Loading...
HomeMy WebLinkAboutSR AddendumSpecial Nonresidential Intensity Allocation • 10/70 Rule - 10% of the protected watershed may be developed to a maximum of 70% for Non residential developments. • Per NCDENR DWQ, the Watershed Administrator is allowed to approve the SIA’s. WS-IV Classification Protected Area 58,821 acres Critical Area 267 acres (NCDENR reviews stormwater plans) Lillington (minus their area) 2,560 acres Total 56,528 acres Ten percent of the WS-IV protected area comes to 5,652.8 acres Project Percent of Impervious Surface Total acres of Impervious Surface Total acres Date approved 10% Protected Area 5,652.8 acres Pleasant Union Christian Church 44% 1.8 ac 4.09 ac 07/30/03 5,651 remaining NorthWest Harnett VFD 39.6% 1.524 ac 3.85 ac 05/13/04 5,649.48 Keith Hills West Townhomes 56.56% 1.81ac 3.2 ac 04/04/06 5,647.67 Dollar General @ Bunnlevel 45% .72 ac 1.59 ac 6/22/11 5,646.95 Brightwater Technology Park (38.74 ac reserved) 70% 90.38 129.12 ac 6/30/11 5,556.57 Brick Mill Square 61.51% 5.34 ac 9.36 ac Under review 5,221.23 Campbell Village Townhomes 56.8% .83 ac 1.46 ac 11/13/12 5,220.40 Townes at Hartwell 58% .95 ac 1.64 3/11/12 5,219.45 SHC Apartments 50.7% .75 ac 1.49 7/8/13 5,218.70 Townhomes on Main 55% .24 .44 3/10/14 5,218.46 Stancil/Bradley Built Towns 43% 2.3 5.3 4/14/14 5,216.16 Project Percent of Impervious Surface Total acres of Impervious Surface Total acres Date approved 10% Protected Area 5,652.8 acres Rick Gilchrist Co., INC Jarco Ind. Site 69.7% 2.80 4.00 NA Project not started 5,216.16 remaining Campbell Pointe Townhomes 45.1% 6.55 14.53 5/11/15 5,209.81 Remaining JAKS Development Group – Brickyard Landing 44.1% 0.48 1.107 Approved 07/11/16 5,213.33 Remaining Campbell Pointe Townhomes Project #2 48% 6.96 14.51 Approved 5,203.37 Remaining Meredith Square Appt. Expansion 42% 2.98 7.1 Approved 8/13/18 5,200.39 Remaining Buttonwoods, LLC Concrete Plant 66.9% 3.9 5.83 Approved 10/8/18 5,196.49 Remaining GAP Properties, LLC 65% 2.6 4.00 Approved 2/11/19 5,193.89 Remaining Jim Moore Storage Facility 69% 1.71 2.4 Approved 3/14/19 Remaining 5,192.18 Gardner Storage Facility 50% 2.5 5.0 Approved Date 9/9/19 Remaining 5,189.68 Medlin Storage Facility 62.5% 3.71 5.72 Disapproved Date 9/9/19 Remaining 5,189.68 Farthing Industrial Site Jarco 54% 1.49 2.74 Approved 2-10-2020 Remaining 5188.19 Larue Powell Storage 55.7% 4.71 8.46 Approved 7-13-2020 Remaining 5,183.48 Natural Stone & Design - Jarco 60% 1.2 2.00 Approved 8-10-2020 Remaining 5,182.28 Project Percent of Impervious Surface Total acres of Impervious Surface Total acres Date approved 10% Protected Area 5,652.8 acres E&M Concrete - Jarco 65% 1.36 2.09 5-10-21 5,180.92 421 Dollar General 43% .83 1.97 Hearing Date – 12- 13-21 Proposed Remaining – 5,180.09