conditions Peak hour traffic counts were conducted at the existing study intersections in March 2024 and balanced between study intersections, as appropriate to determine Existing (2024) traffic volumes. To account for background development growth, a 3% annual growth rate was applied to the existing traffic volumes to determine Projected (2028) traffic volumes. Based on coordination with NCDOT and County staff, it was determined that there were no approved adjacent developments to consider in this study. Based on the Institute for Transportation Engineers (ITE) Trip Generation Manual, 11th Edition, and the suggested method of trip calculations provided in NCDOT’s Rate vs. Equation spreadsheet trips for the proposed development were calculated for weekday daily, weekday AM peak hour, and weekday PM peak hour. A summary of this trip generation is provided in Table ES-1. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 4 of 38 TABLE ES-1: TRIP GENERATION Land Use (ITE Code) Density Calculation Methodology Daily Trips AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Single Family Homes (210) 183 Units Adjacent / Equation 1,759 32 94 129 110 65 175 Townhomes (215) 184 Units Adjacent / Equation 1,352 22 68 90 63 43 106 General Retail (822) 2 KSF Adjacent / Equation 314 6 4 10 12 13 25 TOTAL 3,425 60 169 229 185 121 306 The peak hour site traffic was distributed throughout the network according to the site trip distribution approved by NCDOT and County staff within the MOU. This site traffic was added onto the No-Build (2028) traffic volumes to determine the Build (2028) traffic volumes for the capacity analysis. Capacity analysis was conducted at all study intersections according to NCDOT guidelines utilizing the methodology contained in the Highway Capacity Manual, 6th Edition, published by the Transportation Research Board. Refer to Table ES-2 for a summary of the capacity analysis results. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 5 of 38 TABLE ES-2: CAPACITY ANALYSIS SUMMARY Intersection Conditions A P P R O A C H Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) US 401 + Chalybeate Springs Road Existing (2024) WB2 NB SB1 D (29) -- A (10) N/A F (61) -- B (10) N/A No-Build (2028) WB2 NB SB1 E (47) -- B (10) N/A F (194) -- B (11) N/A Build (2028) WB2 NB SB1 F (129) -- B (11) N/A F (676) -- B (11) N/A Build (2028) – Improved (Signalization) WB NB SB D (50) C (29) B (15) C (26) E (57) C (34) B (17) C (27) Chalybeate Springs Road + Lafayette Road Existing (2024) EB WB1 NB2 -- A (8) A (10) N/A -- A (8) B (11) N/A No-Build (2028) EB WB1 NB2 -- A (8) B (10) N/A -- A (8) B (11) N/A Build (2028) EB WB1 NB2 -- A (8) B (11) N/A -- A (8) B (12) N/A Chalybeate Springs Road + Parrish Road Existing (2024) EB WB1 NB2 -- A (8) B (11) N/A -- A (8) B (11) N/A No-Build (2028) EB WB1 NB2 -- A (8) B (11) N/A -- A (8) B (12) N/A Build (2028) EB WB1 NB2 -- A (8) B (13) N/A -- A (8) C (16) N/A Chalybeate Springs Road + Purfoy Road Existing (2024) EB1 WB SB2 A (8) -- A (10) N/A A (8) -- B (10) N/A No-Build (2028) EB1 WB SB2 A (8) -- A (10) N/A A (8) -- B (10) N/A Build (2028) EB1 WB SB2 A (8) -- B (10) N/A A (8) -- B (12) N/A 1. Level of service for major-street u-turn/left-turn movement. 2. Level of service for minor-street approach. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 6 of 38 TABLE ES-2: CAPACITY ANALYSIS SUMMARY (CONTINUED) Intersection Conditions A P P R O A C H Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) NC 55 Bypass Northbound + Chalybeate Springs Road No-Build (2028) WB2 NB SB1 B (15) -- C (24) N/A B (12) -- C (17) N/A Build (2028) EB2 NB1 SB C (15) -- D (26) N/A B (13) -- C (18) N/A NC 55 Bypass Southbound + Chalybeate Springs Road No-Build (2028) WB2 NB SB1 B (13) C (24) -- N/A C (19) E (36) -- N/A Build (2028) EB2 NB SB B (15) D (25) -- N/A C (23) E (50) -- N/A NC 55 Bypass + Northbound U-Turn Location at Chalybeate Springs Road No-Build (2028) NB1 SB B (12) -- N/A B (14) -- N/A Build (2028) NB1 SB B (12) -- N/A C (15) -- N/A NC 55 Bypass + Southbound U-Turn Location at Chalybeate Springs Road No-Build (2028) NB SB1 -- C (17) N/A -- B (13) N/A Build (2028) NB SB1 -- C (20) N/A -- B (14) N/A Parrish Road + Site Access #1 Build (2028) EB2 WB2 NB1 SB1 B (10) A (10) A (7) A (8) N/A B (11) A (10) A (8) A (8) N/A Parrish Road + Site Access #2 Build (2028) EB2 NB1 SB A (9) A (7) -- N/A A (10) A (8) -- N/A Parrish Road + Site Access #3 Build (2028) EB2 WB2 NB1 SB1 A (10) A (9) A (7) A (7) N/A B (10) A (9) A (7) A (7) N/A 1. Level of service for major-street u-turn/left-turn movement. 2. Level of service for minor-street approach. Based on the findings in the TIA, the improvements below have been recommended to be constructed by the developer to mitigate traffic impacts by the proposed development: US 401 and Parrish Road > Monitor intersection for signalization and install once warranted and approved by NCDOT. > Construct an exclusive southbound left-turn lane with a minimum of 100 feet of full width storage and appropriate deceleration and taper. Parrish Road and Site Access #1 > Construct Site Access #1 as the eastbound and westbound approaches with one (1) ingress and one (1) egress lane each, respectively. > Provide stop-control for the eastbound and westbound approaches. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 7 of 38 Parrish Road and Site Access #2 > Construct Site Access #2 as the eastbound approach with one (1) ingress and one (1) egress lane. > Provide stop-control for the eastbound approach. Parrish Road and Site Access #3 > Construct Site Access #2 as the eastbound and westbound approaches with one (1) ingress and one (1) egress lane each, respectively. > Provide stop-control for the eastbound and westbound approaches. Figure ES-1, on the following page, provides a graphical representation of recommended improvements at the study intersections. 62 LEGEND 700' 775' 800'675' 850' Unsignalized Full Movement Intersection U-Turn Location 100' Improvement by Developer Recommended Lane ConfigurationsStorage Length (In Feet) Scale: Not to Scale Figure ES-1 Existing Lane Parrish Road ResidentialImprovement by STIP R-5705B Developer Monitor for Signal Harnett County, NC 401Chalybeate Springs RoadChalybeate Springs RoadBY ∙ PASS 55 Purfoy Road Lafayette Road Parrish RoadSite Access #1Site Access #1Site Access #2Site Access #3Site Access #3SITE SITE X' PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 9 of 38 TABLE OF CONTENTS INTRODUCTION .............................................................................................................................................................. 12 EXISTING CONDITIONS ................................................................................................................................................... 15 NO-BUILD CONDITIONS .................................................................................................................................................. 18 BUILD CONDITIONS ........................................................................................................................................................ 20 CAPACITY ANALYSIS ........................................................................................................................................................ 24 US 401 + CHALYBEATE SPRINGS ROAD ................................................................................................................... 25 CHALYBEATE SPRINGS ROAD + LAYFAYETTE ROAD ................................................................................................ 27 CHALYBEATE SPRINGS ROAD + PARRISH ROAD ...................................................................................................... 28 CHALYBEATE SPRINGS ROAD + PURFOY ROAD ...................................................................................................... 29 NC 55 BYPASS + CHALYBEATE SPRINGS ROAD ....................................................................................................... 30 NC 55 BYPASS + NORTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD ......................................... 32 NC 55 BYPASS + SOUTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD .......................................... 33 PARRISH ROAD + SITE ACCESS #1 ........................................................................................................................... 34 PARRISH ROAD + SITE ACCESS #2 ........................................................................................................................... 35 PARRISH ROAD + SITE ACCESS #3 ........................................................................................................................... 36 CONCLUSION / RECOMMENDATIONS ............................................................................................................................ 37 FIGURES FIGURE 1 – SITE LOCATION MAP .................................................................................................................................... 13 FIGURE 2– SITE PLAN ...................................................................................................................................................... 14 FIGURE 3 – EXISTING LANE CONFIGURATIONS .............................................................................................................. 16 FIGURE 4 – EXISTING (2024) TRAFFIC VOLUMES ............................................................................................................ 17 FIGURE 5 – NO-BUILD (2028) TRAFFIC VOLUMES .......................................................................................................... 19 FIGURE 6 – SITE TRIP DISTRIBUTION .............................................................................................................................. 21 FIGURE 7 – SITE TRIP ASSIGNMENT ................................................................................................................................ 22 FIGURE 8 – BUILD (2028) TRAFFIC VOLUMES ................................................................................................................. 23 FIGURE 9 – RECOMMENDED LANE CONFIGURATIONS .................................................................................................. 38 PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 10 of 38 TABLES TABLE 1: ROADWAY CHARACTERISTICS ......................................................................................................................... 15 TABLE 2: TRIP GENERATION ........................................................................................................................................... 20 TABLE 3: HIGHWAY CAPACITY MANUAL – LEVELS OF SERVICE + DELAY CRITERIA ........................................................ 24 TABLE 4: CAPACITY ANALYSIS SUMMARY OF US 401 + CHALYBEATE SPRINGS ROAD ................................................... 25 TABLE 5: CAPACITY ANALYSIS SUMMARY OF CHALYBEATE SPRINGS ROAD + LAFAYETTE ROAD .................................. 27 TABLE 6: CAPACITY ANALYSIS SUMMARY OF CHALYBEATE SPRINGS ROAD + PARRISH ROAD ...................................... 28 TABLE 7: CAPACITY ANALYSIS SUMMARY OF CHALYBEATE SPRINGS ROAD + PURFOY ROAD ...................................... 29 TABLE 8: CAPACITY ANALYSIS SUMMARY OF NC 55 BYPASS + CHALYBEATE SPRINGS ROAD ....................................... 30 TABLE 9: CAPACITY ANALYSIS SUMMARY OF NC 55 BYPASS + NORTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD................................................................................................................................................................ 32 TABLE 10: CAPACITY ANALYSIS SUMMARY OF NC 55 BYPASS + SOUTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD................................................................................................................................................................ 33 TABLE 11: CAPACITY ANALYSIS SUMMARY OF PARRISH ROAD + SITE ACCESS #1 ......................................................... 34 TABLE 12: CAPACITY ANALYSIS SUMMARY OF PARRISH ROAD + SITE ACCESS #2 ......................................................... 35 TABLE 13: CAPACITY ANALYSIS SUMMARY OF PARRISH ROAD + SITE ACCESS #3 ......................................................... 36 PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 11 of 38 APPENDICES APPENDIX A: NCDOT TIA SCOPING CHECKLIST APPENDIX B: COUNT DATA APPENDIX C: STIP R-5705B PLANS APPENDIX D: CAPACITY ANALYSIS RESULTS – US 401 + CHALYBEATE SPRINGS ROAD APPENDIX E: CAPACITY ANALYSIS RESULTS – CHALYBEATE SPRINGS ROAD + LAFAYETTE ROAD APPENDIX F: CAPACITY ANALYSIS RESULTS – CHALYBEATE SPRINGS ROAD + PARRISH ROAD APPENDIX G: CAPACITY ANALYSIS RESULTS – CHALYBEATE SPRINGS ROAD + PURFOY ROAD APPENDIX H: CAPACITY ANALYSIS RESULTS – NC 55 BYPASS + CHALYBEATE SPRINGS ROAD APPENDIX I: CAPACITY ANALYSIS RESULTS – NC 55 BYPASS + NORTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD APPENDIX J: CAPACITY ANALYSIS RESULTS – NC 55 BYPASS + SOUTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD APPENDIX K: CAPACITY ANALYSIS RESULTS – PARRISH ROAD + SITE ACCESS #1 APPENDIX L: CAPACITY ANALYSIS RESULTS – PARRISH ROAD + SITE ACCESS #2 APPENDIX M: CAPACITY ANALYSIS RESULTS – PARRISH ROAD + SITE ACCESS #3 APPENDIX N: SIMTRAFFIC QUEUEING AND PERFORMANCE REPORTS APPENDIX O: MUTCD SIGNAL WARRANT ANALYSIS APPENDIX P: NCDOT TURN LANE WARRANTS PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 12 of 38 TRAFFIC IMPACT ANALYSIS PARRISH ROAD RESIDENTIAL Harnett County, North Carolina INTRODUCTION The proposed residential development will be located along Parrish Road, south of Chalybeate Springs Road, in Harnett County, North Carolina. Site access will be served via three (3) full movement driveways along Parrish Road with the northern and southernmost driveways aligned across Parrish Road. The purpose of this Traffic Impact Analysis (TIA) is to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to mitigate the impacts on the roadway network. The site is currently undeveloped and is expected to consist of the following land uses at full buildout: > 183 single family homes > 184 townhomes > 2,000 square feet (sq. ft.) retail space The proposed site is to be built-out by the year 2028. A NCDOT TIA Scoping Checklist (TIA Scoping Checklist) was submitted to North Carolina Department of Transportation (NCDOT) and Harnett County (County) staff for review of the TIA scope and assumptions. The TIA Scoping Checklist and approval correspondence is provided in Appendix A. Based on the approved scoping; the following intersections are included in this TIA study area: > US 401 and Chalybeate Springs Road > Chalybeate Springs Road and Lafayette Road > Chalybeate Springs Road and Parrish Road > Chalybeate Springs Road and Purfoy Road > Future NC 55 Bypass and Chalybeate Springs Road > Future NC 55 Bypass and Northern U-Turn Location at Chalybeate Springs Road > Future NC 55 Bypass and Southern U-Turn Location at Chalybeate Springs Road > Parrish Road and Site Access #1 (proposed) > Parrish Road and Site Access #2 (proposed) Refer to Figure 1 for a map of the study area. Figure 2 provides the most up to date preliminary site plan available at time of preparation of this study. To determine the traffic impacts of the proposed development, the following analysis scenarios are included in this study: > Existing (2024) Traffic Conditions > No-Build (2028) Traffic Conditions > Build (2028) Traffic Conditions LEGEND Study Intersection Site Access Site Location Parrish Road Residential Harnett County, NC Site Location Map Scale: Not to Scale Figure 1Chalybeate Springs Road401 401 SITE SITE BY ∙ PASS 55 BY ∙ PASS 55 Future NB U-Turn Location Future SB U-Turn Location PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 15 of 38 EXISTING CONDITIONS The proposed development is located in an area primarily consisting of residential development and undeveloped lane. Figure 3 provides a graphical representation of the existing lane configuration, storage capacity, traffic control type, and intersection spacing within the study area. Roadway characteristics within the study area is shown in Table 1. Average Annual Daily Traffic (AADT) data is provided based on the most recent count data provided by NCDOT. This AADT data provides the average Vehicles Per Day (vpd) for the subject facility based on typical operations. This AADT data is provided for informational purposes only and is not utilized for capacity analysis calculations within this study. TABLE 1: ROADWAY CHARACTERISTICS Road Name Route # Maintained By Typical Cross Section Speed Limit AADT (year of data) US 401 NCDOT 2-lane undivided 55 mph 11.000 vpd (2021) Chalybeate Springs Road SR 1441 NCDOT 2-lane undivided 45 mph 2,600 vpd (2021) Lafayette Road SR 1443 NCDOT 2-lane undivided 45 mph (assumed) 1,800 vpd (2022) Parrish Road SR 1442 NCDOT 2-lane undivided 45 mph (assumed) 20 vpd (2024)* Purfoy Road SR 1446 NCDOT 2-lane undivided 45 mph (assumed) 1,900 vpd (2022) *AADT determined based on Existing (2024) traffic volumes assuming that the weekday PM peak hour accounts for apprioxmately 10% of the daily traffic on the roadway. Existing peak hour turning movement counts were conducted in March 2024 during typical weekday AM (7:00 – 9:00 AM) and weekday PM (4:00 – 6:00 PM) peak hours. This data was collected at the following existing study intersections: > US 401 and Chalybeate Springs Road > Chalybeate Springs Road and Lafayette Road > Chalybeate Springs Road and Parrish Road > Chalybeate Springs Road and Purfoy Road Peak hour traffic volumes were determined from these traffic counts and balanced between study intersections, where appropriate. Traffic count data is provided in Appendix B. Refer to Figure 4 for the Existing (2023) peak hour traffic volumes. The Existing (2024) traffic volumes were analyzed utilizing the current lane configurations to determine existing operations for the study area. LEGEND Unsignalized Full Movement Intersection Storage Length (In Feet) Intersection Spacing Parrish Road Residential Harnett County, NC Existing Lane Configurations Scale: Not to Scale Figure 3 401Chalybeate Springs RoadChalybeate Springs RoadPurfoy Road Lafayette Road Parrish Road SPEEDLIMIT45 SPEEDLIMIT45 300'1.15mi2,625'Y' X' 4 3 2 1 LEGEND Unsignalized Full Movement Intersection Parrish Road ResidentialAM / PM Peak Hour Traffic Harnett County, NC Existing (2024) Peak Hour Traffic Volumes Scale: Not to Scale Figure 4 537 / 811 64 / 103 26 / 40 702 / 675113 / 7517 / 227 / 2086 / 12517 / 20 133 / 114 107 / 9369 / 145217 / 2382 / 14 / 0 1 / 1175 / 2370 / 052 / 130 2 / 9 125 / 9796 / 1414 / 3123 / 107401Chalybeate Springs RoadChalybeate Springs RoadPurfoy Road Lafayette Road Parrish Road XX / YY PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 18 of 38 NO-BUILD CONDITIONS In order to account for background growth in the study area prior to the proposed developments buildout year of 2028, the existing traffic count volumes were grown at a set growth rate. Per the approved TIA Scoping Checklist, the existing traffic counts were grown at a 3% annual growth rate to determine projected traffic volumes. Based on coordination with NCDOT and County staff during scoping, it was determined that there were no approved adjacent developments to be considered in this study however, it was determined that STIP R-5705B should be included as this project is expected to provide future improvements within the study area. STIP R-5705B is one of two segments of STIP R-5705 currently under construction with this section of the bypass expected to be completed in 2027. NCDOT State Transportation Improvement Program (STIP) project R-5705B involves construction NC 55 Bypass on new location from NC 210 to SR 4809 (Jicarilla Lane). As part of this project, a new reduced-conflict-intersection (RCI) is expected to be constructed along Chalybeate Springs Road, east of the proposed development. This intersection along with the associated northbound and southbound u-turn locations at Chalybeate Springs Road along the future NC 55 Bypass were analyzed under future traffic conditions based on the design plans provided by NCDOT. Future traffic volumes at these intersections are based on interpolation between base year 2016 traffic volumes – alternative B (scenario 3) and 2045 future year – alternative B without MTP projects (scenario 12) from the R-5705 Traffic Forecast was utilized to determine future traffic volumes at these intersections. Appendix D provides a full summary of the background improvements included in this analysis. Refer to Figure 5 for the No-Build (2028) traffic volumes. 4 3 2 1 LEGEND 5 / 3138 / 1202 / 10 141 / 109108 / 15959 / 146 197 / 2670 / 05 / 0 1 / 1 244 / 2682 / 1120 / 10578 / 163150 / 128 19 / 23 97 / 1418 / 2329 / 45 790 / 760127 / 8419 / 25604 / 913 72 / 116 Unsignalized Full Movement Intersection Parrish Road ResidentialAM / PM Peak Hour Traffic Harnett County, NC No-Build (2028) Peak Hour Traffic Volumes Scale: Not to Scale Figure 5 401Chalybeate Springs RoadChalybeate Springs RoadPurfoy Road Lafayette Road Parrish Road XX / YY PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 20 of 38 BUILD CONDITIONS The proposed development is expected to consist of a maximum of 183 single-family homes, 184 townhomes, and 2,000 square feet (sq. ft.) of retail space. Based on the Institute for Transportation Engineers (ITE) Trip Generation Manual, 11th Edition, and the suggested method of trip calculations provided in NCDOT’s Rate vs. Equation spreadsheet, trips for the proposed development were calculated for weekday daily, weekday AM peak hour, and weekday PM peak hour. A summary of this trip generation is provided in Table 2. TABLE 2: TRIP GENERATION Land Use (ITE Code) Density Calculation Methodology Daily Trips AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Single Family Homes (210) 183 Units Adjacent / Equation 1,759 32 94 129 110 65 175 Townhomes (215) 184 Units Adjacent / Equation 1,352 22 68 90 63 43 106 General Retail (822) 2 KSF Adjacent / Equation 314 6 4 10 12 13 25 TOTAL 3,425 60 169 229 185 121 306 Based on the existing traffic patterns, population centers surrounding the development, and engineering judgment the site trips were distributed according to the regional distributions listed as follows: > 20% to/from the north via US 401 > 10% to/from the south via US 401 > 25% to/from the north via Purfoy Road > 25% to/from the north via Future NC 55 Bypass > 10% to/from the south via Future NC 55 Bypass > 10% to/from the east via Chalybeate Springs Road Refer to Figure 6 for the detailed trip distribution percentages within the study area. The trip generation and distribution were approved by NCDOT and the County within the TIA Scoping Checklist provided in Appendix A. The trip distribution was applied to the trip generation to determine the trip assignment for the proposed development site trips at all study intersections. Refer to Figure 7 for the site trip assignment. To determine the future traffic volumes at the study intersections with buildout of the proposed site, the No-Build (2028) traffic volumes were added to the site trip assignment to determine Build (2028) traffic volumes. Refer to Figure 8 for the Build (2028) traffic volumes. 61 60 62 4 3 6 7 8 2 1 LEGEND Unsignalized Full Movement Intersection U-Turn Location Entering Trip Distribution Exiting Trip Distribution Regional Trip Distribution 10% Parrish Road Residential Harnett County, NC Site Trip Distribution Scale: Not to Scale Figure 6 20%(20%)(10%)30%(20%)(30%)30%(30%)20% 50% 30% 70% 20% 10% 20%(10%)(20%)70%(20%)(70%) (30%) (70%) (50%) 25%(25%)(45%)45%35% (35%)25%(45%)(10%) 10% (25%) (25%)10%(10%) 10%10% 401Chalybeate Springs RoadChalybeate Springs RoadBY ∙ PASS 55 Purfoy Road Lafayette Road 20% 25% 25% 10% XX% (YY%) ZZ% 10% 10% Parrish RoadSite Access #1Site Access #1Site Access #2Site Access #3Site Access #3SITE SITE 61 60 62 4 3 6 7 8 2 1 LEGEND AM / PM Site Trips Figure 7 Unsignalized Full Movement Intersection Parrish Road ResidentialU-Turn Location Harnett County, NC Site Trip Assignment Scale: Not to Scale 0 / 0 12 / 37 6 / 19 0 / 034 / 2417 / 120 / 018 / 560 / 0 0 / 051 / 360 / 06 / 19 12 / 37 34 / 240 / 00 / 042 / 130 12 / 37 0 / 00 / 00 / 030 / 93 33 / 250 / 018 / 56 0 / 018 / 5612 / 36 17 / 1251 / 36 0 / 0 0 / 0 0 / 0 118 / 85 118 / 85 85 / 60 0 / 0 0 / 00 / 0 51 / 360 / 00 / 00 / 0 0 / 042 / 12934 / 240 / 015 / 46 0 / 0 42 / 3176 / 540 / 027 / 8317 / 12 59 / 42 21 / 65 0 / 0 15 / 46 0 / 0 76 / 546 / 186 / 19 6 / 18 42 / 30 42 / 30 6 / 1917 / 12 401Chalybeate Springs RoadChalybeate Springs RoadBY ∙ PASS 55 Purfoy Road Lafayette Road Parrish RoadSite Access #1Site Access #1Site Access #2Site Access #3Site Access #3SITE SITE XX / YY 61 60 62 4 3 6 7 8 2 1 LEGEND 987 / 676 971 / 658 91 / 122103 / 81 1011 / 62475 / 104 131 / 96 656 / 998 16 / 17 268 / 285125 / 180 590 / 905 664 / 979 194 / 211 5 / 3165 / 2032 / 10 183 / 140184 / 21374 / 192 51 / 360 / 00 / 00 / 0 197 / 26742 / 12934 / 240 / 052 / 37 0 / 0 0 / 0 0 / 0 123 / 85 124 / 86 91 / 61 6 / 1 0 / 00 / 0 0 / 032 / 94 33 / 250 / 018 / 56 244 / 26820 / 5712 / 36 17 / 126 / 19 12 / 37 34 / 240 / 00 / 044 / 131 12 / 37 2 / 10 / 0171 / 14178 / 163150 / 128 19 / 23 115 / 1978 / 2335 / 64 790 / 760161 / 10836 / 37604 / 913 84 / 153 Unsignalized Full Movement Intersection Parrish Road ResidentialU-Turn Location Harnett County, NC Build (2028) Peak Hour Traffic Volumes Scale: Not to Scale Figure 8 AM / PM Peak Hour Traffic 401Chalybeate Springs RoadChalybeate Springs RoadBY ∙ PASS 55 Purfoy Road Lafayette Road Parrish RoadSite Access #1Site Access #1Site Access #2Site Access #3Site Access #3SITE SITE XX / YY PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 24 of 38 CAPACITY ANALYSIS The intersections and analysis scenarios included in this study were analyzed to determine the potential impact by the proposed development and to recommend improvements to mitigate any potential impacts. The capacity analysis reviews the level of service (LOS), delay, and vehicle queues expected under each analysis scenario utilizing the methodology contained in the Highway Capacity Manual (HCM), 6th Edition, published by the Transportation Research Board. LOS is a qualitative measurement of traffic operations based on the average total vehicle delay of the movement, approach, or intersection. The HCM includes six levels of service, ranging from level “A” (free flow conditions) to level “F” (where over-saturated conditions are evident). Table 3, provides a summary of the thresholds for each LOS under both unsignalized (stop-control) and signalized operations. TABLE 3: HIGHWAY CAPACITY MANUAL – LEVELS OF SERVICE + DELAY CRITERIA Level of Service (LOS) Unsignalized Signalized Average Control Delay (Seconds per vehicle) Average Control Delay (Seconds per vehicle) A ≤ 10 ≤ 10 B > 10 and ≤ 15 > 10 and ≤ 20 C > 15 and ≤ 25 > 20 and ≤ 35 D > 25 and ≤ 35 > 35 and ≤ 55 E > 35 and ≤ 50 > 55 and ≤ 80 F > 50 > 80 A computer software package, Synchro (version 11.1), was utilized for the analysis of operations within this study. Within this software package, SimTraffic was also used to review queue lengths and the operations of intersections within the context of location and spacing in the study area. The capacity analysis summary table for each study intersection provides the delay and LOS for each approach and overall intersection, when appropriate. More detailed queues and delay information is provided in the appendix. Per the NCDOT Congestion Management Capacity Analysis Guidelines, several assumptions were applied to the full study. A summary of these assumptions is provided below: > A Peak Hour Factor (PHF) of 0.90 was used for all analysis scenarios and intersections. > A heavy vehicle percentage of 2% was applied to all analysis scenarios and intersections. > For allowable movements with volumes less than four (4), a volume of four (4) was applied in the capacity analysis. In order to present accurate information within the traffic volume figures, this was not applied to those conditions. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 25 of 38 US 401 + CHALYBEATE SPRINGS ROAD The intersection of US 401 and Chalybeate Springs Road is currently an unsignalized, three-leg intersection. This intersection was analyzed under Existing (2024), No-Build (2028), and Build (2028) conditions. Table 4 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix D for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 4: CAPACITY ANALYSIS SUMMARY OF US 401 + CHALYBEATE SPRINGS ROAD Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) Existing (2024) WB2 NB SB1 1 LT-RT 1 TH-RT 1 LT-TH D (29) -- A (10) N/A F (61) -- B (10) N/A No-Build (2028) WB2 NB SB1 1 LT-RT 1 TH-RT 1 LT-TH E (47) -- B (10) N/A F (194) -- B (11) N/A Build (2028) WB2 NB SB1 1 LT-RT 1 TH-RT 1 LT-TH F (129) -- B (11) N/A F (676) -- B (11) N/A Build (2028) – Improved (Signalization) WB NB SB 1 LT-RT 1 TH-RT 1 LT, 1 TH D (50) C (29) B (15) C (26) E (57) C (34) B (17) C (27) Improvements recommended by the Developer are shown in bold. 1. Level of service for major-street left-turn movement. 2. Level of service for minor-street approach. Capacity analysis of Existing (2024) and No-Build (2028) conditions indicates that the major-street left-turn movement at the intersection of US 401 and Chalybeate Springs Road is expected to operate at LOS B or better during the weekday AM and PM peak hours while the minor-street approach is expected to operate at LOS D/E during the weekday AM peak hour and at LOS F during the weekday PM peak hour. With the addition of site trips from the proposed development under Build (2028) conditions, the major-street left-turn movement is expected to operate at LOS B while the minor-street approach is expected to operate at LOS F during both the weekday AM and PM peak hours. The LOS are not uncommon for stop-controlled minor-street approaches at intersections with heavy mainline traffic volumes. Due to the poor operations expected for the minor-street approach in the future and upon buildout of the proposed development, the potential need for signalization was evaluated based on the methodology in the Manual on Uniform Traffic Control Devices (MUTCD). Weekday AM and PM peak hour volumes from Build (2028) traffic conditions were utilized to evaluate the peak hour (warrant 3) warrant. Based on the results of this warrant, this intersection is expected to satisfy the peak hour warrant during both the weekday AM and PM peak hour. Along with signalization, installation of an exclusive southbound left-turn lane was considered to improve operations of this intersection and alleviate queueing issues on the southbound approach. With these improvements, this intersection is expected to operate at an overall LOS C during the weekday AM and PM peak hours upon buildout of the proposed development. It is recommended that this intersection be monitored for signalization by the proposed development and installed once warranted and approved by NCDOT. It should be noted that the proposed development does not immediately trigger the need for signalization and installation of this intersection should be PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 26 of 38 phased to an interim buildout of the development, based on future coordination with NCDOT. Construction of the exclusive southbound left-turn lane is recommended at the same time as signalization to eliminate potential extended construction at the intersection. Refer to Appendix O for a copy of the MUTCD Signal Warrant Analysis Results. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 27 of 38 CHALYBEATE SPRINGS ROAD + LAYFAYETTE ROAD The intersection of Chalybeate Springs Road and Lafayette Road is currently an unsignalized, three-leg intersection. This intersection was analyzed under Existing (2024), No-Build (2028), and Build (2028) conditions. Table 5 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix E for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 5: CAPACITY ANALYSIS SUMMARY OF CHALYBEATE SPRINGS ROAD + LAFAYETTE ROAD Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) Existing (2024) EB WB1 NB2 1 TH-RT 1 LT-TH 1 LT-RT -- A (8) A (10) N/A -- A (8) B (11) N/A No-Build (2028) EB WB1 NB2 1 TH-RT 1 LT-TH 1 LT-RT -- A (8) B (10) N/A -- A (8) B (11) N/A Build (2028) EB WB1 NB2 1 TH-RT 1 LT-TH 1 LT-RT -- A (8) B (11) N/A -- A (8) B (12) N/A 1. Level of service for major-street left-turn movement. 2. Level of service for minor-street approach. Capacity analysis of Existing (2024), No-Build (2028), and Build (2028) conditions indicates that both the major-street left-turn movement and minor-street approach at the intersection of Chalybeate Springs Road and Lafayette Road are expected to operate at LOS B or better during the weekday AM and PM peak hours. The proposed development is expected to account for approximately one (1) second of additional delay to the minor- street approach of Lafayette Road during the weekday AM and PM peak hours upon buildout of the proposed development. Due to the minor impacts of the addition of development site trips at this intersection and the expected acceptable future operations, no improvements are recommended. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 28 of 38 CHALYBEATE SPRINGS ROAD + PARRISH ROAD The intersection of Chalybeate Springs Road and Parrish Road is currently an unsignalized, three-leg intersection. This intersection was analyzed under Existing (2024), No-Build (2028), and Build (2028) conditions. Table 6 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix F for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 6: CAPACITY ANALYSIS SUMMARY OF CHALYBEATE SPRINGS ROAD + PARRISH ROAD Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) Existing (2024) EB WB1 NB2 1 TH-RT 1 LT-TH 1 LT-RT -- A (8) B (11) N/A -- A (8) B (11) N/A No-Build (2028) EB WB1 NB2 1 TH-RT 1 LT-TH 1 LT-RT -- A (8) B (11) N/A -- A (8) B (12) N/A Build (2028) EB WB1 NB2 1 TH-RT 1 LT-TH 1 LT-RT -- A (8) B (13) N/A -- A (8) C (16) N/A 1. Level of service for major-street left-turn movement. 2. Level of service for minor-street approach. Capacity analysis of Existing (2024), No-Build (2028), and Build (2028) conditions indicates that both the major-street left-turn movement and minor-street approach at the intersection of Chalybeate Springs Road and Parrish Road are expected to operate at LOS C or better during the weekday AM and PM peak hours. The proposed development is expected to account for approximately two (2) seconds of additional delay to the minor- street approach of Parrish Road during the weekday AM peak hour and four (4) seconds of additional delay during the PM peak hour upon buildout of the proposed development. Based on a review of maximum queue lengths as reported from SimTraffic simulations, queues for the major-street westbound left-turn movement at this intersection are not expected to exceed 74 feet (approximately 3 vehicles) during the weekday AM and PM peak hours upon buildout of the proposed development in 2028. Queues for the northbound minor-street approach are also not expected to exceed 90 feet (approximately 4 vehicles) during the weekday AM and PM peak hours upon buildout of the proposed development. Due to the acceptable levels-of-service, minor impacts to delay, minor queue lengths, and lack of development frontage at this intersection, no improvements are recommended by the proposed development at this intersection. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 29 of 38 CHALYBEATE SPRINGS ROAD + PURFOY ROAD The intersection of Chalybeate Springs Road and Purfoy Road is currently an unsignalized, three-leg intersection. This intersection was analyzed under Existing (2024), No-Build (2028), and Build (2028) conditions. Table 7 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix G for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 7: CAPACITY ANALYSIS SUMMARY OF CHALYBEATE SPRINGS ROAD + PURFOY ROAD Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) Existing (2024) EB1 WB SB2 1 LT-TH 1 TH-RT 1 LT-RT A (8) -- A (10) N/A A (8) -- B (10) N/A No-Build (2028) EB1 WB SB2 1 LT-TH 1 TH-RT 1 LT-RT A (8) -- A (10) N/A A (8) -- B (10) N/A Build (2028) EB1 WB SB2 1 LT-TH 1 TH-RT 1 LT-RT A (8) -- B (10) N/A A (8) -- B (12) N/A 1. Level of service for major-street left-turn movement. 2. Level of service for minor-street approach. Capacity analysis of Existing (2024), No-Build (2028), and Build (2028) conditions indicates that both the major-street left-turn movement and minor-street approach at the intersection of Purfoy Road and Parrish Road are expected to operate at LOS C or better during the weekday AM and PM peak hours. The proposed development is expected to account for a negligible increase in delay during the weekday AM peak hour and for approximately two (2) seconds of additional delay to the minor-street approach of Purfoy Road during the weekday PM peak hour upon buildout of the proposed development. Due to the minor impacts of the addition of development site trips at this intersection and the expected acceptable future operations, no improvements are recommended. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 30 of 38 NC 55 BYPASS + CHALYBEATE SPRINGS ROAD The future intersection of NC 55 Bypass and Chalybeate Springs Road is expected to operate as an unsignalized, four- leg reduced conflict intersection (RCI). This intersection was analyzed under No-Build (2028) and Build (2028) conditions. Table 8 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix H for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 8: CAPACITY ANALYSIS SUMMARY OF NC 55 BYPASS + CHALYBEATE SPRINGS ROAD Conditions N O D E A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) No-Build (2028) 51 WB2 NB SB*1 1 RT 1 TH, 1 RT 1 LT B (15) -- C (24) N/A B (12) -- C (17) N/A 52 EB2 NB**1 SB 1 RT 1 LT 1 TH, 1 RT B (13) C (24) -- N/A C (19) E (36) -- N/A Build (2028) 51 WB2 NB SB*1 1 RT 1 TH, 1 RT 1 LT C (15) -- D (26) N/A B (13) -- C (18) N/A 52 EB2 NB**1 SB 1 RT 1 LT 1 TH, 1 RT B (15) D (25) -- N/A C (23) E (50) -- N/A 1. Level of service for major-street left-turn movement. 2. Level of service for minor-street approach. *Note: Due to limitations with Synchro analysis software, the southbound left-turn movement was modeled as the eastbound approach at this intersection. **Note: Due to limitations with Synchro analysis software, the northbound left-turn movement was modeled as the westbound approach at this intersection. Capacity analysis of No-Build (2028) and Build (2028) traffic conditions indicate that the major-street left-turn movement and minor-street approaches at the future intersection of NC 55 Bypass and Chalybeate Springs Road are expected to operate at LOS D or better during the weekday AM and PM peak hours, with the exception of the northbound left-turn movement during the weekday PM peak hour (LOS E) under No-Build (2028) and Build (2028) conditions. The proposed development is expected to account for less than 10% of the total volume at this intersection upon buildout of the proposed development. Based on a review of maximum queue lengths as reported from SimTraffic simulations, queues for both the major-street northbound and southbound movements on NC 55 Bypass are not expected to exceed 83 feet (approximately 3 vehicles) during the weekday AM and PM peak hours and as such are expected to be accommodated by the expected future storage lengths for these movements constructed as part of STIP R-5705B. Queues for the minor-street approaches on Chalybeate Springs Road are not expected to exceed 266 feet (approximately 10 vehicles) during the weekday AM or PM peak hours upon buildout of the proposed development. It should be noted that these reported queue lengths are assumed to be conservative as upstream signalized intersections along the future NC 55 Bypass were not modeled, which would be expected to meter traffic along NC 55 Bypass to allow for gaps to service minor-street traffic at unsignalized intersections along the corridor. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 31 of 38 Due to the minor impacts of the addition of development site trips at this intersection and the expected acceptable future operations, no improvements are recommended. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 32 of 38 NC 55 BYPASS + NORTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD The future intersection of NC 55 Bypass and the Northbound U-Turn Location at Chalybeate Springs Road is expected to operate as an unsignalized intersection with no minor-street approach. This intersection was analyzed under No- Build (2028) and Build (2028) conditions. Table 9 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix I for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 9: CAPACITY ANALYSIS SUMMARY OF NC 55 BYPASS + NORTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) No-Build (2028) NB*1 SB 1 UT 2 TH B (12) -- N/A B (14) -- N/A Build (2028) NB*1 SB 1 UT 2 TH B (12) -- N/A C (15) -- N/A 1. Level of service for major-street u-turn movement. *Note: Due to limitations with Synchro analysis software, the northbound u-turn movement was modeled as the westbound approach at this intersection. Capacity analysis of No-Build (2028) and Build (2028) traffic conditions indicate that the major-street u-turn movement at the intersection of NC 55 Bypass and Northbound U-Turn Location and Chalybeate Springs Road is expected to operate at an overall LOS C or better during the weekday AM and PM peak hours. The proposed development is expected to account for less than 6% of the overall total traffic volume at this intersection upon build of the development and the addition of site trips from the development at this intersection is expected to account for a negligible increase in delay during the weekday AM peak hour and approximately one (1) second of additional delay during the weekday PM peak hour. Due to the minor impacts of the addition of development site trips at this intersection and the expected acceptable future operations, no improvements are recommended. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 33 of 38 NC 55 BYPASS + SOUTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD The future intersection of NC 55 Bypass and the Southbound U-Turn Location at Chalybeate Springs Road is expected to operate as an unsignalized intersection with no minor-street approach. This intersection was analyzed under No- Build (2028) and Build (2028) conditions. Table 10 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix J for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 10: CAPACITY ANALYSIS SUMMARY OF NC 55 BYPASS + SOUTHBOUND U-TURN LOCATION AT CHALYBEATE SPRINGS ROAD Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) No-Build (2028) NB SB*1 2 TH 1 UT -- C (17) N/A -- B (13) N/A Build (2028) NB SB*1 2 TH 1 UT -- C (20) N/A -- B (14) N/A 1. Level of service for major-street u-turn movement. *Note: Due to limitations with Synchro analysis software, the southbound u-turn movement was modeled as the westbound approach at this intersection. Capacity analysis of No-Build (2028) and Build (2028) traffic conditions indicate that the major-street u-turn movement at the intersection of NC 55 Bypass and Southbound U-Turn Location and Chalybeate Springs Road is expected to operate at an overall LOS C or better during the weekday AM and PM peak hours. The proposed development is expected to account for less than 8% of the overall total traffic volume at this intersection upon build of the development and the addition of site trips from the development at this intersection is expected to account for approximately three (3) seconds of additional delay during the weekday AM peak hour and one (1) second of additional delay during the weekday PM peak hour. Due to the minor impacts of the addition of development site trips at this intersection and the expected acceptable future operations, no improvements are recommended. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 34 of 38 PARRISH ROAD + SITE ACCESS #1 The future intersection of Parrish Road and Site Access #1 is expected to operate as an unsignalized, four-leg intersection. This intersection was analyzed under Build (2028) conditions. Based on review of the capacity analysis and NCDOT Driveway Manual guidelines for left and right-turn lanes at site driveways the following improvements are recommended to be constructed by the developer. > Construct Site Access #1 as the eastbound and westbound approaches with one (1) ingress and one (1) egress lane each, respectively. > Provide stop-control for the eastbound and westbound approaches. Table 11 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix K for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 11: CAPACITY ANALYSIS SUMMARY OF PARRISH ROAD + SITE ACCESS #1 Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) Build (2028) EB2 WB2 NB1 SB1 1 LT-TH-RT 1 LT-TH-RT 1 LT-TH-RT 1 LT-TH-RT B (10) A (10) A (7) A (8) N/A B (11) A (10) A (8) A (8) N/A Improvements recommended by the Developer are shown in bold. 1. Level of service for major-street left-turn movement. 2. Level of service for minor-street approach. Capacity analysis of Build (2028) traffic conditions indicates that both the major-street left-turn movements and minor-street approaches at the proposed intersection of Parrish Road and Site Access #1 are expected to operate at LOS B or better during the weekday AM and PM peak hours. Exclusive left and right-turn lanes were considered at this intersection based on the methodology outlined in the Policy on Street and Driveway Access to North Carolina Highways (published by the NCDOT). Based on the findings from the turn lane warrant analysis, exclusive turn lanes on either the northbound or southbound approaches are not expected to be warranted. Additionally, future traffic volumes along Parrish Road are expected to fall below the 4,000 vehicles per day (vpd) threshold for consideration of exclusive turn lanes as Parrish Road is a dead-end street with a majority of future traffic volumes expected from the proposed development. For this reason, exclusive turn lanes are not recommended along Parrish Road at this driveway. Refer to Appendix P for a copy of the turn lane warrants at this intersection. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 35 of 38 PARRISH ROAD + SITE ACCESS #2 The future intersection of Parrish Road and Site Access #2 is expected to operate as an unsignalized, four-leg intersection. This intersection was analyzed under Build (2028) conditions. Based on review of the capacity analysis and NCDOT Driveway Manual guidelines for left and right-turn lanes at site driveways the following improvements are recommended to be constructed by the developer. > Construct Site Access #2 as the eastbound approach with one (1) ingress and one (1) egress lane. > Provide stop-control for the eastbound approach. Table 12 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix L for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 12: CAPACITY ANALYSIS SUMMARY OF PARRISH ROAD + SITE ACCESS #2 Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) Build (2028) EB2 NB1 SB 1 LT-RT 1 LT-TH 1 TH-RT A (9) A (7) -- N/A A (10) A (8) -- N/A Improvements recommended by the Developer are shown in bold. 1. Level of service for major-street left-turn movement. 2. Level of service for minor-street approach. Capacity analysis of Build (2028) traffic conditions indicates that the major-street left-turn movement and minor- street approach at the proposed intersection of Parrish Road and Site Access #2 are expected to operate at LOS A during the weekday AM and PM peak hours. Exclusive left and right-turn lanes were considered at this intersection based on the methodology outlined in the Policy on Street and Driveway Access to North Carolina Highways (published by the NCDOT). Based on the findings from the turn lane warrant analysis, exclusive turn lanes on either the northbound or southbound approaches are not expected to be warranted. Additionally, future traffic volumes along Parrish Road are expected to fall below the 4,000 vehicles per day (vpd) threshold for consideration of exclusive turn lanes as Parrish Road is a dead-end street with a majority of future traffic volumes expected from the proposed development. For this reason, exclusive turn lanes are not recommended along Parrish Road at this driveway. Refer to Appendix P for a copy of the turn lane warrants at this intersection. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 36 of 38 PARRISH ROAD + SITE ACCESS #3 The future intersection of Parrish Road and Site Access #3 is expected to operate as an unsignalized, four-leg intersection. This intersection was analyzed under Build (2028) conditions. Based on review of the capacity analysis and NCDOT Driveway Manual guidelines for left and right-turn lanes at site driveways the following improvements are recommended to be constructed by the developer. > Construct Site Access #3 as the eastbound and westbound approaches with one (1) ingress and one (1) egress lane each, respectively. > Provide stop-control for the eastbound and westbound approaches. Table 13 provides the capacity analysis for the subject intersection with the lane configurations and traffic control shown in the table. Refer to Appendix M for the Synchro capacity analysis reports. Copies of the SimTraffic queueing and performance reports can be found in Appendix N. TABLE 13: CAPACITY ANALYSIS SUMMARY OF PARRISH ROAD + SITE ACCESS #3 Conditions A P P R O A C H Lane Configurations Weekday AM Peak Hour Weekday PM Peak Hour LOS and Approach Delay (seconds) Overall Delay (seconds) LOS and Approach Delay (seconds) Overall Delay (seconds) Build (2028) EB2 WB2 NB1 SB1 1 LT-TH-RT 1 LT-TH-RT 1 LT-TH-RT 1 LT-TH-RT A (10) A (9) A (7) A (7) N/A B (10) A (9) A (7) A (7) N/A Improvements recommended by the Developer are shown in bold. 1. Level of service for major-street left-turn movement. 2. Level of service for minor-street approach. Capacity analysis of Build (2028) traffic conditions indicates that both the major-street left-turn movements and minor-street approaches at the proposed intersection of Parrish Road and Site Access #3 are expected to operate at LOS B or better during the weekday AM and PM peak hours. Exclusive left and right-turn lanes were considered at this intersection based on the methodology outlined in the Policy on Street and Driveway Access to North Carolina Highways (published by the NCDOT). Based on the findings from the turn lane warrant analysis, exclusive turn lanes on either the northbound or southbound approaches are not expected to be warranted. Additionally, future traffic volumes along Parrish Road are expected to fall below the 4,000 vehicles per day (vpd) threshold for consideration of exclusive turn lanes as Parrish Road is a dead-end street with a majority of future traffic volumes expected from the proposed development. For this reason, exclusive turn lanes are not recommended along Parrish Road at this driveway. Refer to Appendix P for a copy of the turn lane warrants at this intersection. PARRISH ROAD RESIDENTIAL > TRAFFIC IMPACT ANALYSIS 37 of 38 CONCLUSION / RECOMMENDATIONS The purpose of this Traffic Impact Analysis is to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to mitigate the impacts on the roadway network. The proposed residential development will be located along Parrish Road, south of Chalybeate Springs Road, in Harnett County, North Carolina. Site access will be served via three (3) full movement driveways along Parrish Road with the northern and southernmost driveways aligned across Parrish Road. The site is currently undeveloped and is expected to consist of a maximum of 183 single family homes, 184 townhomes, and 2,000 square feet (sq. ft.) of retail space. The proposed site is expected to be built-out by the year 2028. Based on the approved scoping, the following intersections were included in this TIA study area: > US 401 and Chalybeate Springs Road > Chalybeate Springs Road and Lafayette Road > Chalybeate Springs Road and Parrish Road > Chalybeate Springs Road and Purfoy Road > Future NC 55 Bypass and Chalybeate Springs Road > Future NC 55 Bypass and Northern U-Turn Location at Chalybeate Springs Road > Future NC 55 Bypass and Southern U-Turn Location at Chalybeate Springs Road > Parrish Road and Site Access #1 (Proposed) > Parrish Road and Site Access #2 (Proposed) Capacity analysis was conducted at all study intersections according to NCDOT guidelines utilizing the methodology contained in the Highway Capacity Manual (HCM), 6th Edition, published by the Transportation Research Board. Based on review of background information provided by NCDOT and the County, the following improvements have been identified or are recommended to accommodate future traffic conditions. Figure 9, provides a graphical representation of recommended improvements at the study intersections. Recommended Improvements by Developer US 401 and Parrish Road > Monitor intersection for signalization and install once warranted and approved by NCDOT. > Construct an exclusive southbound left-turn lane with a minimum of 100 feet of full width storage and appropriate deceleration and taper. Parrish Road and Site Access #1 > Construct Site Access #1 as the eastbound and westbound approaches with one (1) ingress and one (1) egress lane each, respectively. > Provide stop-control for the eastbound and westbound approaches. Parrish Road and Site Access #2 > Construct Site Access #2 as the eastbound approach with one (1) ingress and one (1) egress lane. > Provide stop-control for the eastbound approach. Parrish Road and Site Access #3 > Construct Site Access #2 as the eastbound and westbound approaches with one (1) ingress and one (1) egress lane each, respectively. > Provide stop-control for the eastbound and westbound approaches. 62 LEGEND 700' 775' 675' 800' 100' Parrish Road Residential U-Turn Location Harnett County, NC Recommended Lane Configurations Scale: Not to Scale Figure 9 Improvement by Developer Storage Length (In Feet) 850' Existing Lane Improvement by STIP R-5705B Developer Monitor for Signal Unsignalized Full Movement Intersection 401Chalybeate Springs RoadChalybeate Springs RoadBY ∙ PASS 55 Purfoy Road Lafayette Road Parrish RoadSite Access #1Site Access #1Site Access #2Site Access #3Site Access #3SITE SITE X'