HomeMy WebLinkAbout48763.000C-SITE_LAYOUT-2 - rotated - SWR and WATER EXHIBIT 4.0-EX4.0 - SSWR AND WATER EXHIBITFM FM
FMFM FM
PROPOSED FORCE MAIN
TO BE EXTENDED TO
EXISTING GRAVITY SEWER
WITH A BORE AND JACK
UNDER ROAD8'' W8'' W8'' W8'' W8'' W16'' W16'' W16'' W16'' W16'' WAPPROXIMATE
LOCATION OF
EXISTING 16"
RAW WATER
LINE
APPROXIMATE
LOCATION OF
EXISTING 8"
WATER LINEFORT BRAGG
PROPERTY LINE IN RED
US HWY 24-87PROPERTY LINE IN RED
PROPERTY / LAYOUT DATA
REQUIRED PARKING: 1 SPACE / 4 SEATS + 1 / 2 EMPLOYEES =
FORT BRAGG
PLAN REVIEW NOTES
13
10' SIDE LANDSCAPE BUFFER
20'
9'
PROPOSED
SCM
21
10
9
5
9'
19'
14'
24'
24'
24'
R10'
R5'
R25'
R30'
R30'
PROPOSED
RIGHT-IN, RIGHT-OUT
PYLON SIGN
EXISTING BILLBOARD
EXISITING
SIGNALIZED
INTERSECTION
PROPOSED CROSS
ACCESS DRIVEWAY PROPOSED CROSS
ACCESS DRIVEWAY
PROPOSED CROSS
ACCESS DRIVEWAY
PROPOSED LEFT-IN
DRIVEWAY
24'
10' SIDE LANDSCAPE BUFFER
15' LANDSCAPE BUFFER
COOKOUT
3,800 SF
100'
410.21'
12'
24'
50' BUILDING SETBACK
12'
14'
OUTPARCEL
PYLON SIGN
38'
5'
14'
14'
10'245.63'60.69'87.04'100.72'397.72'
10' REAR LANDSCAPE BUFFER
R10'
POPEYES
2,531 SF
(2124 PROTOTYPE)
PROPOSED PRIVATE
LIFT STATION
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BYDATEDRAWN BY
DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.5410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE06/23/2021
POPEYES - HWY 24 SPOUT SPRINGS NCHARNETT COUNTY, NORTH CAROLINA48763.001
AS SHOWN
EX 1.0 FORCEMAIN EXHIBIT 1.0J. SHEARER
B. DOWNS
B. DOWNS
PRELIMINARY - NOT RELEASED
FOR CONSTRUCTION
PROPERTY / LAYOUT DATA
ADDRESS: 0 NC 24-87, CAMERON, NC
CURRENT USE = VACANT
JURISDICTION = HARNETT COUNTY
PARCEL ID = 9585-50-1195.000
CURRENT ZONING = COMM
PROPOSED ZONING = COMM
REQUIRED PARKING: 1 SPACE / 4 SEATS + 1 / 2 EMPLOYEES =
25 SPACES
POPEYES PARKING = 28 SPACES
SCALE 1"=50'
100'50'0
PLAN REVIEW NOTES
1.EXISTING CONDITIONS BASED ON DATA OBTAINED FROM NC ONE MAP AND
HARNETT COUNTY GIS ON 06/14/2021.
2.THIS CONCEPT SITE PLAN DOES NOT GUARANTEE ALL REQUIREMENTS
FROM ZONING ISSUES, NOR SIGNAGE, STORM DRAINAGE, GRADING,
UTILITIES, EASEMENTS, AND THE LIKE ARE PROPERLY ADDRESSED AT THIS
TIME. THE ABOVE REQUIREMENTS CAN AFFECT THE SITE LAYOUT.
3.ALL REQUIREMENTS ASSUMED WITH THIS LAYOUT ARE TENTATIVE AND
SUBJECT TO CHANGE AS MAY BE DIRECTED BY THE CLIENT, ARCHITECT,
JOINT DEVELOPER, OR ANY OF THE GOVERNMENTAL PERMITTING
AGENCIES. TIMMONS GROUP HAS DONE THE BEST WE CAN GIVEN THE
PRELIMINARY NATURE OF THIS WORK. ONLY AFTER A THOROUGH ALTA AND
TOPOGRAPHIC SURVEY ARE PERFORMED, AND THE REQUIRED REVIEW
PROCESSES ARE COMPLETE, CAN MORE ASSURANCE BE GIVEN TO THIS
PLAN AS IT RELATES TO MOVING FORWARD.
GENERAL COMMENTS
ADVANTAGES:
·ACCESS TO SIGNALIZED SUPER STREET TURNAROUND
·MILITARY COMMUTER TRAFFIC
·OUTPARCEL AVAILABLE
DISADVANTAGES:
·WOODED ADJACENT LOT: POSSIBLY DECREASED VISIBILITY
·UTILITY MAIN EXTENSIONS REQUIRED
·ADJACENT BILLBOARD: POSSIBLY DECREASED VISIBILITY
·SUBDIVISION REQUIRED
EXISTING PARCEL ACREAGE = 2.28 AC
PROPOSED PARCEL ACREAGE = 1 AC
OUTPARCEL PARCEL ACREAGE = 1.28 AC
OUTPARCEL PARKING = 30 SPACES