Loading...
HomeMy WebLinkAbout48763.000C-SITE_LAYOUT-2 - rotated - SWR and WATER EXHIBIT 4.0-EX4.0 - SSWR AND WATER EXHIBITFM FM FMFM FM PROPOSED FORCE MAIN TO BE EXTENDED TO EXISTING GRAVITY SEWER WITH A BORE AND JACK UNDER ROAD8'' W8'' W8'' W8'' W8'' W16'' W16'' W16'' W16'' W16'' WAPPROXIMATE LOCATION OF EXISTING 16" RAW WATER LINE APPROXIMATE LOCATION OF EXISTING 8" WATER LINEFORT BRAGG PROPERTY LINE IN RED US HWY 24-87PROPERTY LINE IN RED PROPERTY / LAYOUT DATA REQUIRED PARKING: 1 SPACE / 4 SEATS + 1 / 2 EMPLOYEES = FORT BRAGG PLAN REVIEW NOTES 13 10' SIDE LANDSCAPE BUFFER 20' 9' PROPOSED SCM 21 10 9 5 9' 19' 14' 24' 24' 24' R10' R5' R25' R30' R30' PROPOSED RIGHT-IN, RIGHT-OUT PYLON SIGN EXISTING BILLBOARD EXISITING SIGNALIZED INTERSECTION PROPOSED CROSS ACCESS DRIVEWAY PROPOSED CROSS ACCESS DRIVEWAY PROPOSED CROSS ACCESS DRIVEWAY PROPOSED LEFT-IN DRIVEWAY 24' 10' SIDE LANDSCAPE BUFFER 15' LANDSCAPE BUFFER COOKOUT 3,800 SF 100' 410.21' 12' 24' 50' BUILDING SETBACK 12' 14' OUTPARCEL PYLON SIGN 38' 5' 14' 14' 10'245.63'60.69'87.04'100.72'397.72' 10' REAR LANDSCAPE BUFFER R10' POPEYES 2,531 SF (2124 PROTOTYPE) PROPOSED PRIVATE LIFT STATION JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.5410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE06/23/2021 POPEYES - HWY 24 SPOUT SPRINGS NCHARNETT COUNTY, NORTH CAROLINA48763.001 AS SHOWN EX 1.0 FORCEMAIN EXHIBIT 1.0J. SHEARER B. DOWNS B. DOWNS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION PROPERTY / LAYOUT DATA ADDRESS: 0 NC 24-87, CAMERON, NC CURRENT USE = VACANT JURISDICTION = HARNETT COUNTY PARCEL ID = 9585-50-1195.000 CURRENT ZONING = COMM PROPOSED ZONING = COMM REQUIRED PARKING: 1 SPACE / 4 SEATS + 1 / 2 EMPLOYEES = 25 SPACES POPEYES PARKING = 28 SPACES SCALE 1"=50' 100'50'0 PLAN REVIEW NOTES 1.EXISTING CONDITIONS BASED ON DATA OBTAINED FROM NC ONE MAP AND HARNETT COUNTY GIS ON 06/14/2021. 2.THIS CONCEPT SITE PLAN DOES NOT GUARANTEE ALL REQUIREMENTS FROM ZONING ISSUES, NOR SIGNAGE, STORM DRAINAGE, GRADING, UTILITIES, EASEMENTS, AND THE LIKE ARE PROPERLY ADDRESSED AT THIS TIME. THE ABOVE REQUIREMENTS CAN AFFECT THE SITE LAYOUT. 3.ALL REQUIREMENTS ASSUMED WITH THIS LAYOUT ARE TENTATIVE AND SUBJECT TO CHANGE AS MAY BE DIRECTED BY THE CLIENT, ARCHITECT, JOINT DEVELOPER, OR ANY OF THE GOVERNMENTAL PERMITTING AGENCIES. TIMMONS GROUP HAS DONE THE BEST WE CAN GIVEN THE PRELIMINARY NATURE OF THIS WORK. ONLY AFTER A THOROUGH ALTA AND TOPOGRAPHIC SURVEY ARE PERFORMED, AND THE REQUIRED REVIEW PROCESSES ARE COMPLETE, CAN MORE ASSURANCE BE GIVEN TO THIS PLAN AS IT RELATES TO MOVING FORWARD. GENERAL COMMENTS ADVANTAGES: ·ACCESS TO SIGNALIZED SUPER STREET TURNAROUND ·MILITARY COMMUTER TRAFFIC ·OUTPARCEL AVAILABLE DISADVANTAGES: ·WOODED ADJACENT LOT: POSSIBLY DECREASED VISIBILITY ·UTILITY MAIN EXTENSIONS REQUIRED ·ADJACENT BILLBOARD: POSSIBLY DECREASED VISIBILITY ·SUBDIVISION REQUIRED EXISTING PARCEL ACREAGE = 2.28 AC PROPOSED PARCEL ACREAGE = 1 AC OUTPARCEL PARCEL ACREAGE = 1.28 AC OUTPARCEL PARKING = 30 SPACES