HomeMy WebLinkAboutNW Elementary_revised site planFile: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 C00 COVER.dwg, By: trent, Plotted: Thu Jun 17, 2021 at 1:58pm140 Aqua Shed Court
Planning
License No. P-1095
Landscape Architecture
Engineering
O: 910.420.1437F: 910.637.0096
Aberdeen, NC 28315
lkcengineering.com
LKC Engineering, pllc
SHEET INDEX
- COVER SHEET
C-100 GENERAL NOTES AND LEGEND
C-101 EXISTING CONDITIONS AND DEMOLITION PLAN
C-102 TREE TABLE
C-201 SITE LAYOUT PLAN
C-301 DRAINAGE PLAN
C-401 GRADING AND EROSION CONTROL PLAN
C-501 UTILITY PLAN
C-502 UTILITY PROFILES
D-601 SITE DETAILS
D-602 SITE DETAILS & NCDOT DETAILS
D-603 DRAINAGE & BMP DETAILS
D-604 EROSION CONTROL DETAILS
D-605 EROSION CONTROL DETAILS
D-606 NCG01 STORMWATER DETAILS
D-607 WATER DETAILS
D-608 WATER DETAILS
D-609 SANITARY SEWER DETAILS
L-101 PLANTING PLAN
L-102 IRRIGATION PLAN
L-103 PLANTING DETAILS
L-104 ADD ALTERNATE #3 AMPHITHEATER
PROJECT VICINITY MAP
Scale: 1"=1000'
NORTHWEST HARNETT ELEMENTARY SCHOOL
HARNETT COUNTY, NORTH CAROLINA
SITE DATA TABLE
JURISDICTION HARNETT COUNTY, NORTH
CAROLINA
PROPERTY OWNER HARNETT COUNTY BOARD OF
EDUCATION
OWNER ADDRESS PO BOX 1029
LILLINGTON, NC 27546
OWNER CONTACT DR. AARON FLEMING
AFLEMING@HARNETT.K12.NC.US
HARNETT REGIONAL WATER CONTACT SHANE CUMMINGS
SCUMMINGS@HARNETT.ORG
LKC ENGINEERING CONTACT PHILIP PICERNO
PHILIP@LKCENGINEERING.COM
PROPERTY PIN 0645-78-2045.000
PROPERTY PARCEL ID 080645 0004
DEED INFOMATION DB 3784 PG 0261
PROPERTY ZONED RA-30
ACREAGE 41.70 ACS.
SETBACKS FRONT 35'
BACK 25'
SIDES 10'
RIVER BASIN NAME CAPE FEAR
CLASSIFICATION C; HQW
STREAM INDEX 18-15-(0.4) HECTOR CREEK
FLOODPLAIN MAP/DATE 3720064500J / 10-03-2006
PANEL 0645
FLOODPLAIN INVOLVEMENT SHADED "X"
PRELIMINARY - DO NOT USE FOR CONSTRUCTION
PROJECT AREA
ROLLINS RD(SR 1413)WAG
S
T
A
F
F
R
D
CHRISTIANLIGHT RDWAKE
C
O
HARN
E
T
T
C
O
NOTE:
THIS DEVELOPMENT IS WITHIN ONE MILE OF A
VOLUNTARY AGRICULTURAL DISTRICT.
pappa-
4-29-21
ABBREVIATIONS
ABBREVIATION:DESCRIPTION:ABBREVIATION: DESCRIPTION:
A/C AIR CONDITIONING NIC NOT IN CONTRACT
ADJ ADJACENT NTS NOT TO SCALE
AL AREA LIGHT
APROX APPROXIMATE O.C.ON CENTER
ASSM ASSEMBLY OHE OVERHEAD ELECTRIC
ASPH ASPHALT
PC POINT OF CURVATURE
BLDG BUILDING PI POINT OF INTERSECTION
B.O.BLOW-OFF PIV POST INDICATION VALVE
BOC BACK OF CURB PP POWER POLE
BOW BOTTOM OF WALL PT POINT OF TANGENCY
BX BOX PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
C.F.CUBIC FOOT
CI CURB INLET R RADIUS
CL CENTER LINE R.J.RESTRAINED JOINT
CONC CONCRETE R/W, ROW RIGHT OF WAY
CONST CONSTRUCTION RCP REINFORCED CONCRETE PIPE
CY CUBIC YARD RDCO ROOF DRAIN CLEAN OUT
REQD REQUIRED
DEMO DEMOLISH (DEMOLITION)RQMT REQUIREMENT
DP DEEP RT RIGHT
DI DUCTILE IRON RWM RIGHT OF WAY MONUMENT
D.I.P.DUCTILE IRON PIPE
DIA DIAMETER SCH SCHEDULE
DIM DIMENSION SD STORM DRAIN
DWG DRAWING SDCO STORM DRAIN CLEAN OUT
SDMH STORM DRAIN MANHOLE
ECM EXISTING CONCRETE MONUMENT SED SEDIMENT
EIP EXISTING IRON PIPE SF SQUARE FOOT
EIS EXISTING IRON STAKE SPEC SPECIFICATION
ELEC ELECTRIC SQ SQUARE
ELEV ELEVATION SS SANITARY SEWER
ELMH ELECTRICAL MANHOLE SSCO SANITARY SEWER CLEAN OUT
ENCL ENCLOSURE SSMH SANITARY SEWER MANHOLE
EOC EDGE OF CONCRETE STA STATION
EOP EDGE OF PAVEMENT SY SQUARE YARD
EQPT EQUIPMENT
ESMT EASEMENT TBM TEMPORARY BENCHMARK
EX EXISTING TEL TELEPHONE
TEMP TEMPORARY
FES FLARED END SECTION THK THICK
FFE FINISH FLOOR ELEVATION TOC, T/C TOP OF CURB
FH FIRE HYDRANT TOW TOP OF WALL
FNC FENCE TPED TELEPHONE PEDESTAL
FO FIBER OPTIC TS&V TAPPING SADDLE & VALVE
FOC FACE OF CURB TYP TYPICAL
FT FOOT
UGE UNDERGROUND ELECTRIC
G.V.GATE VALVE UTIL UTILITY
GALV GALVANIZE
GND GROUND
GRAV GRAVEL
HDPE HIGH DENSITY POLYETHYLENE
L LENGTH
LF LINEAR FOOT
LFT LEFT
MAX MAXIMUM
MIN MINIMUM
MISC MISCELLANEOUS
M.J.MECHANICAL JOINT
GENERAL NOTES
ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION INDICATED ON THIS SHEET SHALL APPLIED TO ALL
CONTRACT DOCUMENTS AND SHEETS IN THIS SET.
LEGEND / KEY
NAME:EXISTING NEW
ASPHALT PAVEMENT
CABLE TV
CENTERLINE
CURB & GUTTER
CONCRETE
HEAVY DUTY CONCRETE
GRAVEL
MULCH
CONTOUR MAJOR
CONTOUR MINOR
EASEMENT
FENCE
FENCE W/ PRIVACY SLATS
FIBER OPTIC
FORCE MAIN
GAS LINE
GAS VALVE
LIMITS OF DIST/CONST
LIGHT POLE
OVERHEAD ELECTRIC
POWER POLE
PROPERTY LINE
PROPERTY LINE - ADJ
RAILROAD
RIGHT-OF-WAY (ROW)
SANITARY SEWER LINE
SANITARY SEWER MH
SANITARY SEWER CO
SPOT EL. GS
SPOT EL. TOC
SPOT EL. TOW
STORM DRAIN FES
STORM DRAIN LINE
STORM DRAIN MH
STORM DRAIN CI
STORM DRAIN GI
STORM DRAIN YI
TELEPHONE LINE
TELEPHONE PEDESTAL
UNDERGROUND ELEC.
UTILITY POLE
WATER LINE
WATER VALVE
FIRE HYDRANT
WATER METER
WATER LINE BACKFLOW
WATER LINE REDUCER
EROSION CONTROL:NEW
TEMP. CONST ENT.
TEMP. SILT FENCE
TEMP. DIVERSION
TEMP. INLET PROTECT.
TEMP. ROCK PIPE INLETPROTECTION
RIPRAP DISSIPATOR
TEMP. SILT FENCEOUTLET
TEMP. SKIMMER BASINWITH BAFFLES
FAIRCLOTH SKIMMER
TEMP. SEDIMENT TRAPWITH BAFFLES
TEMP. SLOPE DRAIN
TREE PROTECTION
ROLLED EROSIONCONTROL MATTING
1. THE GENERAL CONTRACTOR SHALL FIELD VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AT THE JOB SITE.
2. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR WITH
THE SURVEYOR OF RECORD PRIOR TO BEGINNING CONSTRUCTION. BENCHMARK IS AN EXISTING MAG NAIL LOCATED ON ROLLINS
ROAD (SR 1413), WEST OF THE SCHOOL SITE HAVING AN ELEVATION OF 390.63'.
3. THE VERTICAL DATUM FOR THIS SURVEY IS BASED ON NAVD 88.
4. ALL DIMENSIONS AND ALL ELEVATIONS ARE MEASURED TO FACE OF CURB UNLESS OTHERWISE NOTED.
5. THE INTENT OF THE LIMITS OF DISTURBANCE/CONSTRUCTION (LOD/C) SHOWN ON THE DRAWINGS IS TO DEFINE THE GENERAL
PROJECT AREA TO CONSTRUCT, INSTALL AND/OR MODIFY THE SITE. TYPICALLY, THE LOD/C WILL FOLLOW RIGHT-OF-WAY OR
PROPERTY LINES. THE CONTRACTOR SHALL CONTACT THE OWNER'S REPRESENTATIVE REGARDING ANY QUESTIONS AS TO THE
EXACT LOCATION OF THE LOD/C PRIOR TO BID AND PRIOR TO BEGINNING CONSTRUCTION. ALL ITEMS SHOWN ON THESE PLANS
THAT DO NOT SPECIFICALLY STATE 'NOT-IN-CONTRACT (NIC), SHALL BE INCLUDED IN THE BID COST, INCLUDING ITEMS THAT
MAY BE OUTSIDE THE PROJECT LIMITS.
6. LOCATIONS OF EXISTING UTILITY LINES HAVE BEEN TAKEN FROM UTILITY RECORDS SUPPLEMENTED BY FIELD INSPECTIONS AND
SHOULD INDICATE IN GENERAL THE TYPE OF UNDERGROUND UTILITIES NOW IN SERVICE. LOCATIONS SHOWN ARE NOT
GUARANTEED. DEVELOPERS AND/OR CONTRACTORS SHALL NOT ONLY MAKE SUBSURFACE INVESTIGATIONS BUT SHALL ALSO
ALLOW FOR CONTINGENCIES WHICH MIGHT ARISE BY REASON OF ENCOUNTERING UNRECORDED LINES OR LINES BEING IN
DIFFERENT LOCATIONS THAN INDICATED ON THESE PLANS. AT LEAST 48-HOURS PRIOR OR SOONER IF REQUIRED BY THE LOCAL
MUNICIPALITY TO ANY CONSTRUCTION ACTIVITY, EXCAVATION, GRADING, OR DIGGING ON THE SITE, THE GENERAL
CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES TO VERIFY AND/OR FIELD-LOCATE THEIR RESPECTIVE UTILITIES (THE
NORTH CAROLINA ONE CALL CENTER - 1-800-632-4949). ALL DAMAGE INCURRED TO EXISTING UTILITY LINES DURING
CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTORS EXPENSE.
7. ALL WASTE MATERIAL TO BE BROUGHT OFF-SITE SHALL BE DISPOSED OF IN A LEGALLY PERMITTED DISPOSAL SITE.
8. A FORMAL EROSION AND SEDIMENTATION CONTROL PERMIT IS REQUIRED FOR THIS SITE UNDER THE REGULATIONS OF THE
NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ). THE GENERAL CONTRACTOR IS REQUIRED TO AND
SHALL FOLLOW ALL LOCAL, STATE AND FEDERAL REGULATIONS TO MINIMIZE EROSION AND THE TRANSPORT OF SEDIMENT
OFF-SITE DURING, INCLUDING THE PLACEMENT AND MAINTENANCE OF CONTROL MEASURES. ALL MEASURES REQUIRED SHALL BE
INCLUDED IN THE BID COST WHETHER SPECIFICALLY INDICATED OR NOT.
9. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL HARNETT COUNTY & STATE REQUIREMENTS.
10. DISTURBED AREAS NOT COVERED BY ASPHALT OR OTHER IMPERMEABLE SURFACES SHALL BE SEEDED AND STABILIZED PER
SPECIFICATIONS.
11. SURVEY, BASE MAPPING, & TOPOGRAPHICAL DATA PROVIDED BY ECLS GLOBAL, INC, 19 N. MCKINLEY ST., COATS, NC 27521, TEL.
910-987-3257.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING AND MAINTAINING TREE PROTECTION FENCING AROUND ALL "AT-RISK"
TREES WITHIN THE VICINITY OF THE CONSTRUCTION ACTIVITY WHETHER SPECIFICALLY INDICATED ON THE PLANS OR NOT. TREE
PROTECTION FENCING SHALL BE INSTALLED PRIOR TO BEGINNING ANY CONSTRUCTION OR OTHER DEVELOPMENT ACTIVITIES,
AND SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT THE DURATION OF THE PROJECT UNTIL FINAL SITE INSPECTION. REFER
TO CONSTRUCTION PLAN DETAIL SHEETS FOR TREE PROTECTION DETAIL(S).
13. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL
QUALITY & THE NORTH CAROLINA DEPARTMENT OF WATER QUALITY FOR APPROVAL TO REMOVE ALL CONSTRUCTED
TEMPORARY & PERMANENT EROSION & SEDIMENTATION CONTROL MEASURES, AND FOR THE APPROVAL OF PERMANENT GROUND
COVER.
14. CONTRACTOR SHALL INSTALL A RAIN GAUGE AND MAINTAIN A MONITORING LOG ACCORDING TO NCDEQ REQUIREMENTS UNTIL
THE AGENCY HAS RELEASED THE SITE.
15. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL ACCORDING TO NCDOT REQUIREMENTS DURING THE CONSTRUCTION OF
IMPROVEMENTS IN THE RIGHT-OF-WAY.
16. CONTRACTOR SHALL PROVIDE RED-LINE PRINTS OF ALL CHANGES AND MODIFICATIONS. THIS INFORMATION SHALL BE PROVIDED
TO THE DESIGNER OF RECORD AT THE TIME OF SUBSTANTIAL COMPLETION.
17. CONTRACTOR SHALL INSTALL 6-FT HIGH TEMPORARY CHAIN LINK CONSTRUCTION FENCING OR APPROVED EQUAL IN ALL AREAS
WHERE DIRECT ACCESS TO CONSTRUCTION ACTIVITY IS POSSIBLE, AND SHALL BE MAINTAINED AT ALL TIMES DURING
CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING THE LOCATION OF THE CONSTRUCTION
FENCE AND PEDESTRIAN TRAFFIC CONTROL DURING CONSTRUCTION. ALL FENCING SHALL BE INCLUDED IN THE BID COST
WHETHER SPECIFICALLY INDICATED OR NOT.
18. THE CONTRACTOR SHALL PROVIDE RECORD DRAWINGS TO BE SEALED BY A PROFESSIONAL LAND SURVEYOR INDICATING THE
TOPOGRAPHY OF THE STORMWATER BMP DEVICE AT ONE-FOOT CONTOUR INTERVALS. THEY ALSO SHALL PROVIDE THEIR
DRAWING IN AN ELECTRONIC VERSION. THE FOLLOWING MINIMUM INFORMATION SHALL ALSO BE INCLUDED: TOP AND BOTTOM
ELEVATIONS, SIDE SLOPES, INVERTS, WEIR LOCATION AND ELEVATION, ORIFICE, PIPE SIZES AND LOCATIONS, OUTFALL
STRUCTURE, AND DIAMETER AND INVERT OF OUTFALL STRUCTURE ORIFICE. PRIOR TO SENDING THE REQUIRED DRAWING, THE
CONTRACTOR SHALL CHECK AND ADJUST ALL BMP COMPONENTS TO COMPLY WITH CONTRACT DOCUMENT. ANY RECORD
DRAWINGS SUBMITTED THAT DO NOT COMPLY WITH THE CONTRACT DOCUMENTS SHALL BE REJECTED. UNLESS WRITTEN
AUTHORIZATION IS GIVEN BY THE DESIGNER, THE CONTRACTOR CANNOT DEVIATE FROM THE DESIGN. THE CONTRACTOR SHALL
HAVE A MANDATORY PRE-INSTLALLATION CONFERENCE PRIOR TO THE CONSTRUCTION OF THE POND.
19. CONTRACTOR SHALL NOTIFY LOCAL AUTHORITY'S ENGINEERING DEPARTMENT OR THE ENGINEER OF RECORD PRIOR TO THE
STORMWATER SYSTEM'S INSTALLATION. MINIMUM INSPECTION INCREMENTS ARE AS FOLLOWS:
x ANY EXCAVATION FOR THE DEVICE
x ANY STONE BEDDING OR LINER MATERIAL INSTALLATION
x PIPE INSTALLATION TO INCLUDE OUTFLOW DEVICE
x BACKFILL OF SYSTEM
20. FINAL INSPECTION AND APPROVAL SHALL BE MADE PRIOR TO CERTIFICATE OF OCCUPANCY BEING ISSUED.
21. CONTRACTOR SHALL MAINTAIN A COPY OF THE LOCAL AUTHORITY'S APPROVED PLANS ALONG WITH ANY PERMIT LETTERS THAT
HAVE BEEN MARKED "APPROVED" OR "APPROVED AS CORRECTED" ON SITE DURING CONSTRUCTION.
C-100
GENERAL NOTESAND LEGEND
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
CONTRACT DOCUMENTS
No. Date Description
engineering, pllc
140 Auqa Shed Ct., Aberdeen, NC 28315
Office: 910-420-1437 Fax: 910-420-1438
lkcengineering.com License No. P-1095
PAPA
3 -Z -21
410405400405405 400400400395395395390390390385385385380380380375375375370370370
365
36
5
37
0
375370375375380380 3
8
0
N69°07'27"W
1714.74'N2°19
'52
"W581.66
'
N87°36'5
8"
E
58.15'
N87°36'58"E30.41'
N
1
1
°
4
9
'
4
7
"W
2
2
2
.
5
0
'N5°08
'
25
"W
18
9
.
74
'
S69°38'14"E32.61'S69°26'52"E
1933.92'S2°19'04"W990.00'1/2" ∅ IRSFLUSH
1/2" ∅ IRSFLUSHCONTROL CORNER
EXISTING NAIL ON
TREE STUMPN:657949.317E:2046205.832NC GRID: NAD 83
1/2" ∅ EIR4" BELOW
1/2" ∅ IRSFLUSH
MNS
MNS
MNS
CONTROL CORNERECMN:658929.5830
E:2046238.6130NC GRID: NAD 83 1/2" ∅ IRSFLUSH
TBM (EMN)N:657915.2820
E:2046381.4910ELEV:390.63'NC GRID: NAD 83
CONTROL CORNER3" ∅ EIP (16" ABOVE)N:657261.4680E:2048009.4100
NC GRID: NAD 83
WAKE COUNTY
HARNETT COUNTY
BARN(TO BE REMOVED)
ABANDONED STRUCTURE(TO BE REMOVED)
ABANDONED STRUCTURE
(TO BE REMOVED)
EX. 24" RCP(TO REMAIN)
EX. 15" RCP(TO BE REMOVED)
EX. 18" RCP
EX. 18" RCP
EX. 18" RCP
EX. 24" RCP
WM
WM
WM
WM
PP
PP
PP
PP
PP
POND
POND
SWAMP
WETLAND
WETLAND
ROLLINS
RD
(SR
1413
)60' PUBL
IC
R/W
WAGSTAFF RD (SR 1100)
PUBLIC R/W
RICHARD 0. BETTS &
BEN ALLEN BETTS
DB 3705 PG 0715
ZONING: RA-30
USE: RESIDENTIAL
RICHARD 0. BETTS &
BEN ALLEN BETTS
DB 3705 PG 0715
ZONING: RA-30
USE: RESIDENTIAL
DIANE HILL
DB 2110 PG 0852
ZONING: RA-30
USE: RESIDENTIAL
JMH HOWARD TRUST
DB 1231 PG 0022
ZONING: RA-20M
USE: RESIDENTIAL
TP BETTS LLC
DB 3710 PG 0936
ZONING: RA-30
USE: RESIDENTIAL
WATSON ADCOCK LLC
DB 1187 PG 0663
ZONING: RA-30
USE: RESIDENTIAL
HARNETT COUNTY
BOARD OF EDUCATION
DB 3784 PG 0261
ZONING:
RA-20M/RA-30
USE: OTHER
10.00'SETBACK35.00'
SETBA
C
K10.00'SETBACK25.00'
SETBACK
25.00'
SETBAC
K
10.00'SETBACK35.00'
SETBA
C
K
EXISTING TREE
(TO BE REMOVED, TYP.)
EXISTING EDGE OF PAVEMENT
1
1
EX. DRIVEWAY(TO BE REMOVED)File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 C101 X-TOPO.dwg, By: trent, Plotted: Wed Apr 28, 2021 at 3:00pm( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
80 80 16040
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
C-101
EXISTING
TOPOGRAPHIC
SURVEY
NOTES:
1. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATIONINDICATED ON SHEET C-100 SHALL APPLY TO THIS PLAN.
2. THE PURPOSE OF THE PLAN IS FOR INFORMATIONAL PURPOSES ONLY.
THOUGH THIS PLAN IS FROM AN ACTUAL FIELD SURVEY IT IS NOT ANDSHOULD NOT BE CONSIDERED A RECORDABLE DOCUMENT.3. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUSTBE VERIFIED BY THE GENERAL CONTRACTOR WITH THE SURVEYOR OF RECORDPRIOR TO BEGINNING CONSTRUCTION.
4. LOCATIONS OF EXISTING UTILITY LINES HAVE BEEN TAKEN FROM UTILITYRECORDS SUPPLEMENTED BY FIELD INSPECTIONS AND SHOULD INDICATE INGENERAL THE TYPE OF UNDERGROUND FACILITIES NOW IN SERVICE.HOWEVER, LOCATIONS SHOWN ARE NOT GUARANTEED AND ANY FURTHERDEVELOPERS OR CONTRACTORS SHOULD NOT ONLY MAKE SUBSURFACE
INVESTIGATIONS BUT SHOULD ALSO ALLOW FOR CONTINGENCIES WHICH
MIGHT ARISE BY REASON OF ENCOUNTERING UNRECORDED LINES OR LINESBEING IN DIFFERENT LOCATIONS THAN INDICATED ON THIS PLAT.5. THE HORIZONTAL DATUM FOR THIS SURVEY IS NAD83 AND THE VERTICALDATUM IS NAVD88.6. ALL DISTANCES ARE HORIZONTAL GROUND.
7. AREA BY COORDINATE COMPUTATION.8. SURVEY INFORMATION FROM THE SURVEYOR OF RECORD, ECLS GLOBAL, INC.,19 N. MCKINLEY ST., COATS, NC 27521, TEL #: 910-897-3257.
EROSION CONTROL KEY NOTING:
SYMBOL DESCRIPTION SHEET REFERENCE
INSTALL TREE PROTECTION SEE SHT. D-605, #31
2
2
2
PAPA
4-29-21
File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 C101 X-TOPO.dwg, By: trent, Plotted: Mon Mar 08, 2021 at 5:07pmPROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
CONTRACT DOCUMENTS
No. Date Description
engineering, pllc
140 Auqa Shed Ct., Aberdeen, NC 28315
Office: 910-420-1437 Fax: 910-420-1438
lkcengineering.com License No. P-1095
C-102
TREE
TABLE
Philpot
3-2-21
PUMP STATION SITE
PUMP BY OWNER (COUNTY)FENCE AND GRAVEL NOT IN CONTRACT
20' GRAVEL ACCESSROAD (NIC)
NORTHWEST HARNETT
ELEMENTARY SCHOOL
FFE: 400.25'
MEDIA CENTER
PATIO
AMPHITHEATER /
STAGE
SIDEWALKS & SEATWALLS
SMALL PLAY
STRUCTURE
LARGE GRASS
PLAY FIELD
LARGE PLAY
STRUCTURE
DOUBLE STACK
DROP-OFF LOOP
DOUBLE STACK
DROP-OFF LOOP
BUS PARKING
12 SPACES
2800 lf (1400 lf
EACH LANE)
FLAG POLE
STORMWATER
MANAGEMENT
AREA
SERVICE YARD
CANOPY
BUS DROP-OFF/
PICK-UP LOOP
FENCE WITH PRIVACY SLATSAROUND SERVICE YARDAND LP TANK
TRANSFORMER/GENERATORGRAVEL
PRE-K PLAY FENCED PLAY
FENCE, MULCH, UNDER DRAINS
20' GRAVEL FIRE LANE - BASE BID
HD PAVING - ALTERNATE PROVIDE FENCE AND CURBEQUIPMENT AND MULCH BY OWNER
PROVIDE FENCE AND CURBEQUIPMENT AND MULCH BY OWNER
PATIO
ART
PATIO
ADD ALTERNATE #3AMPHITHEATER,SIDEWALKS IN COURTYARD,AND SEAT WALLS
ADD ALTERNATE #16
PERIMETER FENCE
ADD ALTERNATE #1
CANOPY, WALKWAY,AND LIGHTING
PATIO
1
1
1
1
1
11
1
1
1
1
1
1
1
11
1
1
1
2
22
2 2
2
2
2
2
2
4
4
4
4
4
4
4
5
5
55
5
5
5
5
55
5
5
55
5
5
5
5
5
5
5
5
5
5
5
7
6
7
6
6
7
6
6
6
6
7
7
7
7
7
7
7
7
7
6
6
6 6 6
6
6
6
7 7
7 7
7
7 7
7
7
7
6
8
8
8
9
9
9
9
10
11
11
11
11
13 13
14
16
19
19
19
19
1919
19
19
19
19
19
19
21
21
2121
21
21
22
22
19
1630.00'R30.00'R15.00
'
R30.00'R25.00'R15.00'
R15.
0
0
'
R
5
.
0
0
'
R5.00'
R4.00'
R5.00'
R5.00'
R15.00'
R15.00'R5.00'
R
1
5
.
0
0
'R5.00'R15.00'R
5
.
0
0
'
R5.0
0
'
R15
.
0
0
'
R25.00'
R1
5
.
0
0
'R15.00'R5.00'45.00'24.00'19.00'(TYP.)9.00' (TYP.)24.00'(TYP.)36
.
00
'40.00'40.00'6.00
'6.00'6.00'8.00'
5
ROLLINS
RD
(SR
1413
)60' PUBL
IC
R/W
24
24
24
2424
22
22
22
(TYP.)25
(TYP.)25
6
6
(TYP.)25
(TYP.)13
STAFF PARKING
124 SPACES
VISITOR &HANDICAP
PARKING45.00'15.00'
45.00'
2
2
.
0
0
'14.00'B-B4
5
.
0
0
'15.00'4
30.00'15.0
0
'
(TYP
.
)60.00'ADD ALTERNATE #595 PARKING SPACES
6.0
0
'
9
ADDITIONAL
PULL-OFFPARKING
STAFF PARKING8 SPACES
ADD ALTERNATE #16PERIMETER FENCING
7
7
6
19
R63.
0
0
'R162.00
'
21
6 6
6
662
2 (DRIVE AISLES AND
PARKING STALLS)R25.00'R5.00'R
1
5
.
0
0
'
R
5
.
0
0
'R5.00'R
1
5
.
0
0
'9.00' (TYP.)19.00'(TYP.)24
(TYP.)25
MONUMENTAL SIGN
(SEE ARCHITECTURALPLANS FOR DETAIL)
LED SIGN MESSAGEDISPLAN SIGN(SEE ARCHITECTURAL
PLANS FOR DETAIL)19.00'15.00'15.00'9.00'R5.00'R5
.
0
0
'20.00
'R150.00'
2' CURB TAPER
AFER CURB INLET
2' CURB TAPER
51.72' (TYP.)
(TYP.)
6.00' (TYP.)File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 C201 SITE LAYOUT_2.dwg, By: trent, Plotted: Thu Jun 17, 2021 at 1:59pm( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
50 50 10025
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
C-201
OVERALL SITE
LAYOUT
NOTES:
1. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION INDICATED ON THEGENERAL NOTES, LEGEND AND ABBREVIATIONS SHEET, SHEET C-100 SHALL APPLY TO THISPLAN.2. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL HARNETT COUNTY STANDARDS ANDSPECIFICATIONS.
3. CONTRACTOR SHALL ENSURE THAT THE EXISTING UTILITIES ARE LOCATED AND MARKED PRIOR
TO INSTALLATION OF NEW UTILITIES.
SITE DATA TABLE
JURISDICTION HARNETT COUNTY, NORTH
CAROLINA
PROPERTY OWNER HARNETT COUNTY BOARD OF
EDUCATION
OWNER ADDRESS PO BOX 1029
LILLINGTON, NC 27546
OWNER CONTACT DR. AARON FLEMING
AFLEMING@HARNETT.K12.NC.US
HARNETT REGIONAL WATER CONTACT SHANE CUMMINGS
SCUMMINGS@HARNETT.ORG
LKC ENGINEERING CONTACT PHILIP PICERNO
PHILIP@LKCENGINEERING.COM
PROPERTY PIN 0645-78-2045.000
PROPERTY PARCEL ID 080645 0004
DEED INFOMATION DB 3784 PG 0261
PROPERTY ZONED RA-30
ACREAGE 41.70 ACS.
SETBACKS FRONT 35'
BACK 25'
SIDES 10'
RIVER BASIN NAME CAPE FEAR
CLASSIFICATION C; HQW
STREAM INDEX 18-15-(0.4) HECTOR CREEK
FLOODPLAIN MAP/DATE 3720064500J / 10-03-2006
PANEL 0645
FLOODPLAIN INVOLVEMENT SHADED "X"
2
1
3
SITE KEY NOTING:
SYMBOL DESCRIPTION SHEET REFERENCE
INSTALL HEAVY DUTY ASPHALT PAVEMENT (DRIVE AISLES)SEE SHT. D-601, #1
INSTALL LIGHT DUTY ASPHALT PAVEMENT (PARKING STALLS)SEE SHT. D-601, #1
INSTALL CONCRETE PAVEMENT SEE SHT. D-601, #2
INSTALL CONCRETE SIDEWALK WITH CURB SEE SHT. D-601, #3
INSTALL CONCRETE SIDEWALK SEE SHT. D-601, #4
INSTALL 24" CONCRETE CURB AND GUTTER (STANDARD)SEE SHT. D-601, #5
INSTALL 24" CONCRETE CURB AND GUTTER (SPILL)SEE SHT. D-601, #5
INSTALL GRAVEL PAVEMENT/PAD SEE SHT. D-601, #6
INSTALL HANDICAP RAMP - STANDARD SEE SHT. D-601, #7
INSTALL HANDICAP RAMP AT DROP OFF SEE SHT. D-601, #8
INSTALL HANDICAP RAMP "IN-LINE" TYPE SEE SHT. D-601, #9
INSTALL HANDICAP RAMP "IN-LINE" TYPE SEE SHT. D-601, #10
INSTALL HANDICAP PARKING SIGN SEE SHT. D-601, #11
INSTALL TABLE TOP CROSSWALK SEE SHT. D-601, #12
INSTALL 8' DOUBLE SWING GATES SEE SHT. D-601, #13
INSTALL 24' DOUBLE SWING GATES SEE SHT. D-601, #13
INSTALL 8' CHAIN LINK FENCE SEE SHT. D-601, #14
INSTALL 6' CHAIN LINK FENCE SEE SHT. D-601, #14
INSTALL 4' CHAIN LINK FENCE SEE SHT. D-601, #14
INSTALL PRIVACY SLATS SEE SHT. D-601, #15
INSTALL PEDESTRIAN SWING GATE SEE SHT. D-601, #16
INSTALL PLAY AREA CURB SEE SHT. D-601, #17
INSTALL CONCRETE FILLED BOLLARD SEE SHT. D-602, #3
INSTALL "STOP" OR "DO NOT ENTER" OR "RIGHT TURN PROHIBITED" OR"STOP & DROP OFF" SIGN SEE SHT. D-602, #4
INSTALL CONCRETE WHEELSTOP SEE SHT. D-602, #5
INSTALL NCDOT TURN ARROWS AND SITE STRIPING SEE SHT. D-602, 1205.01& 1205.08
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
LEGEND:
ADD ALTERNATE
23
( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
20 20 4010
1
2
3
8
8
18 20
18 20
18 20
18 20
15 20
15 20
5
19 19
LEGEND / KEY
NAME: NEW
FENCE
FENCE W/ PRIVACY SLATS
SERVICE YARD
23
25
17 20
24
16 20
25
2
2
2
2
2
2
PAFA
4-29-21
STORMWATER
MANAGEMENT AREA
CI-05
RIM: 405.2215" INV OUT: 399.92 (E)
CI-06RIM: 403.9415" INV IN: 398.59 (W)
18" INV IN: 398.44 (N)18" INV OUT: 398.34 (E)
CI-07RIM: 400.7518" INV IN: 395.14 (W)
18" INV OUT: 395.04 (SE)
CI-08ARIM: 399.00
6" INV IN: -3.71 (NE)
6" INV IN: -3.72 (E)6" INV IN: -3.83 (S)
15" INV OUT: 395.50 (NW)
CI-08RIM: 399.00
18" INV IN: 393.02 (NW)24" INV IN: 392.52 (SW)
30" INV OUT: 392.02 (SE)
GI-20ARIM: 399.00
6" INV IN: 396.25 (NE)
6" INV IN: 396.25 (E)15" INV OUT: 395.50 (SW)
GI-09
RIM: 398.75
30" INV IN: 391.54 (NW)
30" INV OUT: 391.44 (E)
GI-12ARIM: 398.758" INV IN: 393.48 (SW)
15" INV IN: 393.15 (NW)8" INV IN: 393.48 (W)
15" INV OUT: 392.90 (E)
CI-08CRIM: 398.7518" INV IN: 394.45 (SW)
15" INV IN: 394.70 (SE)24" INV OUT: 393.95 (NE)
CI-08DRIM: 398.10
24" INV IN: 393.39 (SW)8" INV IN: 393.72 (SE)
24" INV OUT: 393.29 (NE)
CI-08ERIM: 398.1018" INV OUT: 394.66 (NE)
GI-12CRIM: 397.7515" INV IN: 391.24 (W)
10" INV IN: 392.74 (NW)15" INV OUT: 391.14 (E)
GI-12B
RIM: 397.7515" INV IN: 392.17 (W)
10" INV IN: 393.32 (NW)
15" INV OUT: 392.07 (E)
GI-20BRIM: 397.75
15" INV IN: 395.02 (NE)6" INV IN: 395.60 (SE)
8" INV IN: 395.60 (NE)
15" INV OUT: 394.92 (W)
CI-20HRIM: 397.1015" INV IN: 389.47 (W)
8" INV IN: 390.05 (N)18" INV OUT: 389.22 (S)
CI-20CRIM: 397.00
15" INV IN: 393.50 (E)
15" INV OUT: 393.40 (SW)
CI-20GRIM: 396.75
15" INV IN: 390.70 (W)15" INV OUT: 390.60 (E)
CI-08BRIM: 397.11
15" INV IN: 395.17 (SE)6" INV IN: 395.75 (NE)
8" INV IN: 395.75 (S)15" INV OUT: 395.07 (NW)
CI-19RIM: 396.00
18" INV IN: 388.17 (NW)18" INV OUT: 388.07 (E)
CI-20DRIM: 395.86
15" INV IN: 392.67 (NE)15" INV OUT: 392.57 (SE)
CI-20F
RIM: 395.8515" INV IN: 391.42 (NW)
15" INV OUT: 391.32 (E)
GI-12D
RIM: 395.7515" INV IN: 388.41 (W)
6" INV IN: 389.16 (N)
15" INV OUT: 388.31 (E)
CI-20IRIM: 395.5018" INV IN: 388.13 (N)
18" INV OUT: 388.03 (S)
CI-20ERIM: 394.78
15" INV IN: 391.69 (NW)15" INV OUT: 391.59 (SE)
SDMH-10RIM: 399.00
30" INV IN: 390.56 (W)
8" INV IN: 391.73 (S)30" INV OUT: 390.46 (E)
CI-20RIM: 394.00
18" INV IN: 387.39 (W)
18" INV IN: 387.39 (N)30" INV OUT: 386.39 (E)
CI-22ARIM: 394.2515" INV OUT: 387.50 (S)
CI-18RIM: 394.0018" INV IN: 389.14 (NW)
18" INV OUT: 389.04 (SE)
CI-17RIM: 393.7515" INV IN: 389.87 (NW)
18" INV OUT: 389.62 (SE)
CI-21A
RIM: 393.75
15" INV OUT: 388.56 (S)
SDMH-11RIM: 393.50
30" INV IN: 387.83 (W)30" INV OUT: 387.73 (S)
CI-16
RIM: 393.5015" INV OUT: 390.25 (SE)
CI-21RIM: 392.50
30" INV IN: 385.85 (W)15" INV IN: 388.35 (N)
30" INV OUT: 385.75 (E)
SDMH-12RIM: 396.00
15" INV IN: 386.52 (W)30" INV IN: 385.09 (N)
30" INV OUT: 384.99 (S)
CI-23RIM: 391.45
30" INV IN: 384.14 (W)30" INV OUT: 384.04 (E)
CI-22RIM: 391.00
30" INV IN: 385.24 (W)
15" INV IN: 385.82 (N)
30" INV OUT: 384.57 (E)
SDMH-14RIM: 387.5030" INV IN: 382.62 (W)
30" INV IN: 382.06 (NW)8" INV IN: 383.16 (N)
42" INV OUT: 381.62 (E)
FES-1542" INV OUT:380.72
RISER STRUCTURE-24RIM: 381.50
24" INV OUT: 374.50 (E)
SDMH-13
RIM: 396.5030" INV IN: 383.75 (N)
18" INV IN: 384.57 (W)30" INV OUT: 383.47 (SE)
FES-2524" INV OUT:374.00
89 LF 15" RCP @ 1.50%
213 LF 18" RCP @ 1.50%
73 LF 15" RCP @ 0.51%112 LF 24" RCP @ 0.50%96 LF 18" RCP @ 0.50%139 LF 15" RCP @ 1.02%
72 LF 15" RCP @ 1.02%
50 LF 18" RCP @ 1.29%
42 LF 15" RCP @ 0.51%
45 LF 15" RCP @ 3.77%121 LF 24" RCP @ 0.64%135 LF 18" RCP @ 1.50%
56 LF 30" RCP @ 0.85%
102 LF 30" RCP @ 0.
8
6
%
73 LF 15" RCP @ 1.01%
83 LF 15" RCP @ 1.01%
91 LF 15" RCP @ 3.00%
175 LF 18" RCP @ 0.50%
136 LF 18" RCP @ 0.50%107 LF 30" RCP @ 0.50%102 LF 3
0"
R
C
P
@
0.
5
0
%
87 LF 30" RCP @ 0.50%284 LF 30" RCP @ 0.50%260 LF 30" RCP @ 1.02%69 LF 15" RCP @ 2.60%
42 LF 24" RCP @ 1.20%
75 LF 15" RCP @ 0.50%
129 LF 42" RCP @ 0.70%
65 LF 15" RCP @ 0.51%
306 LF 30" RCP @ 0.86%
1
0
7
L
F
1
8
"
R
C
P
@
1
.
0
2
%
47 LF 15" RCP @ 1.03%
17 LF 15" RCP @ 1.02%
8
6
L
F
1
5
"
R
C
P
@
1
.
0
2
%
42 LF 18" RCP @ 0.50%
110 LF 15
"
R
C
P
@
1
.
0
2
%
61 LF 15" RCP @ 1.01%124 LF 30" RCP @ 1.00%141 LF 3
0
"
R
C
P
@
1
.
0
0
%
1 1 1
1
1
1
1
1
1
1
1
1
1
1
11
1
1
1
1
1
1
1
1
2
2
22
2
2
2 2 2
3
3
3
3
3
7
8
5 (TYP.)
5 (TYP.)
5 (TYP.)
4 (TYP.)
6 (TYP.)
6 (TYP.)
6 (TYP.)4"4"4"4"4"4"4"4"4"4"4"4"4"8"4"4"4"6
"10"10"15
"8"18"8"8"6"6"6"
8"6"6
"6"6"
8"
4"
4"
4"8"4"
FES-26
18" INV OUT: 405.50
75 LF 18" CLASS IV RCP @ 0.51%
FES-27
18" INV OUT:405.12
FES-2818" INV OUT: 392.50
74 LF 18" CLASS IV RCP @ 2.02%
FES-2918" INV OUT:391.00
6"
6"6"8"8"12"10"8"
15
"6"6"8"12"15"
18"
6"
8"8"6"6"8"6"6"NORTHWEST HARNETT
ELEMENTARY SCHOOL
FFE: 400.25'
1
1
1 1
43 LF 18" RCP @ 2.00%
79 LF 15" RCP @ 2.00%
CI-06CRIM: 406.5015" INV IN: 399.55 (E)
15" INV IN: 399.55 (W)18" INV OUT: 399.30 (S)
CI-06DRIM: 407.50
15" INV OUT: 401.13 (E)
48 LF 15" RCP @ 2.00%
CI-06B
RIM: 405.30
15" INV IN: 400.61 (NE)
15" INV OUT: 400.51 (W)
28 LF 15" RCP @ 2.00%
CI-06A
RIM: 405.3015" INV OUT: 401.18 (SW)
31 LF 8" HDPE @ 2.00%
NYLOPLAST DBRIM: 399.958" INV OUT: 394.10 (E)9
ROLLINS
RD
(SR
1413
)60' PUB
L
IC
R/WFile: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 C301 DRAINAGE_2.dwg, By: trent, Plotted: Thu Jun 17, 2021 at 1:59pm( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
50 50 10025
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
C-301
DRAINAGE PLAN
NOTES:
1. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION INDICATED ON THEGENERAL NOTES, LEGEND AND ABBREVIATIONS SHEET, SHEET C-100 SHALL APPLY TO THISPLAN.2. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL HARNETT COUNTY STANDARDS ANDSPECIFICATIONS.
3. CONTRACTOR SHALL ENSURE THAT THE EXISTING UTILITIES ARE LOCATED AND MARKED PRIORTO INSTALLATION OF NEW UTILITIES.
DRAINAGE AND SANITARY SEWER KEY NOTING:
SYMBOL DESCRIPTION SHEET REFERENCE
INSTALL CURB INLET SEE SHT. D-603, #1,2
INSTALL GRATE INLET SEE SHT. D-603, #3,4
INSTALL STORM DRAIN MANHOLE SEE SHT. D-603, #5,6
INSTALL DOWNSPOUT TO DRAINAGE TIE-IN SEE SHT. D-603, #7
INSTALL STORM DRAIN CLEANOUT SEE SHT. D-603, #8
INSTALL UNDER DRAIN AT PLAY AREA SEE SHT. D-603, #9
INSTALL RISER STRUCTURE SEE SHT. D-603, #10,11
INSTALL BIORETENTION CELL SEE SHT. D-603, #12,13
INSTALL NYLOPLAST DRAIN BASIN SEE SHT. D-603, #15
2
1
3
4
5
6
7
8
4" UNDERDRAIN (TYP.)
4" CAPPEDCLEANOUT (TYP.)
9
2
2
2
2
2
EDGE OF BIORETENTIONCELL ELEV: 380.50
pappa-
4-29-21
410405400
405405 400400400395395395390390390385385385380380380375375375370370370
394
39739039
9 3993
9
8
400400
400
397400
3953
9
5
395
394395
398
398
399
399399
398 398 397397396395398396395393
392
391
390
391392393394395396 396396
396
395 395395396
391 392393395396394
393394
390395 39339439539639
6
375
380
385
380
385
390 3904
0
0400
40
8408
400
396
4
0
0
399 399
394
39
5
3
9
1
4
0
8
405
400397398397
397
397
396
3953993
9
9
397
397
39839939
8
39
7
3973973
9
7
3
9
7 399399
3
9
8
39
7
39
639739840
8 40140240340440
5
405405405
406
407
40640
7 406407407408408409409410410411412
401402403404401402403404407406401
402
403
404405406407 402403404385380
379
378
381382
380
375
370
NORTHWEST HARNETT
ELEMENTARY SCHOOL
FFE: 400.25'
FES-29
FES-27
FES-15
FES-25
SKB-2
SKB-1
1
1
2
2
2
2
2
2
2
2
2
222
2
2
2
2
3
3
3
3333
3
4
4
4
4
4
4
4
4
5 5 5
5
55 5 5
5
5
5
5
5 5
5555
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
6
6 6
6
7
7
7
7
8
SKB-3
SKB-4
9
9
10
10
10
10
10
10
10
10
10
10
10
11
11
TSW-1 TSW-2
TSW-3 TSW-4
TSW-5
TSW-6
TSW-7
LIMITS OF DISTURBANCE/CONSTRUCTION:21.80 ACRES
ROL
L
INS
RD
(SR
1413
)60' PUBL
IC
R
/W
TOP OF WEIR
381.75
TOP OF BERM
382.75
2
10
File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 C401 GRADING & EC_2.dwg, By: trent, Plotted: Thu Jun 17, 2021 at 4:35pm( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
50 50 10025
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
C-401
GRADING AND
EROSION CONTROL
PLAN
GENERAL NOTES:
1. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION
INDICATED ON SHEET C-100 SHALL APPLY TO THIS PLAN.
2. THE PURPOSE OF THE PLAN IS FOR INFORMATIONAL PURPOSES ONLY.
THOUGH THIS PLAN IS FROM AN ACTUAL FIELD SURVEY IT IS NOT AND
SHOULD NOT BE CONSIDERED A RECORDABLE DOCUMENT.
3. PURSUANT TO G.S.113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS
SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY
VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR
STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7
CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED
OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND
COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION.
PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND
COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL
DISTURBED AREAS WITHIN 15 WORKING DAYS OR 60 CALENDAR DAYS
(WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR
DEVELOPMENT. ALL SEEDED AREAS WILL BE FERTILIZED, RE-SEEDED AS
NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE
VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATION COVER. IF
ANY SEEDING FAILURE OCCURS, THOSE AREAS SHALL BE RE-SEEDED WITH RYE
GRAIN FOR TEMPORARY STABILIZATION AND PREPARED FOR PERMANENT
SEEDING.
4. CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES
ONLY AFTER REMOVAL HAS BE APPROVED BY NCDEQ.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING EROSION AND
SEDIMENTATION CONTROL MONITORING ACCORDING TO NPDES PERMIT
REQUIREMENTS.
DEQ CONSTRUCTION GENERAL PERMIT GROUND
STABILIZATION REQUIREMENTS
SITE AREADESCRIPTION STABILIZATION TIMEFRAME STABILIZATION TIMEFRAME EXCEPTIONS
Perimeter dikes, swales,ditches and slopes 7 days None
High Quality Water (HQW)Zones 7 days None
Slopes steeper than 3:1 7 days
If slopes are 10' or less in
length and are not
steeper than 2:1, 14 days
are allowed
Slopes 3:1 or flatter 7 days
-7 days for slopes greaterthan 50 feet in length andith slopes steeper than4:1
-7 days for perimeter
dikes, swales, ditches,
perimeter slopes andHQW Zones
All other areas withslopes flatter than 4:1 7 days
-7 days for perimeterdikes, swales, ditches,
perimeter slopes andHQW Zones
Note: After the permanent cessation of construction activities, any areas withtemporary ground stabilization shall be converted to permanent groundstabilization as soon as practicable but in no case longer than 60 calendar daysafter the last land disturbing activity. Temporary ground stabilization shall bemaintained in a manner to render the surface stable against accelerated erosionuntil permanent ground stabilization is achieved.* "Extensions of time may be approved by the permitting authority based onweather or other site-specific condition that make compliance impracticable."(Section II.B(2)(b))
EROSION CONTROL SEQUENCE:
1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE-CONSTRUCTION CONFERENCE.2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE AND TEMPORARY SILT FENCE AS SHOWN ONPLANS.3. APPLY TEMPORARY SEEDING TO ALL DISTURBED AREAS.4. INSTALL TEMPORARY SKIMMER BASINS.
5. INSTALL TEMPORARY DIVERSION SWALES IMMEDIATELY AFTER CONSTRUCTION OF THE SKIMMERBASINS. STABILIZE ALL TEMPORARY DIVERSIONS WITHIN SEVEN DAYS OF CONSTRUCTION.6. ROUGH GRADE THE SITE.7. MAINTAIN ALL EROSION CONTROL DEVICES.8. INSTALL UNDERGROUND UTILITIES WHILE MAINTAINING ALL EROSION CONTROL DEVICES.
9. FINE GRADE THE SITE AND APPLY PERMANENT SEEDING AS REQUIRED.
10. ALL EXCAVATED SOILS, NO LONGER REQUIRED FOR THE PROJECT AREA ARE TO BE REMOVED FROM THESITE AND DISPOSED OF IN A LEGALLY PERMITTED BORROW PIT.11. CONSTRUCT DRIVEWAYS AND PARKING AREAS TO THE LIMITS OF AND INCLUDING THE BASE COURSEAND INTERMEDIATE ASPHALT COURSE, TOP LAYER OF ASPHALT SHALL NOT BE INSTALLED AT THISTIME.12. CONSTRUCT THE NEW SCHOOL BUILDING WHILE MAINTAINING THE EROSION CONTROL DEVICES.
13. CONSTRUCT THE SIDEWALKS.14. ALL EROSION CONTROL DEVICES ARE TO BE FULLY MAINTAINED WHILE CONSTRUCTION IS UNDERWAY.15. ONCE ALL GRADING ACTIVITIES ARE COMPLETED AND SOILS STABILIZED, THE REMAINING ASPHALT ISTO BE INSTALLED.16. ALL EROSION CONTROL DEVICES ARE TO REMAIN UNTIL THE SITE HAS BEEN INSPECTED AND RELEASED
BY THE NCDEQ INSPECTOR.
TEMPORARY
DIVERSION
SWALES
CONSTRUCTION SCHEDULE
MINIMUMDEPTH (ft)BOTTOMWIDTH (ft)
SIDESLOPE(H-ft:V-ft)
MINIMUMTOPWIDTH (ft)
CHANNELSLOPE (%)CHANNEL LINING
TSW-1 0.49 Ft 0.00 Ft 3:1 2.94 Ft 1.70 % S75 STRAW
TSW-2 1.00 Ft 0.40 Ft 3:1 6.40 Ft 1.21 % S75 STRAW
TSW-3 0.71 Ft 0.00 Ft 3:1 4.26 Ft 1.46 % S75 STRAW
TSW-4 1.00 Ft 0.46 Ft 3:1 6.46 Ft 2.35 % S75 STRAW
TSW-5 0.24 Ft 0.00 Ft 3:1 1.44 Ft 6.00 % S75 STRAW
TSW-6 0.42 Ft 0.00 Ft 3:1 2.52 Ft 3.45 % S75 STRAW
TSW-7 1.00 Ft 5.31 Ft 3:1 11.31 Ft 1.78 % S75 STRAW
SKIMMER
BASINS
DESIGN INFORMATION CONSTRUCTION INFORMATION SKIMMER SIZING
DRAINAGEAREAS (AC)
SURFACEAREA WIDTH
(FT)
SURFACEAREA
LENGTH(FT)
STORAGEDEPTH(SD)(FT)
WIDTHAT TOP
OF BERM** (FT)
LENGTHAT TOPOF BERM
** (ft)
SIDESLOPE(H-FT :V-FT)
WEIRLENGTH
(LW)(FT)
SKIMMERSIZE (IN)ORIFICESIZE (IN)
SKB-1 3.18 AC 44 Ft 88 Ft 2.0 ft 52 Ft 96 Ft 2:1 11 Ft 1.50 in 1.50 in
SKB-2 1.94 AC 46 Ft 92 Ft 2.0 ft 54 Ft 100 Ft 2:1 13 Ft 1.50 in 1.25 in
SKB-3 2.71 AC 53 Ft 106 Ft 2.0 ft 61 Ft 114 Ft 2:1 16 Ft 1.50 in 2.00 in
SKB-4 12.64 AC 102 Ft 204 Ft 2.0 ft 110 Ft 212 Ft 2:1 56 Ft 4.00 in 3.00 in
** MEASURED FROM INSIDE OF BERM TO INSIDE OF BERM.
RIPRAP
VELOCITY
DISSAPATOR
CONSTRUCTION SCHEDULE
LENGTH(ft)WIDTH (ft)3*D-o APRONTHICKNESS(in)
RIPRAPCLASS
FES-15 22 Ft 26 Ft 11 Ft 24 In 1
FES-25 10 Ft 12 Ft 5 Ft 12 In A
FES-27 10 Ft 12 Ft 5 Ft 12 In A
FES-29 10 Ft 12 Ft 5 Ft 12 In A
EROSION CONTROL KEY NOTING:
SYMBOL DESCRIPTION SHEET REFERENCE
INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SEE SHT. D-604, #1
INSTALL TEMPORARY SILT FENCE SEE SHT. D-604, #2
INSTALL TEMPORARY SILT FENCE OUTLET SEE SHT. D-604, #3
INSTALL TEMPORARY LINED DIVERSION SWALE SEE SHT. D-604, #4;
D-105, #6
INSTALL TEMPORARY INLET PROTECTION SEE SHT. D-604, #5
INSTALL TEMPORARY SKIMMER BASIN SEE SHT. D-604, #6,7,8
INSTALL RIPRAP DISSIPATOR PAD SEE SHT. D-605, #1
INSTALL CONCRETE WASHOUT PIT SEE SHT. D-605, #2
INSTALL TREE PROTECTION FENCING SEE SHT. D-605, #3
INSTALL ROLLED EROSION CONTROL MATTING SEE SHT. D-605, #4
INSTALL TEMPORARY ROCK PIPE INLET PROTECTION SEE SHT. D-605, #5
3
2
1
4
5
6
7
8
9
10
11
2
2
2
2
2
22
2
2
2 2
2
2
PROJECT AREA
ROLLINS RDWAG
S
T
A
F
F
R
D
CHRISTIANLIGHT RDWAKE
C
O
HARN
E
T
T
C
O
PROJECT VICINITY MAP
1" = 1000'
LAND DISTURBANCE NOTE:
A MAXIMUM OF 20 ACRES DISTURBANCE AT
ANYTIME SHALL BE OBSERVED DURINGCONSTRUCTION ACTIVITIES.
pappu.
4-29-21
0+001+002+003
+
0
0
4
+
0
0
5+006+007+007+25
0+00
1+002+002+91
FUTURE WATER MAIN(LOCATION TO BE DETERMINED)
FUTURE PUMP STATION SITE(NOT INCLUDED IN PROJECT)
FUTURE FORCE MAIN(NOT INCLUDED IN PROJECT)
STORMWATER
MANAGEMENT
AREA
BIO-RETENTION
8" CLASS 350 RJ DIP WL
8" CLASS 350 RJ DIP WL
8"
C
L
A
S
S
3
5
0
R
J
D
I
P
W
L
8"
C
L
A
S
S
3
5
0
R
J
D
I
P
W
L8" CLASS 350 RJ DIP WL8" CLASS 350 RJ DIP WL
8" CLASS 350 RJ DIP WL8
"
C
L
A
S
S
3
5
0
R
J
D
I
P
W
L
CONNECT TO FUTURE WATER MAINSTUB OUT
CONNECT TO FUTURE WATER MAINSTUB OUT
4" 22.5° BEND
8" 22.5° BEND
4" WATER METER
4" RPZ BACKFLOWPREVENTER
END HRW MAINTENANCE
8" RPZ BACKFLOWPREVENTER IN"HOT BOX"
1-4"X2" TEE1-2" GATE VALVE
2" IRRIGATION METER
2" IRRIGATION RPZ
2" GATE VALVE
8" 45° BEND
4" 45° BEND
4" 45° BEND
8" 45° BEND 1 - 8" TEE1 - 8" POST IND. VALVE
1 - 8"X6" TEE1 - FIRE HYD. ASSM.
8" 11.25° BEND
1 - 8"X6" TEE1 - FIRE HYD. ASSM.
8"X6" TEE2 - 4" 45° BEND
6" FDC6" 45° BEND
4" DOMESTIC WATER SUPPLY CONNECTIONCONTINUED ON PLUMBING PLAN
6" FIRE PROTECTION SUPPLY CONNECTIONCONTINUED ON FIRE PROTECTION PLAN
6" FIRE DEPARTMENT CONNECTION
CONTINUED ON FIRE PROTECTION PLAN
6" CLASS 350 RJ DIP WL
8" 45° BEND
1 - 8"X6" TEE1 - FIRE HYD. ASSM.
8" 22.5° BEND
8" 22.5° BEND
1 - 8"X6" TEE1 - FIRE HYD. ASSM.
8" 45° BEND
8" 45° BEND
1 - 8"X6" TEE1 - FIRE HYD. ASSM.
8" 45° BEND8" 45° BEND
1 - 8"X6" TEE
1 - FIRE HYD. ASSM.
1 - 8"X6" TEE1 - FIRE HYD. ASSM.
8" 45° BEND
8" 45° BEND
6" CLASS 350 RJ DIP WL
SSMH-01
RIM: 391.50INV IN: 387.62 8" NINV IN: 387.96 6" NW166.39
L
F
8
"
C900
DR
-18
PVC
@
1
.61%
SSMH-02RIM: 397.58INV IN: 390.40 8" NINV IN: 390.40 8" WINV OUT: 390.30 8" S
SSMH-03RIM: 397.50INV IN: 391.00 8" NINV OUT: 390.90 8" S
1
7
8
.
5
2
L
F
8
"
C
9
0
0
D
R
-
1
8
P
V
C
@
0
.
6
2
%
SSMH-04RIM: 399.00INV IN: 392.21 8" WINV OUT: 392.11 8" S
94.18 LF 8" C900 DR-18 PVC @ 0.61%
126.36 LF 8" C900 DR-18 PVC @ 1.84%76.35 LF 8" C900 DR-18 PVC @ 0.50%
SSMH-07
RIM: 399.50INV IN: 395.83 4" WINV IN: 395.83 4" SINV OUT: 395.49 8" E
128.13 LF 8" C900 DR-18 PVC @ 0.50%
163.35 LF 8" C900 DR-18 PVC @ 0.50%
SSMH-02B
RIM: 398.50INV IN: 392.00 4" SINV IN: 392.00 4" WINV IN: 392.00 4" NINV OUT: 391.85 8" E
1 - 8"X6" TEE1 - FIRE HYD. ASSM.
4" PVC SS 4" PVC SS
4" PVC SS 4" PVC SSGREASE TRAP
4" PVC SS
4" PVC SS
6" PVC SS
6" PVC SS
6" PVC SS 6
"
P
V
C
S
S
1
2
2
2
2
2
2
2
23
4
6
6
7
8
12
9
9
9
9
99
11
111111
1111
11
11
11
1111
11
11
11
11
11
1111
11
11
11
1111111111
11
1111
11
11
11 11 11
NORTHWEST HARNETT
ELEMENTARY SCHOOL
FFE: 400.25'
8" 22.5° BEND
4" PVC WL
4" PVC SS
4" PVC SS
ROLLINS
RD
(SR
1413
)60' PUB
L
IC
R/WFile: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 C501 UTILITY_2.dwg, By: trent, Plotted: Thu Jun 17, 2021 at 2:00pm( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
50 50 10025
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
C-501
OVERALL UTILITY
LAYOUT
UTILITY KEY NOTING:
SYM. DESCRIPTION SHEET REFERENCE
INSTALL FIRE LINE RPZ BACKFLOW PREVENTER SHT. D-607, #1-3
INSTALL FIRE HYDRANT ASSEMBLY SHT. D-607, #4
INSTALL FIRE DEPARTMENT CONNECTION SHT. D-607, #5
4" METER AND RPZ BACKFLOW ASSEMBLY SHT. D-608, #1
INSTALL TAPPING SLEEVE AND GATE VALVE SHT. D-607, #7
INSTALL GATE VALVE SHT. D-607, #8,9
INSTALL POST INDICATOR VALVE SHT. D-607, #12
INSTALL IRRIGATION RPZ BACKFLOW PREVENTER SHT. D-607, #13
INSTALL SANITARY SEWER MANHOLE SHT. D-609, #1-4
INSTALL INSIDE DROP MANHOLE SHT. D-609, #5
INSTALL SANITARY SEWER CLEANOUT/SERVICE SHT. D-609, #6,7
INSTALL 2" IRRIGATION WATER METER AND SERVICE SHT. D-608, #2
GENERAL NOTES:
1. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION
INDICATED ON THE GENERAL NOTES, LEGEND AND ABBREVIATIONS SHEET,
SHEET C-101 SHALL APPLY TO THIS PLAN.
2. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL TOWN OF ERWIN AND
HARNETT COUNTY STANDARDS AND SPECIFICATIONS.
3. SEE NOTES ON SHEETS D-608 AND D-609 FOR HARNETT COUNTY
SPECIFICATIONS FOR WATER AND SANITARY SEWER.
4. ALL DIP SANITARY SEWER PIPES MUST BE 401 OR APPROVED EPOXY COATED
EQUAL.
5. THE PUBLIC PORTION OF THE WATER MAIN WITHIN THE ROW SHOULD BE
PERMITTED UNDER HRW AND PRIVATE PORTION UNDER HARNETT COUNTY
BOARD OF EDUCATION.
6. ENGINEER OF RECORD WILL BE LKC ENGINEERING, PLLC.
PIPE SEPARATION NOTE:
THE FOLLOWING MINIMUM PIPE SEPARATION WILL BEMAINTAINED: 24 INCHES VERTICAL SEPARATION BETWEENCROSSING OF SANITARY SEWER AND STORM SEWERS, 24
INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER
(INCLUDING FORCE MAINS) AND WATER MAINS, OR 10 FEETHORIZONTAL SEPARATION BETWEEN SANITARY SEWER
(INCLUDING FORCE MAINS) AND WATER MAINS. IF THESESEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPEWILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONGENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FEETFROM WATER MAINS. THE CONTRACTOR SHALL RECEIVE
APPROVAL FROM THE ENGINEER IN THE FIELD BEFOREPAYMENT WILL BE MADE AT DUCTILE IRON PRICES.
2
2
pappa.
4--29-21
SANITARY SEWER PROFILE - 1
365
370
375
380
385
390
395
400
405
410
365
370
375
380
385
390
395
400
405
410
0+00391.34391.3411+00394.64394.6432+00396.82396.8173+00397.50397.4984+00398.61398.6105+00397.88397.8856+00399.25399.2547+00400.27400.2688+00
SANITARY SEWER PROFILE - 2
375
380
385
390
395
400
405
410
375
380
385
390
395
400
405
410
0+00396.43396.4331+00397.10397.0992+00397.47397.4693+00SSMH-01STA:0+00.00RIM:391.50INV IN:387.62INV IN:387.96166.39LF 8" C900
D
R
-
1
8
P
V
C
@
1
.
6
1
%SSMH-02STA:1+66.39RIM:397.58INV IN:390.40INV IN:390.40INV OUT:390.30SSMH-03STA:2+49.99RIM:397.50INV IN:391.00INV OUT:390.90SSMH-04STA:4+28.51RIM:399.00INV IN:392.21INV OUT:392.11SSC0-05STA:5+22.70RIM:399.56INV IN:392.78INV IN:392.78INV OUT:392.78SSC0-06STA:6+49.05RIM:399.52INV IN:395.10INV IN:395.10INV OUT:395.10SSMH-07STA:7+25.40RIM:399.50INV IN:395.83INV IN:395.83INV OUT:395.4983.60LF 8" C900 DR-18 PVC @ 0.60%
178.52LF 8" C900 DR-18 PVC @ 0.62%
94.18LF 8" C900 DR-18 PVC @ 0.61%
126.36LF 8" C900 DR-18 PVC @ 1.84%
76.35LF 8" C900 DR-18 PVC @ 0.50%SSMH-02STA:0+00.00RIM:397.58INV IN:390.40INV IN:390.40INV OUT:390.30128.13LF 8" C900 DR-18 PVC @ 0.50%SSC0-02ASTA:1+28.13RIM:398.33INV IN:391.04INV IN:391.04INV OUT:391.04163.35LF 8" C900 DR-18 PVC @ 0.50%SSMH-02BSTA:2+91.48RIM:398.50INV IN:392.00INV IN:392.00INV IN:392.00INV OUT:391.8518" RCP
8" DIP
FINISHGRADE
EXISTINGGRADE
8" DIP
FINISH GRADE
EXISTING GRADE10" PVC
12" PVC
File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 C502 UTILITY PROFILES.dwg, By: trent, Plotted: Mon Mar 08, 2021 at 4:53pm( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
50 50 10025
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
CONTRACT DOCUMENTS
No. Date Description
engineering, pllc
140 Auqa Shed Ct., Aberdeen, NC 28315
Office: 910-420-1437 Fax: 910-420-1438
lkcengineering.com License No. P-1095
C-502
SANITARY SEWER
PROFILES
2.5
0
5
VERTICAL SCALE
PIPE SEPARATION NOTE:
THE FOLLOWING MINIMUM PIPE SEPARATION WILL BEMAINTAINED: 24 INCHES VERTICAL SEPARATION BETWEENCROSSING OF SANITARY SEWER AND STORM SEWERS, 18INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER
(INCLUDING FORCE MAINS) AND WATER MAINS, OR 10 FEETHORIZONTAL SEPARATION BETWEEN SANITARY SEWER
(INCLUDING FORCE MAINS) AND WATER MAINS. IF THESESEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPEWILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONGENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FEETFROM WATER MAINS. THE CONTRACTOR SHALL RECEIVEAPPROVAL FROM THE ENGINEER IN THE FIELD BEFORE
PAYMENT WILL BE MADE AT DUCTILE IRON PRICES.
ftp.pn-
3 -L -21
11
6
1
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
4
8
3NOT TO SCALE
ASPHALT PAVEMENT SECTIONS
HEAVY DUTY
COMPACTED SUBGRADE
3" S-9.5BB
8" AGGREGATE BASE COURSE(ABC)(100% COMPACTED)
2" S-9.5B
6" AGGREGATE BASE COURSE(ABC)(100% COMPACTED)
COMPACTED SUBGRADE
LIGHT DUTY
2 NOT TO SCALE
CONCRETE PAVEMENT 18"12"
ASPHALTSURFACE#4 REBAR @ 16"O.C. AND AT BENDS
8" THK 3,500PSI CONCRETELIGHT BROOMFINISH
COMPACTEDSUBGRADE8" ABC
NOTE:
CONTROL JOINTS TO BE PLACE AT 20' INTERVALS
LIGHT BROOM
FINISH (TYP.)
18"R (TYP.)
SURFACE
EXPANSION JOINT
ASPHALT EXPANSION JOINT MATERIAL
12" WIDE AND FILL FROM BOTTOM OF
CONCRETE TO WITHIN 18" TO 14" BELOWTOP OF CONCRETE SURFACE
CONCRETE SIDEWALK
NOT TO SCALE
12" EXPANSION JOINT SHALL BEREQUIRED WHERE THE SIDEWALKJOINS ANY RIGID STRUCTURE ANDAT 40FT INTERVALS
3,500 PSI CONC.WITH FIBER
REINFORCEMENT
4" THICK CONC. SIDEWALK
- 6" THICK AT DRIVEWAYINSTALLATION
CURB AND
GUTTER - SEEPLANS FORSIZE AND TYPE
HANDICAP RAMP - STANDARD
NOTES:1. SEE NCDOT STD. NO. 848.05
2. CONTRACTOR SHALL MAINTAIN SIDEWALKTHICKNESS AND REIFORCEMENT INCONSTRUCTING THE HANDICAP RAMP.
NOT TO SCALE
HANDICAP PARKING SIGN
NOT TO SCALE
GS 20-37.6
3'-0"2'-6"5'-0" *NOTE 17'-0" *NOTE 2R7-8SIGN
R7-8A
SIGN
R7-8DSIGN
6" DIAM. STEELPIPE FILLEDWITH CONCRETE FINISHGRADE
15"
R7-8
R7-8D R7-8A
NOTE:
CONSTRUCTION AND INSTALLATION OF SIGNS ANDPOST SHALL COMPLY WITH GENERAL STATUTE20-37.6
COLORS:
LEGEND AND BORDER - GREENWITH WHITE SYMBOL ON BLUE BACKGROUNDBACKGROUND - WHITESIGN APPROVED FOR USEUNDER GENERAL STATUTE20-37.6 18"12"12"12"9"9"*NOTE 1 - MIN. HEIGHT TO WHERE PEDESTRIAN PATH DOES NOT PASS UNDER OR AROUND LOWEST SIGN*NOTE 2 - MIN. HEIGHT TO WHERE PEDESTRIAN PATH GOES BY, UNDER OR AROUND LOWEST SIGN
D-601
SITE DETAILS
LIGHT BROOM
FINISH (TYP.)
12" EXPANSION JOINT SHALL BEREQUIRED WHERE THE SIDEWALKJOINS ANY RIGID STRUCTURE AND
AT 40FT INTERVALS
3,500 PSI CONC.WITH FIBERREINFORCEMENT
4" THICK CONC. SIDEWALK- 6" THICK AT DRIVEWAY
INSTALLATION
18"R (TYP.)SURFACE
EXPANSION JOINT
ASPHALT EXPANSION JOINT MATERIAL
12" WIDE AND FILL FROM BOTTOM OF
CONCRETE TO WITHIN 18" TO 14" BELOWTOP OF CONCRETE SURFACE
CONCRETE SIDEWALK
NOT TO SCALE 5
NOT TO SCALE
ABC GRAVEL PAVEMENT/PAD SECTION
COMPACTED SUBGRADE
8" AGGREGATE BASE COURSE(ABC)(100% COMPACTED)
7 9HANDICAP RAMP AT DROP-OFF
NOT TO SCALE
12 13
NOT TO SCALE
HANDICAP RAMP - "IN-LINE" TYPE
GENERAL NOTES:
1. RAMP SLOPES SHALL NOT EXCEED 1:12.
2. RAMP SHALL CONFORM TO ALL CURRENT LOCAL, STATE AND FEDERAL
CODE REQUIREMENTS.3. CONTRACTOR SHALL INSTALL DETECTABLE WARNING DOMES ON ALLRAMPS PER NCDOT REQUIREMENTS.
PLAN VIEW
ISOMETRIC VIEW
CONC. CURBAND GUTTER
FIBER REINFORCED CONC.LANDING/SIDEWALK (TYP.)
FINISH
GRADE (TYP.)
FINISH GRADE (TYP.)DETECTABLE WARNINGDOMES (TYP.) (PER
NCDOT REQUIREMENTS)5'-0" MIN.2'
PAVEMENT (TYP.)
6" CURB
6" CURB
2% MAX2% MAX
8.3% MAX1:12 MAX
6" CURB (TYP.)
NOT TO SCALE
24" CONCRETE CURB AND GUTTER6"12"5"6"12"5"
6"
18"7"5"1"
6"
18"1"
NOTES:
1. ALL WORK AND MATERIALS SHALL
COMPLY WITH NCDOT SECTION 846
STANDARD SECTION
SPILL SECTION
NOT TO SCALE
HANDICAP RAMP - "IN-LINE" TYPE
GENERAL NOTES:
1. RAMP SLOPES SHALL NOT EXCEED 1:12.2. RAMP SHALL CONFORM TO ALL CURRENT LOCAL, STATE AND FEDERALCODE REQUIREMENTS.3. CONTRACTOR SHALL INSTALL DETECTABLE WARNING DOMES ON ALL
RAMPS PER NCDOT REQUIREMENTS.
PLAN VIEW
ISOMETRIC VIEW
6" CURB - WHERE
APPLICABLE
FIBER REINFORCED CONC.
LANDING/SIDEWALK (TYP.)
FINISH GRADE (TYP.)DETECTABLE WARNINGDOMES (TYP.) (PER
NCDOT REQUIREMENTS)4'-0" MIN.2'5'PAVEMENT (TYP.)6" CURB
10
NOT TO SCALE
TABLE TOP CROSSWALK
EDGE OF PAVEMENT
NOTES:
1. PAVEMENT MARKINGS TO MEET NCDOT, FEDERAL HIGHWAY ADMINISTRATION MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) STANDARDS.
2. CROSSWALK SHALL BE PLACED CENTERED ON PEDESTRIAN TRAVEL PATH.
3. TOP LAYER OF ASPHALT SHALL BE 1.5" OF S-9.5B.THE REMAINED SHALL BE I-19.0B ASPHALT.8'10'6'6'RAMP PAVEMENT 6" HIGH OVER 6'
RAMP PAVEMENT 6" HIGH OVER 6'
PAVEMENT FLUSH WITH
TOP OF CURB (TYP.)
DOUBLE SWING GATES
NOT TO SCALE 6'VARIES - SEE PLANS VARIES - SEE PLANS
HINGED LATCHINGMECHANISM PERMANUFACTURERS
SPECIFICATIONS
GATE LATCHES ON BOTHGATES PER MANUFACTURER'SSPECIFICATIONS
TRUSS ROD W/
TURNBUCKLEFRAME
8 GAUGE GALVANIZEDCHAIN LINK FABRIC6"PIPE FOR GATE LATCHES -2EA ON BOTH GATES (1 FORFULLY CLOSED GATE AND 1
FOR FULLY OPEN GATE - PERMANUFACTURERS SPECIFICATIONS 39"3"16"DIAMETER
CHAIN LINKFABRIC
FENCE POST
2" FOOTING
CONCRETEFOOTING
6' BLACK CHAIN LINK FENCE
NOT TO SCALE 39"3"16"DIAMETER
CHAIN LINKFABRIC
FENCE POST
2" FOOTING VARIES - SEE PLANS10' MAX.10' MAX.
TRUSS ROD W/TURNBUCKLE (OVER
4' HIGH FENCE)
2.5" INTERMEDIATEPOST
1.5" TOP RAIL3" CORNER ORTERMINAL POST
BOTTOM TENSION WIRE
8 GAUGE GALVANIZEDBLACK CHAIN LINK FABRIC
1.5" BRACE RAIL(OVER 4' HIGH FENCE)
FABRIC FLUSH
WITH GRADE CONCRETE
FOOTING
14 16 PEDESTRIAN SWING GATE
NOT TO SCALE 4'6'
HINGED LATCHING
MECHANISM PER
MANUFACTURERS
SPECIFICATIONS
FRAME
8 GAUGE BLACK
VINYL COATED
CHAIN LINK FABRIC
CONCRETE
FOOTING
NOT TO SCALE
PLAY AREA CONCRETE CURB
NOTES:
1. ALL CONCRETE WORK AND MATERIALS SHALL
COMPLY WITH NCDOT SECTION 846
5"1"12"6"6"6"3"R1/
2
"
R
11-12" MIN. CERTIFIED
PLAYGROUND MULCH
1% SLOPE TO
UNDERDRAINS
1715
2
PAPA
4-29-21
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
D-602
SITE DETAILS &
NCDOT DETAILS
1 TYPICAL ROADWAY CROSS-SECTION - 25' B-B ROADWAY
10.5'24"VARIES - SEE PLANS ASPHALTPAVEMENTCONCRETECURB & GUTTER10.5'24"VARIES - SEE PLANSASPHALTPAVEMENTCONCRETECURB & GUTTERASPHALTPAVEMENT
ABC
24" CONCRETECURB & GUTTERSHOULDER
6"
COMPACTED
SUBGRADE
2%4%4%
1:1
3:1MAX.3:1MAX.
NOTES:
1. PROVIDE A SMOOTH TRANSITION TO
EXISTING PAVEMENT.
2. ALL MATERIAL AND CONSTRUCTION
METHODS SHALL CONFORM TO LATEST
EDITION OF THE NCDOT STANDARD
SPECIFICATIONS.
PAVEMENT SCHEDULE
SYMBOL DESCRIPTION TYPE THICK
ASPHALT SURFACE COURSE S9.5B 3"
BASE COURSE ABC 8"
COMPACTED SUBGRADE
A1
B1
C
A1B1
C
NOT TO SCALE SHOULDERSHOULDER44 "STOP" SIGN
NOT TO SCALE
"DO NOT ENTER" SIGN
NOT TO SCALE
NOTE:
USE SIGN POST AT HEIGHT TO PUT SIGN AT 5' HIGHAND SECURE POST 3' IN GROUND.
"RIGHT TURN PROHIBITED" SIGN
NOT TO SCALE
"STOP AND DROP" SIGN
NOT TO SCALE
R7-8
COLORS:LETTERING & BORDER: WHITEBACKGROUND: GREEN 18"12"
NOT TO SCALE
CONCRETE FILLED BOLLARD
FILL PIPE WITHCONCRETE ANDDOME TOP
8"ID SCH 80STEEL PIPE
FINISH
GRADE
24"∅ CONCRETEFOOTING
8"8"8"6"6"4'-0"3'-0"TYPICAL ROADWAY CROSS-SECTION - 31' B-B ROADWAY
13.5'24"VARIES - SEE PLANS ASPHALTPAVEMENTCONCRETECURB & GUTTER13.5'24"VARIES - SEE PLANSASPHALTPAVEMENTCONCRETECURB & GUTTERASPHALTPAVEMENT
ABC
24" CONCRETE
CURB & GUTTERSHOULDER
6"
COMPACTEDSUBGRADE
2%4%4%
1:1
3:1MAX.3:1MAX.
NOTES:
1. PROVIDE A SMOOTH TRANSITION TO
EXISTING PAVEMENT.
2. ALL MATERIAL AND CONSTRUCTION
METHODS SHALL CONFORM TO LATEST
EDITION OF THE NCDOT STANDARD
SPECIFICATIONS.
PAVEMENT SCHEDULE
SYMBOL DESCRIPTION TYPE THICK
ASPHALT SURFACE COURSE S9.5B 3"
BASE COURSE ABC 8"
COMPACTED SUBGRADE
A1
B1
C
A1B1
C
NOT TO SCALE SHOULDERSHOULDER2 3
CONCRETE WHEELSTOP
NOT TO SCALE
CENTERLINE OF PARKINGSTALL AND WHEELSTOP
#6 REBAR#6 REBAR
2-#4 REBARS
EDGE OFPARKINGSURFACE
PRECASTCONCRETEWHEELSTOP
PARKINGSTRIPEPARKINGSTRIPE
PLAN VIEW
2-#6 REBARS THRU WHEELSTOPAND PAVEMENT MIN. 30" LONG.
PRECASTCONCRETEWHEELSTOP
3'-0" MIN. TOEDGE OF PARKING
10 38"PARKING SURFACE
AS SPECIFIED ONPLANS6" SECTION VIEW
6'-0"
5
Phipps
-2 -21
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
GRATE INLET
NOT TO SCALE
1'-7"1'-7"1'-7"1'-7"STORMDRAIN PIPESTORMDRAIN PIPECONCRETEAPRON
CONCRETEAPRON CONCRETEAPRON
6"6"6"
6"8"VARIES - SEENCDOT DWG 840.17SHEETS 1 AND 24'-0"
3'-2"
NOTES:1. ALL MATERIALS, DIMENSIONS AND CONSTRUCTION SHALLCONFORM TO NCDOT STD. DWG. 840.17 BRICK ORCONCRETE DROP INLETS TYPE "A".4" MIN.VARIES - SEE PLANS13" MIN.NOT TO SCALE
24"x36" FRAME AND GRATE 2'-314"1'-412"
112"
1'-758"
1'-412"
112"
1'-758"
1'-758"1'-758"
2"1 316"
PLAN VIEW
SECTION VIEW FRONT
SECTION VIEW SIDE
3'-6"2'-6"2"2"3'-134"
3'-6"
2'-134"
2'-6"
1"
1"1"
SECTION VIEW SIDE
SECTION VIEW FRONT 2"1"2" PLAN VIEW
NOT TO SCALE
STORM DRAIN PIPE NOTES
STORM DRAIN PIPE NOTES:
1. ALL STORM DRAINAGE SHALL BE RCP UNLESS OTHERWISE INDICATED.2. STORM DRAINAGE PIPING IN ANY NCDOT RIGHT-OF-WAY SHALL CLASS 3 ORBETTER AND STAMPED FOR NCDOT.3. STORM DRAINAGE PIPING IN NON-NCDOT RIGHT-OF-WAY UNDER PAVEMENTSHALL BE CLASS 3 OR BETTER, STAMP NOT REQUIRED.
4. CLASS 4 STORM DRAINAGE PIPING SHALL BE UTILIZED WHEN THERE IS TWO FEET OFCOVER OR LESS. ONE FOOT MINIMUM OF COVER IS REQUIRED.
STORM DRAIN PIPE SEPARATION NOTES:
1. THE MINIMUM VERTICAL CLEARANCE BETWEEN STORM DRAINAGE AND SANITARYSEWER LINES SHALL BE 24-INCHES UNLESS DUCTILE IRON IS SPECIFIED FOR THESANITARY SEWER LINES.2. STORM DRAINAGE PIPE HAVING WATER MAINS CROSSING OVER, OR UNDERMUST MAINTAIN A VERTICAL SEPARATION OF AT LEAST 24-INCHES.¬ IN
ADDITION, IF A WATER MAIN MUST CROSS UNDER A STORM DRAINAGE PIPE,
THE WATER MAIN SHALL BE MADE OF DUCTILE IRON FOR A MINIMUM OF 10FEET ON BOTH SIDES OF THE CROSSING.
NOT TO SCALE
TOP MOUNTED RECTANGULAR TRASH RACK
NOTES:1. SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER.2. TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY
MANUFACTURER.
3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'SRECOMMENDATIONS.4. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON-CORROSIVIEMATERIAL.
STRUCTURAL HDPE OR #4
REBAR TRASH RACK WITH6" SQUARE OPENINGS
RISER STRUCTURE
2" FROM EDGE OFRACK TO EDGE OF RISER
SEE PLANS FORRISER DIMENSIONS
D-603
DRAINAGE AND BMP
1 2
4
3NOT TO SCALE
CURB INLET
POINT OF "TOP
OF CURB" ELEV.
POINT OF "TOPOF CURB" ELEV.
POINT OF"RIM ELEV."12"12"3"3"2'-2"
2'-2"5/8"BACK OFCURB
EXTENSION FOR30" PIPES ANDLARGER
PAVEMENT
PAVEMENT
6"6"6"6"6"6"6"6"6"
ALL STEPS IN MANHOLES
SHALL BE COPOLYMERPOLYPROPYLENE PLASTIC,
REINFORCED WITH 12"GRADE 60 REINFORCED
MANHOLE STEPS @ 16"
O.C. IF DEPTH IS MORETHAN 3'-0"VARIES - SEE PLANSVARIES - SEE PLANSPRECAST
CONC. STRUCTURE
PRECASTCONCRETESTRUCTURE
12"-24" STORMDRAIN PIPE
30" OR LARGER
STORM DRAIN PIPE
STORMDRAIN PIPE
STORMDRAIN PIPE
VARIES
2'-2"VARIES -SEE NCDOT DWG840.02-840.02 PLAN VIEW SIDE VIEW FOR 12"-24"
REBAR
FRONT VIEW
SIDE VIEW FOR 30" AND LARGER
POINT OF"RIM ELEV."
REBAR
NOTES:1. ALL MATERIALS, DIMENSIONS AND CONSTRUCTION SHALLCONFORM TO NCDOT STD. DWGS. 840.01 AND 840.02BRICK OR CONCRETE CATCH BASINS.6"NOT TO SCALE
FRAME AND GRATE WITH HOOD3"INLETWALL
2'-1134"2'-1134"2'-1134"
TYPE "E" TYPE "F" TYPE "G" 978"978"FLOW FLOW
112"
FLOWFLOWFLOWFLOW
1"
112"
NOTES:
1. ALL MATERIALS, DIMENSIONS AND CONSTRUCTION SHALL
CONFORM TO NCDOT STD. DWGS. 840.03.
112"
78"
214"214"214"214"214"214"112"58"112"112"
112"
78"
ALIGN FRAME WITH INSIDE
EDGE OF WALL TO ALLOWFOR VERTICAL ADJUSTMENT
USE TYPE "E", "F","G" GRATE UNLESSOTHERWISE NOTED
32"43"
FRAME FOR
24"x36" GRATEAND 6" HOOD
24"x36" GRATE
6" HOOD ASSM.
5 7 NOT TO SCALE
DOWNSPOUT TO DRAINAGE TIE-IN
GENERAL NOTES:
1. SITE CONTRACTOR SHALL TIE DOWNSPOUTSINTO UNDERGROUND STORM DRAINAGE SYSTEM.
SITE CONTRACTOR SHALL COORDINATE WITHINSTALLER OF DOWNSPOUTS PRIOR TOBEGINNING WORK.2. CAST IRON BOOT SHALL BE USED IN ALLPERVIOUS SURFACE AREAS.3. CAST IRON BOOT SHALL BE SECURED TO
BUILDING WALL PER MANUFACTURER'SRECOMMENDATIONS.
BUILDING WALLAND FOUNDATION
COMPACTEDSUBGRADE
STORM DRAIN
TO SYSTEM
DOWNSPOUT
(BY OTHERS)SEE NOTE #1
CAST IRONDOWNSPOUTBOOT FINISH GRADE
9
DETAILS
NOT TO SCALE
STORM DRAIN MANHOLE
8" SOLID CONCRETEBRICK OR PRECAST
CONCRETE STRUCTURE
ALL STEPS IN MANHOLESSHALL BE COPOLYMERPOLYPROPYLENE PLASTIC,
REINFORCED WITH 12" GRADE60 REINFORCEMENT MANHOLESTEPS @ 16" O.C. IF DEPTHIS MORE THAN 3'-0"
6"x6" #6 WELDEDWIRE MESH (TYP.)
24" MANHOLE RINGAND COVER - SEEDETAIL
TAPEREDLIFTING HOLES
48"
NOTES:1. REINFORCEMENT TO MEET
ASTM C-478-722. WIRE MESH: ASTM A-185-694'-0" OR LESSVARIES2'-0", 3'-0", OR 4'-0"25'-0" MAX. WITH 4000 PSI PRECAST CONCRETE12" MAX.
#4 REBAR @12" O.C.E.W.
STORM DRAIN PIPE
NOT TO SCALE
24" STORM DRAIN MANHOLE RING AND COVER
RING
SUPPORTS (TYP.)
23 12"
22"
25"
33 14"7 12"1"FLANGE
RING
2-1" PICKINDENTIONS
24" CAST IRON
RING AND COVERH-20 LOAD RATED
6
11
NOT TO SCALE
STORM DRAIN CLEANOUT
4"x DRAIN SIZE
LONG SWEEP
COMBINATION WYE
PVC DRAIN
LINE FROM
DOWNSPOUT
PVC DRAIN
LINE FROM
DOWNSPOUT
FINISH
GRADE
FINISH
GRADE
THREADED
CLEANOUT PLUG
THREADED
CLEANOUT PLUG
CLEANOUT
COVER PLATE THREADED PLUG
2"-4" ABOVE
FINISH GRADE
IMPERVIOUS
INSTALLATION
IMPERVIOUS
MATERIAL
IMPERVIOUS
MATERIAL
TURF
MATERIAL
TURF
MATERIAL
TO OUTLETTO OUTLET
TURF
INSTALLATION
4"x DRAIN SIZE
LONG SWEEP
COMBINATION WYE
4" PVC PIPE4" PVC PIPE
NOT TO SCALE
UNDERDRAIN AT PLAY AREAS
NOTES:
1. ALL CONCRETE WORK AND MATERIALS SHALL
COMPLY WITH NCDOT SECTION 846
12"
PLAYGROUND MULCH
4" PERFORATED
HDPE PIPE
WRAPPED IN
DRAINAGE SOCK
- SEE PLANS
FOR PLACEMENT11"-12" MIN.12"NCDOT #57 WASHED STONE
WRAPPED IN NON-WOVEN
GEOSYNTHETIC FABRIC WITH
18" OVERLAP AT ALL SEAMS6"6"1% SLOPE1% SLOPE
SLOPE MULCH BED
1% TO ALL
UNDERDRAINS
8
10
NOT TO SCALE
BIORETENTION CELL
WATER TABLE 2FT DEPTHGRASS CELL4" WASHED SAND
8" #57 STONE
12" PONDING
GRASS CELL MIX:
75-85% MEDIUM TO COARSE
WASHED SAND
8-10% FINES (SILT/CLAY)
5-10% ORGANIC MATTER
5' MIN.
GRASS STRIP
8" GRAVEL
GRASS
4" CAPPEDCLEANOUT(4" ABOVE
GRADE MAX.)
4" PERFORATED PVCUNDERDRAIN @ 0.5%
WITH 5/8" HOLES WRAPPED
IN NON-WOVEN FILTERFABRIC W/18" OVERLAP
2FT MIN. DISTANCE
TO WATER TABLE
ELEVATION TOSEASONAL HIGHWATER TABLE
NON-PERFORATED
PVC UNDERDRAIN @ 0.5%
1
3
1
3
GRASSED CELL NOTES:
GRASS STAND SHALL BE ESTABLISHED
BY PLANTING SOD ONLY.
GRASS SHALL BE ESTABLISHED USING
COMMON BERMUDA SOD.
STORMWATER RISER STRUCTURE - BIORETENTION CELL-1
NOT TO SCALE
PLAN VIEW ORIFICE
3-8" ORIFICES
INV. EL: 378.00
ANTI-FLOTATION
DEVICE
CONCRETE
RISER
TRASH RACK
SEE DETAIL
OUTLET PIPE
CONCRETE
RISER
OUTLET PIPE
FRONT ELEVATION VIEW SIDE ELEVATION VIEW
OUTLET PIPE
CONCRETE
RISER
4'6"6"6"4'6"
2"2"2"2"
TRASH RACK
SEE DETAIL
TRASH RACK
SEE DETAIL
3-8"Ø ORIFICES
INV. EL: 378.00
BOTTOM SEDIMENT STORAGE
INV. EL: 376.00
TOP OF RISER EL: 379.75
3-8"Ø ORIFICES
INV. EL: 378.00
ANTI-FLOTATION INV. EL: 376.00
BOTTOM CONC. STRUCTURE EL: 374.50
OUTLET PIPE INV. EL: 376.00
BOTTOM SEDIMENT STORAGE
INV. EL: 376.00
TOP OF RISER EL: 379.75
ANTI-FLOTATION INV. EL: 376.00
BOTTOM CONC. STRUCTURE EL: 374.50
OUTLET PIPE INV. EL: 376.00
1' Min.NOTE:
CONTINUE T.R.M. ONE VERTICAL FOOT ABOVE
WEIR ELEVATION OR TOP OF BANK.
SEE
PLANS
NOT TO SCALE
SPILLWAY WITH TURF REINFORCING MAT (TRM)
TURF REINFORCING
MAT (TRM) ENKAMAT
7010 OR APPROVED
EQUAL
WEIR ELEV
(SEE PLANS)
COMPACTED
SUB-GRADE
12
13 14 15
2 2
2
2
PAPA-
4-29-21
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
CONTRACT DOCUMENTS
No. Date Description
engineering, pllc
140 Auqa Shed Ct., Aberdeen, NC 28315
Office: 910-420-1437 Fax: 910-420-1438
lkcengineering.com License No. P-1095
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
NOT TO SCALE
50' M
I
N
.
12' MIN.
EXISTING R
O
A
D
CONSTRUCTION SPECIFICATIONS:
1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS ANDOTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT.2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ONTHE PLANS AND SMOOTH IT.3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER
SUITABLE OUTLET.4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THEFOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE.
MAINTENANCE:
MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENTFROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODICTOPDRESSING WITH 2" STONE. AFTER EACH RAINFALL, INSPECT ANY
STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY.IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED ORTRACKED ONTO PUBLIC ROADWAYS.
2"-3" COURSE AGGREGATE@ 6" DEEP MINIMUM WITHFILTER FABRIC UNDERLINER
TEMPORARY SILT FENCE
NOT TO SCALE
MAINTENANCE:
INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRSIMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE,REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THENEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT
AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.
CONSTRUCTION SPECIFICATIONS:
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS.2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE.
(HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE).3. CONSTRUCT THE FILTER FABRIC FROM CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS.WHEN JOINTS ARE NECESSARY, SECURELY, FASTEN THE FILTER CLOTH ONLY AT SUPPORT POST WITH 4 FEET MINIMUMOVERLAP TO THE NEXT POST.
4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS.EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THE FABRIC ONTHE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILESTRENGTH.5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BEDRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES.
6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELYFASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUNDTENSILE STRENGTH.7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND
UPSLOPE FROM THE BARRIER (FIGURE 6.62A, NORTH CAROLINA EROSION AND SEDIMENTATION CONTROL DESIGNMANUAL)8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH.
9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE
BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE.
NATURAL
GROUND 24"18"-24"FILTERFABRIC
8" DOWNAND 4"
FORWARDALONG THETRENCH
8' MAX. STANDARD STRENGTH
FABRIC W/WIRE FENCE
6' MAX. STANDARD STRENGTHFABRIC W/O WIRE FENCE
STEEL POST
CROSS-SECTION
WIREFENCE
FILTERFABRIC
4" MIN.24"UPSLOPE
NATURALGROUND8" MIN.BACKFILL TRENCHAND COMPACT
TEMPORARY STRAW WATTLE OUTLET AT SILT FENCE
NOT TO SCALE
MAINTENANCE:
1. INSPECT OUTLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER)RAINFALL EVENT.2. CLEAR THE OUTLET OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOWFOR SUBSEQUENT RAINS.3. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE OUTLET DURING SEDIMENT REMOVAL.4. REPLACE WATTLE AS NEEDED.
CONSTRUCTION SPECIFICATIONS:
1. USE A MINIMUM 12" DIAMETER WATTLE WITH A MINIMUM LENGTH OF 10 FT.
2. USE 2" X 2" X 2 FT. LONG WOODEN STAKES.3. EXCAVATE A 1" TO 2" TRENCH FOR WATTLE TO BE PLACED.4. INSTALL A MINIMUM OF 2 UPSLOPE AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGETHE WATTLE TO THE GROUND.5. PROVIDE STAPLES MADE OF 0.125" DIAMETER STEEL WIRE FORMED INTO A "U" SHAPE ANDNOT LESS THAN 12" LENGTH.
6. INSTALL STAPLES APPROXIMATELY EVERY 12" ON BOTH SIDES OF WATTLE AND AT EACHEND TO SECURE IT TO THE SOIL.7. WATTLE INSTALLATION CAN BE ON OUTSIDE OF THE SILT FENCE AS DIRECTED.8. INSTALL TEMPORARY SEDIMENT FENCE IN ACCORDANCE WITH NCDENR REGULATIONS.9. OUTLETS TO BE PLACED AS SHOWN ON PLANS ALONG SILT FENCE.
8'
4'12" MIN.12" MIN.
2' (TYP.)
12" MIN. WATTLE
2"x2" WOODEN
STAKE (TYP.)
SILT FENCE
POST (TYP.)
SILT FENCE
SILT FENCE
POST (TYP.)12" MIN. WATTLE
SECTION VIEW
2"x2" WOODEN
STAKE (TYP.)
FLOW
FLOW
1"-2" TRENCH
STAPLES (TYP.)
TEMPORARY LINED DIVERSION SWALE AND BERM
NOT TO SCALE
RIPRAP CHANNELSEE PLANS FOR TYPE
CONSTRUCTION SPECIFICATIONS:
1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE
MATERIAL.
2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS.
3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION
PLUS THE SPECIFIED SETTLEMENT.
4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND
CLEANOUT.
5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE
LESS THAN 30 WORKING DAYS.
MAINTENANCE:
INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE
SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS
AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED,
REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND STABILIZE
IT.
4'4'
S75 STRAW LINER
COMPACTED
SOIL BERM
2' MIN.
BOTTOM WIDTHSEE PLANS
18"MIN.LINING HEIGHTSEE PLANS
1 3
4'4'
COMPACTED
SOIL BERM
2' MIN.
BOTTOM WIDTHSEE PLANS
18"MIN.LINING HEIGHTSEE PLANS
1 3
TEMPORARY INLET PROTECTION
NOT TO SCALE
NOTE:
INLET TOPS TO REMAIN OFF INLET
STRUCTURES WHILE INLET
PROTECTION IS IN PLACE.
MAINTENANCE:
INSPECT INLETS AT LEAST WEEKLY AND
AFTER EACH SIGNIFICANT (1/2" OR
GREATER) RAINFALL EVENT. CLEAR THE
MESH WIRE OF ANY DEBRIS OR OTHER
OBJECTS TO PROVIDE ADEQUATE FLOW
FOR SUBSEQUENT RAINS. TAKE CARE NOT
TO DAMAGE OR UNDERCUT THE WIRE
MESH DURING SEDIMENT REMOVAL.
REPLACE WATTLE AS NEEDED.
CONSTRUCTION SPECIFICATIONS:
1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET.
2. DRIVE 5' STEEL POST 2' INTO THE GROUND SURROUNDING THE INLET SPACE POSTS
EVENLY AROUND THE PERIMETER ON THE INLET, MAX. 4' APART.
3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO
THE STEEL POSTS AT THE TOP, MIDDLE AND BOTTOM. PLACING A 2' FLAP OF THE WIRE
MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED.
4. USE A MINIMUM 16" DIAMETER WATTLE WITH A LENGTH TO SURROUND WIRE MESH
HARDWARE CLOTH FITTING SNUG AGAINST THE GROUND.
5. USE 2" X 2" X 30" LONG WOODEN STAKES.
6. EXCAVATE A 1" TO 2" TRENCH FOR WATTLE TO BE PLACED.
7. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AT AN ANGLE TO WEDGE THE WATTLE TO THE
GROUND AND UP AGAINST THE HARDWARE CLOTH.
8. PROVIDE STAPLES MADE OF 0.125" DIAMETER STEEL WIRE FORMED INTO A "U" SHAPE AND
NOT LESS THAN 12" LENGTH.
9. INSTALL STAPLES APPROXIMATELY EVERY 12" ON BOTH SIDES OF WATTLE AND AT EACH
END TO SECURE IT TO THE SOIL.
10. WATTLE INSTALLATION SHALL BE ON THE OUTSIDE OF THE HARDWARE CLOTH.
11. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE
ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS.
12. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH GROUND COVER.
PLAN
SECTION A-A
FILTERED
WATER
INLET WALL 24"16"24"36"4' MAX.
19 GUAGE HARDWARE
CLOTH - 1/4" OPENINGS
STEEL POSTS
2' MAX.
16" MIN. WATTLE
INLET
A
16" MIN. WATTLE
APPROX. 22 LF (TYP.)
STEEL
POSTS (TYP.)
STAKE
LOCATIONS (TYP.)
STAPLES AT
JOINTS (TYP.)
A
SECTION VIEW
2"x2" WOODEN
STAKE (TYP.)
FLOW
FLOW
1"-2" TRENCH
STAPLES (TYP.)
STEEL POSTS
W/WIRE MESH (TYP.)16" MIN. WATTLE
D-604
EROSION CONTROLDETAILS
1 2
3 4
5
7 TEMPORARY SKIMMER BASIN
NOT TO SCALE
CONSTRUCTION SPECIFICATIONS:
1. SITE PREPARATIONS - CLEAR, GRUB, AND STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVETREES, VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL. DELAY CLEARING THE POOL AREA UNTILTHE DAM IS COMPLETE AND THEN REMOVE BRUSH, TREES, AND OTHER OBJECTIONABLE MATERIALS TO
FACILITATE SEDIMENT CLEANOUT. STOCKPILE ALL TOPSOIL OR SOIL CONTAINING ORGANIC MATTER FOR USEON THE OUTER SHELL OF THE EMBANKMENT TO FACILITATE VEGETATIVE ESTABLISHMENT. PLACE TEMPORARYSEDIMENT CONTROL MEASURES BELOW BASIN AS NEEDED.2. EMBANKMENT - TAKE FILL MATERIAL FROM THE APPROVED AREAS SHOWN ON THE PLANS. IT SHOULD BECLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS AND OTHER OBJECTIONABLE MATERIAL.
SCARIFY AREAS ON WHICH FILL IS TO BE PLACED BEFORE PLACING FILL. THE FILL MATERIAL. MUST CONTAIN
SUFFICIENT MOISTURE SO IT CAN BE FORMED BY HAND INTO A BALL WITHOUT CRUMBLING. IF WATER CAN BESQUEEZED OUT OF THE BALL, IT IS TOO WET FOR PROPER COMPACTION. PLACE FILL MATERIAL IN 6 TO 8 INCHCONTINUOUS LAYERS OVER THE ENTIRE LENGTH OF THE FILL AREA AND COMPACT IT. COMPACTION MAY BEOBTAINED BY ROUTING THE CONSTRUCTION HAULING EQUIPMENT OVER THE FILL SO THAT THE ENTIRESURFACE OF EACH LAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR TREAD TRACK OF HEAVY EQUIPMENT, OR
A COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENT TO AN ELEVATION 10 PERCENT HIGHER THANTHE DESIGN HEIGHT TO ALLOW FOR SETTLING.3. EMERGENCY SPILLWAY - INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE ACHIEVEMENT OFPLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO
THE SUCCESSFUL OPERATION OF THE EMERGENCY SPILLWAY.4. INLETS - DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE DIVERSIONS WITHOUTLET PROTECTION TO DIVERT SEDIMENT-LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE
BASIN TRAP EFFICIENCY (REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION).5. EROSION CONTROL - CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERTSURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED.STABILIZED THE EMERGENCY SPILLWAY EMBANKMENT AN ALL OTHER DISTURBED AREAS ABOVE THE CREST OF
THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER CONSTRUCTION. (REFERENCES: SURFACE STABILIZATION).6. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65, POROUS BAFFLES.7. SAFETY - SKIMMER BASINS MAY ATTRACT CHILDREN AND CAN BE DANGEROUS. AVOID STEEP SIDE SLOPES, ANDFENCE AND MARK BASIN WITH WARNING SIGNS IF TRESPASSING IS LIKELY. FOLLOW ALL STATE AND LOCAL
REQUIREMENTS.
MAINTENANCE:
INSPECT TEMPORARY SKIMMER BASINS AT LEAST WEEKLY AND AFTER EACH
SIGNIFICANT (1/2-INCH OR GREATER) RAINFALL EVENT AND REPAIRIMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITSORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO ONE-HALK THE DESIGNDEPTH. PLACE REMOVED SEDIMENT IN AN AREA WITH SEDIMENTCONTROLS.
CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION
DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT.MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH ANDOTHER DEBRIS FROM THE RISER AND POOL AREA.
INLET PIPE
FLOW
RIPRAPAPRON
2:1 MAX.SLOPE
POROUSBAFFLES SKIMMERDEVICE
SEDIMENTSTORAGE AREA
STACKED CONC. BLOCKSFOR SKIMMER - TO BE STACKEDABOVE SEDIMENT STORAGE AREA BASINDEPTHSTORAGEDEPTHSTAKE TO MARK SEDIMENT
LEVEL OF HALF FULL
BASIN BOTTOM 12" MIN.FREEBOARDMAX. 6"FLOW DEPTH5' WIDE WOVEN GEOSYNTHETIC
FABRIC OVER SPILLWAY
COMPACTEDEARTHEN DAM
HEIGHT OF BASIN
FLOW - MAX. 6"
2:1 MAX.
SLOPE
TO SKIMMER
OUTLET EMERGENCY SPILLWAY CROSS-SECTION
NOT TO SCALE
WATER SURFACEAREA ELEV. - 6"BELOW SPILLWAY
3:1 MA
X
.
3:1 MAX.
SPILLWAYWIDTH
TOP OF SPILLWAY
TOP OF DAM WOVEN GEOSYNTHETICFABRIC OVER SPILLWAY
CONSTRUCTION SPECIFICATIONS:
1. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE.2. INSTALL POSTS OR SAW HORSES ACROSS THE WIDTH OF THE SEDIMENT TRAP.3. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24", SPACED A MAXIMUM OF 4' APART, ANDINSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABRIC SHOULD BE 6" HIGHERTHAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 2" LOWER THAN THE TOP OFTHE BERMS.
4. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISHARGE POINT.BASINS LESS THAN THE TOP OF THE BERMS.5. WHEN USING POSTS, ADD A SUPPORT WIRE OR ROPE ACROSS THE TOP OF THE MEASURE TOPREVENT SAGGING.6. WRAP POROUS MATERIAL, LIKE JUTE BACKED BY COIR MATERIAL, OVER A SAWHORSE OR THE TOP
WIRE. HAMMER REBAR INTO THE SAWHORSE LEGS FOR ANCHORING. THE FABRIC SHOULD HAVEFIVE TO TEN PERCENT OPENINGS IN THE WEAVE. ATTACH FABRIC TO A ROPE AND A SUPPORTSTRUCTURE WITH ZIP TIES, WIRE OR STAPLES.7. THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A TRENCH OR PINNED WITH8" EROSION CONTROL MATTING STAPLES.8. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN.
POROUS BAFFLES
NOT TO SCALE
BAFFLE PLAN
STAKE TO SUPPORT WIRESUPPORT ROPE TOWIRE TO PREVENT SAGGING STEEL POST (TYP.)
COIR MESH OR SIMILAR,STAPLED OR TRENCHEDINTO BOTTOM OR SIDE
INLET FLOW
2
5
%
O
F
S
U
R
F
A
C
E
A
R
E
A
IN
L
E
T
Z
O
N
E
2
5
%
O
F
S
U
R
F
A
C
E
A
R
E
A
1
S
T
C
H
A
M
B
E
R
2
5
%
O
F
S
U
R
F
A
C
E
A
R
E
A
2
N
D
C
H
A
M
B
E
R
2
5
%
O
F
S
U
R
F
A
C
E
A
R
E
A
O
U
T
L
E
T
Z
O
N
E
BAFFLE (TYP.)
EARTHENEMBANKMENT
OUTLET
5' WIDTH
BAFFLE SECTION SUPPORT POST, 24"
INTO BOTTOM OR SIDE
MAINTENANCE:
1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIREDREPAIRS IMMEDIATELY.2. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE,TEAR DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY.3. REMOVE SEDIMENT DEPOSITS WHEN IT REACHED HALF FULL TO PROVIDE ADEQUATE STORAGE
VOLUME FOR THE NEXT RAIN AND TO REDUCE PROESSURE ON THE BAFFLES. TAKE CARE TOAVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEEDHALF THE DESIGNED STORAGE DEPTH.4. AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLEMATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT.
8
FLOATING SKIMMER
NOT TO SCALE
MAINTENANCE:
INSPECT SKIMMER AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (ONE-HALF INCH OR GREATER)
RAINFALL EVENT AND REPAIR IMMEDIATELY. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENTUNDERNEATH IT CAN BE EXCAVATED. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASINDOES NOT HOLD DOWN THE SKIMMER.IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING ON THEROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS
DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSOCHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO REMOVE THE DEBRIS.IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTIONCLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICEBEFORE REPOSITIONING THE SKIMMER.
FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE
TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE.
CONSTRUCTION SPECIFICATIONS:
1. PLACE THE BARREL (TYPICALLY 4-INCH SCHEDULE 40 PVC PIPE) ON A FIRM, SMOOTH FOUNDATION OFIMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE ASBACKFILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE PIP SPILLWAY IN 4-INCH LAYERSAND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY OF THE ADJACENT
EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM THE FIRM CONTACT WITH ITSFOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2-FEET OFCOMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT.IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAMAFTER THE EMBANKMENT IS COMPLETE.
2. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURERS INSTRUCTIONS, OR AS DESIGNED.
3. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLETOF THE BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMEROVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACHE A ROPE TO THE SKIMMER AND ANCHORIT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FORMAINTENANCE.
WATER SURFACE
ARM ASSM.
SCH 40PVC PIPE
BOTTOM SURFACE
FLEXIBLE
HOSE
PVC END CAP
PVC VENT
PIPE SUSPENDINGDEVICE
ORIFICE INLET WITHALUMINUM SCREEN
SCH 40PVC PIPE
PVC TEE
ORIFICE PLATE
"C" SHAPEDENCLOSURE
3 CONCRETEBLOCKS FORSUPPORT
6
PAPA
3 -2 -U
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
NOT TO SCALE
EROSION AND SEDIMENT CONTROL NOTES
1.UNLESS OTHERWISE INDICATED, ALL VEGETATION AND STRUCTURAL EROSION ANDSEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDINGTO MINIMUM STANDARDS AND SPECIFICATIONS OF THE EROSION & SEDIMENT CONTROLPLANNING & DESIGN MANUAL & ACCORDING TO THE SPECIFICATIONS.
2. ALL HARD SURFACE PUBLIC ROADS SHALL BE CLEAN AT THE END OF EACH WORK DAY.PROVIDE TEMPORARY CONSTRUCTION ENTRANCES AT THE LOCATIONS SHOWN ON THEPLANS OR AS OTHERWISE NECESSARY.3. THE LOCATION OF ALL EROSION AND SEDIMENT CONTROL MEASURES ARE APPROXIMATE.THESE DEVICES SHALL BE LOCATED TO ACHIEVE MAXIMUM BENEFIT. IF DURING
CONSTRUCTION THESE DEVICES ARE NOT SUFFICIENT TO ADEQUATELY CONTROL
EROSION AND SEDIMENTATION. ADDITIONAL EROSION CONTROL DEVICES SHALL BEINSTALLED AS DIRECTED BY THE ENGINEER.4. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED ANDDISPOSED OF WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION.
5. CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO PREVENT SEDIMENT (GENERATED BYCONSTRUCTION OR EROSION) FROM ENTERING STREAMS. CONSTRUCTION VEHICLES WILLNOT BE ALLOWED IN FLOWING STREAM CHANNELS OR TO DAMAGE THEIR BANKS.
TEMPORARY STREAM CROSSINGS SHALL BE INSTALLED IN ALL FLOWING STREAMS WHICH
WILL HAVE CONSTRUCTION TRAFFIC CROSSING THEM.6. STOCKPILING OF EXCESS MATERIALS IN WETLAND AREAS IS NOT ALLOWED.7. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED
AFTER EACH RAINFALL OR WEEKLY, WHICHEVER IS MORE FREQUENT (AT LEAST DAILY
DURING PERIODS OF PROLONGED RAINFALL). CONTRACTOR SHALL CLEAN AND REPAIRACCORDINGLY.
NOT TO SCALE
SEED BED PREPARATION
1.RIP THE ENTIRE AREA TO 6" DEPTH.2. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACEREASONABLY SMOOTH AND UNIFORM.3. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE IN ACCORDANCE WITH
"SEEDING SCHEDULE" AND MIX WITH SOIL.4. CONTINUE TILLAGE UNTIL A WELL-PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED ISPREPARED 4 TO 6 INCHES DEEP.5. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDINGEQUIPMENT OR CULTIPACK AFTER SEEDING. SEED ACCORDING TO "SEEDING SCHEDULE."
6. MULCH IN ACCORDANCE WITH "SEEDING SCHEDULE" IMMEDIATELY AFTER SEEDING.
7. INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE "SEEDINGSCHEDULE". MAKE NECESSARY REPAIRS AND RESEED WITHIN THE PLANTING SEASON, IFPOSSIBLE, OR THE DAMAGED AREA SHALL BE REESTABLISHED FOLLOWING THE ORIGINALLIME, FERTILIZER, AND SEEDING REQUIREMENTS.
NOT TO SCALE
SEEDING SCHEDULE
TEMPORARY SUMMER SEED MIX
(TO BE FOLLOWED BY PERMANENT FALL SEED MIX)
DATES SPECIES RATE: LB/ACRE
MAR 1 - SEP 1 GERMAN MILLET 120
TEMPORARY WINTER SEED MIX
(TO BE FOLLOWED BY PERMANENT FALL SEED MIX)
SEP 1 - MAR 1 WINTER RYE (GRAIN)200
KOBE LESPEDEZA 120
PERMANENT SPRING SEED MIX
MAR 1 - JUL 1 PENSICOLA BAHIAGRASS 60
COMMON BERMUDA 25
SERICEA LESPEDEZA 30
PERMANENT FALL SEED MIX
SEP 1 - NOV 1 COMMON BERMUDA 30
SERICEA LESPEDEZA 30
KOBE LESPEDEZA 10
NOTES:
1. TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN 14 WORKING
DAYS AND SUBJECT TO FURTHER DISTURBANCE. PERMANENT SEED MIX SHALL BE CHECKEDFOR ADEQUACY ON JULY 15. AN ADEQUATE COVER SHALL HAVE 50 SPRIGS OF BERMUDA ORSERICEA LESPEDEZA PER ONE SQUARE FOOT.
SOIL AMENDMENTS:
1. TO BE INCORPORATED INTO THE TOP 3 INCHES OF SOIL IN AREAS WITH SLOPES 2:1 ORFLATTER
x APPLY FERTILIZER (10-10-10) AT A RATE OF 1000 LB/ACRExAPPLY LIME (GROUND AGRICULTURAL LIMESTONE) AT A RATE OF 4000 LB/ACRE *
x APPLY SUPERPHOSPHATE (0-49-0) AT A RATE OF 200 LB/ACRE ** REQUIRED FOR PERMANENT SEED MIX ONLY
MULCH:
APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER.ANCHOR MULCH WITH ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT ARATE OF 400 GAL./ACRE
WATER:
MINIMUM OF 1" OF RAINFALL A WEEK (IF NOT SUPPLIED NATURALLY, CONTRACTOR SHALLSUPPLY THE REMAINING AMOUNT UNTIL GROUND COVER HAS BEEN ESTABLISHED).
MAINTENANCE:
REFERTILIZE IN THE SECOND YEAR UNLESS THE GROWTH IS FULLY ADEQUATE.MOW WHEN THE AVERAGE PLANT HEIGHT EXCEEDS 6 INCHES.RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY.
NOT TO SCALE
EROSION CONTROL CONSTRUCTION SEQUENCE AND NOTES
1.OBTAIN COPY OF APPROVED SOIL AND EROSION CONTROL PLAN.
2. CONTRACTOR SHALL NOTIFY NCDEQ - DIVISION OF LAND QUALITY 48 HOURS PRIOR TO
CONSTRUCTION.
3. INSTALL ROCK CHECK DAMS, WADDLES, SILT FENCE, SILT BASINS, INLET PROTECTION
AND/OR OTHER MEASURES AS SHOWN ON THE APPROVED PLAN.
4. CALL FOR ONSITE INSPECTION BY THE SEDIMENTATION AND EROSION CONTROL
INSPECTOR.
5. BEGIN CLEARING, GRUBBING, AND GRADING. MAINTAIN MEASURES AS REQUIRED.
6. BEGIN TRENCHING FOR WATER MAIN. MAINTAIN MEASURES AS REQUIRED.
7. PROTECT CULVERTS WITH SILT FENCE, GRAVEL FILTERS, SEDIMENT TRAPS OR OTHERAPPROVED MEASURES AS SHOWN ON THE PLAN.
8. WHEN AVERAGE HEIGHT OF TURF IN AN AREA BECOMES 5 INCHES, MOW TO A 3 INCHHEIGHT.
9. AS CONSTRUCTION PROGRESSES, INSTALL ANY PERMANENT EROSION CONTROLMEASURES AS NOTED ON PLANS.
10. MAINTAIN EROSION CONTROL DEVICES PERIODICALLY AFTER ALL RUNOFF PRODUCINGRAINS.
11. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS STABILIZED, CALL FOR ONSITEINSPECTION BY THE SEDIMENTATION AND EROSION CONTROL OFFICE.
12. IF THE SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCING, SEDIMENTBASINS, ETC., AND SEED, PAVE, OR RIP-RAP RESULTING DISTURBED AREAS.
13. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION.
14. TO SCHEDULE AN ONSITE INSPECTION, CALL NCDEQ LAND QUALITY SECTION AT (919)791-4200, RALEIGH REGIONAL OFFICE.
* PROVIDE 1" OF WATER WEEKLY BY NATURAL OR ARTIFICIAL MEANS *
D-605
EROSION CONTROL
1 2 3RIPRAP VELOCITY DISSIPATOR
NOT TO SCALE
PIPE OUTLET
FLOW
VARIES -SEE PLANSRIPRAP - SEEPLANS FOR CLASS
6"
NON-WOVEN GEOSYNTHETIC
FILTER FABRIC UNDERLINER
CONSTRUCTION SPECIFICATIONS:
1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES ANDGRADES AS SHOWN IN THE PLANS. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THEDENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ONUNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS.2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON
THE PLANS.3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTEDFROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THERIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALLCONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A
MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH.
4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER.5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER.6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR,HIGHLY WEATHER-RESISTANT AND WELL GRADED.7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. MAKE THE TOP OF
THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT.
8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLYSTRAIGHT THROUGHOUT IT LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE ITIN THE UPPER SECTION OF THE APRON.9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION.
MAINTENANCE:
INSPECT RIPRAP OUTLET STRUCTURES AFTER HEAVY RAINS TO SEE IF ANY EROSION AROUND ORBELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL
NEEDED REPAIRS TO PREVENT FURTHER DAMAGE.
VARIES -SEE PLANS
VARIES -SEE PLANSSTORM DRAINRCP PIPE
STORM DRAINRCP FES
RIPRAP - SEE
PLANS FOR CLASS
4 5
6
NOT TO SCALE
CONCRETE WASHOUT PIT
AA
24" Ø COIR
WATTLE
MAXIMUM DEPTH OF CONCRETE
WASHOUT WATER SHALL BE 50%
OF FILTER RING HEIGHT
2"x2"x36" MIN.
WOOD STAKES
@ 5' O.C.
SECTION A-A
PLAN VIEW
2"x2"x36" MIN.
WOOD STAKES
@ 5' O.C.
24" Ø COIR
WATTLE WITH
4' MIN. OVERLAP
ON UPSLOPE
SIDE OF RING
NOTES:
1. INSTALL ON FLAT GRADE FOR OPTIMUM PERFORMANCE.
2. 18" DIAMETER WATTLE MAY BE STACKED ON TOP OF DOUBLE
24" DIAMETER WATTLES FOR ADDED HEIGHT IF NEEDED.
NOT TO SCALE
GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING AND MAINTAINING
TREE PROTECTION FENCING AROUND ALL TREES WITHIN THE VICINITY OF
THE CONSTRUCTION ACTIVITY SO AS TO PREVENT ROOT SYSTEM DAMAGE.2. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO BEGINNINGANY CONSTRUCTION OR OTHER DEVELOPMENT ACTIVITY, AND SHALL BEMAINTAINED AT ALL TIMES THROUGHOUT THE DURATION OF THE PROJECTUNTIL FINAL SITE INSPECTION.
3. TREE PROTECTION FENCING SHALL BE INSTALLED NO CLOSER THAN12-INCHES OUTSIDE THE TREE DRIP-LINE. AREAS LOCATED WITHIN THELIMITS OF THE TREE PROTECTION FENCING SHALL BE CONSIDERED A TREEPROTECTION ZONE. NO CONSTRUCTION, GRADING, EQUIPMENT, MATERIALSTORAGE, OR ANY OTHER ACTIVITY SHALL BE ALLOWED WITHIN THE TREEPROTECTION ZONES.
4. SIGNS INDICATING THE TREE PROTECTION ZONES SHALL BE INSTALLEDALONG THE PERIMETER OF THE TREE PROTECTION FENCING. SPACE SIGNSA MINIMUM OF ONE EVERY 300-FT. THE SIZE OF EACH SIGN SHALL BE AMINIMUM OF 2' X 2' AND BE VISIBLE FROM BOTH SIDES OF THE FENCE.SIGNS SHALL DISPLAY THE FOLLOWING LANGUAGE: "KEEP OUT: TREE
PROTECTION ZONE"
5. ALL TREE PROTECTION MEASURES SHALL BE SUBJECT TO INSPECTIONWITHOUT NOTICE.
TREE PROTECTION FENCING
1' MIN. FROMDRIP LINE
4' MIN./8' MAX.STEEL POST (TYP.)2'4'NOT TO SCALE
TEMPORARY ROCK PIPE INLET PROTECTION
MAINTENANCE:
1. INSPECT ROCK PIPE AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER)RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENTSTORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATEDDISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING.
2. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOEMUST BE REPLACED IMMEDIATELY.3. AFTER ALL SEDIMENT-PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THESTRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THEADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER.
CONSTRUCTION SPECIFICATIONS:
1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER AND DISPOSAL OF SPOIL.
2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMICIRCLE AROUND THE PIPE INLET. THE STONE
SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THEMINIMUM CREST WIDTH OF THE RIPRAP SHOULD BE 3', WITH A MINIMUM BOTTOM WIDTH OF11'. THE MINIMUM HEIGHT SHOULD BE 2', BUT ALSO 1' LOWER THAN THE SHOULDER OF THEEMBANKMENT OR DIVERSIONS.3. A 1' THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OFTHE RIPRAP.
4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE
HORSESHOE 18" BELOW NATURAL GRADE.5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION ANDESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITHGROUND COVER.
7 8 9
NOT TO SCALE
ROLLED EROSION CONTROL PRODUCT
$
#
1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's),
INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST
BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP's IN A 6" (15 CM) DEEP X
6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF RECP's EXTENDED
BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW
OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE
TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO
COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP's BACK OVER
SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF
THE RECP's.
3. ROLL THE RECP's (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP's WILL
UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE
SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE
LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT
SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED
DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5
CM - 12.5 CM) OVERLAP DEPENDING ON RECP's TYPE.
5. CONSECUTIVE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END
(SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH
OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE RECP's
WIDTH.
NOTE:
IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN
6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP's.
CONSTRUCTION SPECIFICATIONS:
1. EVEN IF PROPERLY DESIGNED, IF NOT PROPERLY DESIGNED, RECP'S WILL PROBABLY NOT
FUNCTION AS DESIRED. PROPER INSTALLATION IS IMPERITIVE. EVEN IF PROPERLY INSTALLED, IF
NOT PROPERLY TIMED AND NOURISHED, VEGETATION WILL PROBABLY NOT GROW AS DESIRED.
PROPER SEED/VEGETATION SELECTION IS ALSO IMPERATIVE.
2. GRADE THE SURFACE OF INSTALLATION AREAS SO THAT THE GROUND IS SMOOTH AND LOOSE.
WHEN SEEDING PRIOR TO INSTALLATION, FOLLOW THE STEPS FOR SEED BED PREPARATION, SOIL
AMMENDMENTS, AND SEEDING IN SURFACE STABILIZATION, 6.1. ALL GULLIES, RILLS, AND ANY
OTHER DISTURBED AREAS MUST BE FINE GRADED PRIOR TO INSTALLATION. SPREAD SEED
BEFORE RECP INSTALLATION. (IMPORTANT: REMOVE ALL LARGE ROCKS, DIRT CLODS, STUMPS,
ROOTS, GRASS CLUMPS, TRASH, AND OTHER OBSTRUCTIONS FROM THE SOIL SURFACE TO
ALLOW FOR DIRECT CONTACT BETWEEN THE SOIL SURFACE AND THE RECP.)
3. TERMINAL ANCHOR TRENCHES ARE REQUIRED AT RECP ENDS AND INTERMITTENT TRENCHES
MUST BE CONSTRUCTED ACROSS CHANNELS AT 25-FOOT INTERVALS. TERMINAL ANCHOR
TRENCHES SHOULD BE A MINIMUM OF 12 INCHES IN DEPTH AND 6 INCHES IN WIDTH, WHILE
INTERMITTENT TRENCHES NEED BE ONLY 6 INCHES DEEP AND 6 INCHES WIDE.
MAINTENANCE:
1. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH
SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT, REPAIR IMMEDIATELY.
2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR
BENEATH THE RECP.
3. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND
SHALL BE REPAIRED AND STAPLED.
4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED
AND THE ERODED AREA PROTECTED.
5. MONITOR AND REPAIR THE RECP AS NECESSARY UNITL GROUND COVER IS ESTABLISHED.
2"-5"12"
6"6"3"
PAPA
3 -2-21
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
CONTRACT DOCUMENTS
No. Date Description
engineering, pllc
140 Auqa Shed Ct., Aberdeen, NC 28315
Office: 910-420-1437 Fax: 910-420-1438
lkcengineering.com License No. P-1095
NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCG01 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCG01 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4. Provide ponding area for containment of treated Stormwater before discharging
offsite.
5. Store flocculants in leak-proof containers that are kept under storm-resistant cover
or surrounded by secondary containment structures.
HAZARDOUS AND TOXIC WASTE
1. Create designated hazardous waste collection areas on-site.
2. Place hazardous waste containers under cover or in secondary containment.
3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.
EQUIPMENT AND VEHICLE MAINTENANCE
1. Maintain vehicles and equipment to prevent discharge of fluids.
2. Provide drip pans under any stored equipment.
3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4. Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5. Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. Never bury or burn waste. Place litter and debris in approved waste containers.
2. Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3. Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4. Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5. Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6. Anchor all lightweight items in waste containers during times of high winds.
7. Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8. Dispose waste off-site at an approved disposal facility.
9. On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2. Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3. Contain liquid wastes in a controlled area.
4. Containment must be labeled, sized and placed appropriately for the needs of site.
5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1. Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2. Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3. Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2. Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3. Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4. Do not stockpile these materials onsite.
CONCRETE WASHOUTS
1. Do not discharge concrete or cement slurry from the site.
2. Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3. Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4. Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7. Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8. Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9. Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10. At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
EARTHEN STOCKPILE MANAGEMENT
1. Show stockpile locations on plans. Locate earthen-material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3. Provide stable stone access point when feasible.
4. Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
Site Area Description Timeframe variations
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW Zones
-10 days for Falls Lake Watershed unless
there is zero slope
Stabilize within this
many calendar
days after ceasing
land disturbance
7
7
7
14
None
None
(a) Perimeter dikes,
swales, ditches, and
perimeter slopes
(b) High Quality Water
(HQW) Zones
(c) Slopes steeper than
3:1
If slopes are 10' or less in length and are
not steeper than 2:1, 14 days are
allowed
(d) Slopes 3:1 to 4:1
(e) Areas with slopes
flatter than 4:1 14
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW
Zones
-10 days for Falls Lake Watershed
D-606
NCGO1STORMWATER DETAILS
NCG01 SELF-INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION A: SELF-INSPECTION
Self-inspections are required during normal business hours in accordance with the table
below. When adverse weather or site conditions would cause the safety of the inspection
personnel to be in jeopardy, the inspection may be delayed until the next business day on
which it is safe to perform the inspection. In addition, when a storm event of equal to or
greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be
performed upon the commencement of the next business day. Any time when inspections
were delayed shall be noted in the Inspection Record.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION B: RECORDKEEPING
1. E&SC Plan Documentation
The approved E&SC plan as well as any approved deviation shall be kept on the site. The
approved E&SC plan must be kept up-to-date throughout the coverage under this permit.
The following items pertaining to the E&SC plan shall be kept on site and available for
inspection at all times during normal business hours.
2. Additional Documentation to be Kept on Site
In addition to the E&SC plan documents above, the following items shall be kept on the
site and available for inspectors at all times during normal business hours, unless the
Division provides a site-specific exemption based on unique site conditions that make
this requirement not practical:
(a) This General Permit as well as the Certificate of Coverage, after it is received.
(b) Records of inspections made during the previous twelve months. The permittee shall
record the required observations on the Inspection Record Form provided by the
Division or a similar inspection form that includes all the required elements. Use of
electronically-available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard-copy records.
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION C: REPORTING
1. Occurrences that Must be Reported
Permittees shall report the following occurrences:
(a) Visible sediment deposition in a stream or wetland.
(b) Oil spills if:
x They are 25 gallons or more,
x They are less than 25 gallons but cannot be cleaned up within 24 hours,
x They cause sheen on surface waters (regardless of volume), or
x They are within 100 feet of surface waters (regardless of volume).
(c) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(d) Anticipated bypasses and unanticipated bypasses.
(e) Noncompliance with the conditions of this permit that may endanger health or the
environment.
2. Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Department's Environmental Emergency Center personnel at (800)
858-0368.
3. Documentation to be Retained for Three Years
All data used to complete the e-NOI and all inspection records shall be maintained for a period
of three years after project completion and made available upon request. [40 CFR 122.41]
PART II, SECTION G, ITEM (4)
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather).
Non-surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:
(a) The E&SC plan authority has been provided with documentation of the non-surface withdrawal and the specific time periods or conditions in which it will occur. The non-surface withdrawal
shall not commence until the E&SC plan authority has approved these items,
(b) The non-surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit,
(c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems,
(d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above,
(e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and
(f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States.
Pharr
3-2-21
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
CONTRACT DOCUMENTS
No. Date Description
engineering, pllc
140 Auqa Shed Ct., Aberdeen, NC 28315
Office: 910-420-1437 Fax: 910-420-1438
lkcengineering.com License No. P-1095
D-607
WATER DETAILS
7
3
1 2
54
8 9
NOT TO SCALE
REDUCE PRESSURE ZONE BACKFLOW PREVENTER ASSEMBLY
GENERAL NOTES:
1. SEE PLANS FOR SIZE OF RPZ BACKFLOW PREVENTER.
2. RPZ BACKFLOW PREVENTER SHALL BE WATTS SERIES 909 OS&Y OR AN APPROVED EQUAL.
3. INSULATED ENCLOSURE SHALL BE "HOT BOX" OR AN APPROVED EQUAL SIZE INACCORDANCE WITH THE BACKFLOW PREVENTER.4. RPZ SHALL BE SUITABLE FOR HIGH PRESSURE OPERATION.5. SEE MANUFACTURER'S SPECIFICATIONS.6. ALL VALVES SHALL BE ULFM APPROVED WITH STRAINER.
7. THE FIRE LINE/LOOP RPZ SHALL HAVE DETECTOR CHECK CAPABILITIES.
8" CONCRETESLAB WITH WWF
M.J. 90° BEND WITH
MEGA-LUG RESTRAINT (TYP.)
DUCTILE
IRON PIPE
PIPE
SUPPORT (TYP.)
FLANGED90° BEND FLANGED90° BEND
DUCTILE
IRON PIPE
FLANGEDGATE VALVE FLANGEDGATE VALVE
"HOT BOX" INSULATEDENCLOSURE ORAPPROVED EQUAL
FLOWFLOW
FLOW FLOW
SET TOP OF SLAB2" ABOVE FINISH GRADE
ULFM APPROVED REDUCEPRESSURE ZONE BACKFLOWPREVENTER ASSEMBLY
FLANGED
GATE VALVE
FLANGED
GATE VALVE
FLANGED90° BEND FLANGED90° BEND
"HOT BOX" INSULATEDENCLOSURE OR
APPROVED EQUAL
FINISH GRADE
SLAB SHALL EXTEND6" BEYOND SIZE OFENCLOSURE ON ALLSIDES (TYP.)
NOT TO SCALE
"HOT BOX" ENCLOSURE - HEATED
CONCRETESLAB
DRAIN PORT
ENCLOSUREBASE
HINGED
ENCLOSURE LID
INTERIORANCHOR (TYP.)
LIFTHANDLE (TYP.)
LOCK HASP
HEATER
ASSM.
ELECTRICALSERVICEGAS SHOCK (TYP.)
GENERAL NOTES:
1. SIZE OF ENCLOSURE PER MANUFACTURER'SSPECIFICATIONS FOR SIZE OF BACKFLOW.
2. HEATER SHALL BE 120V, SINGLE PHASE WITH
WATTAGE PER MANUFACTURER'SSPECIFICATIONS.3. INSTALLATION SHALL BE PER MANUFACTURER'SGUIDELINES AND SPECIFICATIONS.
NOT TO SCALE
BFP ENCLOSURE - INSULATED
GENERAL NOTES:
1. ENCLOSURE IS DESIGNED FOR PIPES OF 0.75"-2" DIAMETER.
2. SIZE OF ENCLOSURE PER MANUFACTURER'S SPECIFICATIONS FOR SIZE OF BACKFLOW.3. ENCLOSURE SHALL HAVE A LOCKING MECHANISM TO SECURE BFP.4. INSTALLATION SHALL BE PER MANUFACTURER'S GUIDELINES AND SPECIFICATIONS.
CONCRETESLAB - 4"
3000 PSI
DRAIN PORT
MOUNTINGFLANGE
INSULATEDENCLOSURE
NOT TO SCALE
STORZ FIRE DEPARTMENT CONNECTION 30" MIN.24"FIRE DEPARTMENT CONNECTION
5" STORZ CONNECTION W/30°BEND TO GROUND
2'x2'x6" THICK SQUARECONCRETE BASE WITHWWF REINFORCEMENTAND ANCHOR BOLTS
IDENTIFICATION PLATE
4" 90° BEND
4" TEE
4" WAFER CHECKVALVE W/BALL DRIP{USE RESTRAINTJOINT FITTINGS7 CU. FT. OF #57STONE FOR DRAINPIT AT BALL DRIP
GATE VALVE IN PAVEMENT
CAST IRONVALVE BOX
GATE VALVE
24"x24"x6" THK.
CAST-IN-PLACE
CONCRETE PAD
NOTE:
ALL GATE VALVES SHALL BEPLACED ON AN 80 LB OF
SACRETE.
NOT TO SCALE
BASE COURSE
MIN. 2" S9.5BASPHALT PAVEMENT
10
11 12 13NOT TO SCALE
PIPE TRENCH3' MIN. COVERPIPEZONEMIN. EXCAVATEDTRENCH WIDTH
PIPE WIDTH + 12"
BEDDING
LIGHTLYCONSOLIDATEDBACKFILL
FINALBACKFILL
NOTES:
1. BEDDING SHALL BE 4" MINIMUM LOOSE SOIL,
FREE FROM ROCKS, AND SHALL PROVIDEUNIFORM SUPPORT FOR THE FULL LENGTH OFPIPE.2. BACKFILL PER NCDOT AND TOWN OF ERWINSTANDARDS.
PIPE
#12 COPPERTRACER WIRE
OVER NON
FERROUS PIPE
PIPE WIDTH
4" MIN.
NOT TO SCALE
POST INDICATOR VALVE
POST INDICATORWITH TAMPER SWITCH
4" PAINTED STEELBOLLARD FILLEDWITH CONCRETE
3,000 PSI
CONCRETE (TYP.)18"6"18"48"18"
GATE VALVE
NOT TO SCALE
RPZ BACKFLOW PREVENTER - IRRIGATION
FLOW
OUTLETSHUT-OFFINLETSHUT-OFF
SECOND
CHECKFIRSTCHECK
PLAN VIEW 12" MIN.30" MAX.INLET
SHUT-OFF OUTLETSHUT-OFF
FIRSTCHECK
SECONDCHECK
FLOW
FINISH
GRADE
COMPACTEDSUBGRADE
GENERAL NOTES:
1. ASSEMBLY SHALL BE HOUSED IN AN ALUMINUM INSULATED ENCLOSURE.2. ASSEMBLY SHALL BE WATTS SERIES 009QT OR APPROVED EQUAL.3. SEE PLANS FOR SIZE.
SECTION VIEW
2 1/2" HOSE
CONNECTION
STEAMER
CONNECTION
CONC.1'-6"BURY AS SPECIFIEDON PLANS
AS SHOWN
1'-0"BLOCKING
(SEE NOTE)
WEEP HOLE TO
REMAIN OPEN
2'-0"
BACKFILL
STONE(7 C.F. MIN.)
6" G.V. &C. I. BOX
4-3/4" TIE RODS WITH BRACKETS
(SEE DETAIL)6" HYDRANT TEE
6" WATERLINE
NOTE:
TIE HYDRANT TO MAIN LINE
W/TIE RODS IN LIEW OF CONC.
BLOCKING IN SANDY SOIL.
PRECAST CONCRETEPROTECTION RING
NO SCALE
EDGE OFROAD
FINISHED GRADE
NO SCALE
BACKFILL TO EDGE
NO SCALE NO SCALE
GENERAL WATERLINE NOTES
1. CONTRACTOR SHALL REPAIR ALL WATER LATERALS, AND MAINS DAMAGED DURING
CONSTRUCTION. THE CONTRACTOR SHALL REPORT IMMEDIATELY ALL WATER MAIN AND
LATERAL BREAKS TO HARNETT COUNTY DISPATCHER AND TO THE OWNER'S REPRESENTATIVE
AND SHALL INITIATE IMMEDIATE REPAIRS TO HARNETT COUNTY STANDARDS. CONTRACTOR
SHALL NOT OPERATE HARNETT COUNTY WATER MAIN VALVES WITHOUT HARNETT COUNTY
APPROVAL AND SHALL COORDINATE ALL VALVE CLOSINGS WITH THE HARNETT COUNTY WATER
AUTHORITY. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH WATER SYSTEM IN THE AREA
SO AS TO LESSEN THE CHANCE OF SERVICE INTERRUPTION.
2. THE CONTRACTOR SHALL NOT USE HOUSE HOSE BIBBS OR ANY OTHER METHOD OF BLOW OFF
WHICH ALLOWS DOMESTIC WATER CONTAINING SEDIMENTS OR HIGH LEVELS OF CHLORINE TO
PASS THRU RESIDENT'S METERS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES
RESULTING FROM ALLOWING "DIRTY" WATER TO ENTER RESIDENT'S PLUMBING SYSTEM, SUCH AS
WATER HEATERS, STAINED CLOTHING, CLOGGED SCREENS, ETC.
NOTE:AT PIPE INTERSECTIONS, MULTIPLEVALVES, RUN WIRE UP AT ONLY ONE VALVE.
SINGLE 12 AWG SOLID CORE WIRE
GATE VALVETRACER WIRE TO BE LAIDUNDERNEATH WATER LINE
VALVE BOX
FINISHED GRADE
IN VALVE BOX
NO. 1
DRILL HOLE
FOR TRACER WIRE
TRACER WIRE
VALVE BOX
P.V.C. PIPELINE
NOTES:
1. DRILL HOLE IN VALVE BOX TO INSERT TRACER WIRE,BRING UP TO INSIDE AND ROLL UP AT LEAST 6"-8" EXCESS
VALVE BOX
2. PLACE TRACER WIRE IN VALVE BOX AT 1,000" INTERVALS OR AS NOTED ON THE PLANS, TYPICAL.
PLACE EMPTY VALVE BOX AT INTERVALS WHERE VALVES DO NOT OCCUR & PLACE TRACER WIREIN BOX.
NO SCALE
3. DO NOT SPLICE WIRE WHEN BEGINNING A NEW SPOOL. INSTEAD INSTALL A VALVE BOX AND ATTACH EACH WIRE WITH A BRASS SCREW TO THE VALVE BOX.
NOTE:
LOOPED IN BOX6"-8" EXCESS
BACKFILL TO EDGE
14
NOT TO SCALE
SANITARY AND STORM SEWER CROSSING DETAIL
NOTES:
1. WHEN IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN
AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTSEQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THEPOINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OFCROSSING.
2. ALLOWABLE PIPE AND/OR JOINT DEFLECTIONS MAY BE USED IN LIEU OF BENDS TO ACHIEVE
REQUIRED CLEARANCE OVER OR UNDER SEWER.
BACKFILL WITHCOMPACTED ABCSTONE TO THE TOPOF THE SEWER WHENCROSSING BELOW
SANITARY ORSTORM SEWER(SEE NOTE 1)
D.I.P. (TYP.)
MIN. CLEARANCE18" SAN. SEW.12" STORM SEW.
45° M.J. BENDS(4 TYP.)
CONTINUOUS #12
COPPER TRACER WIREOVER NON-FERROUS PIPE
20'-0"CENTER ON SEWER
TWO (2) THREADED
RODS OF BOLT DIA.,PROVIDE NUT ANDWASHER AT EACH ENDAND AT GLAND
FOLLOWERS (TYP.)
EXISTING GRADE
36" MIN. OR ELSE CROSSUNDER SEWER (MIN.CLEARANCE UNDER AS SHOWN
ON PROFILE)
EXCAVATE TO TOP OFSEWER AND BACKFILL WITH
COMPACTED ABC STONE
WHEN CROSSING ABOVE
6
3: PER ASI #1
Phipps
3-2 -21
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
D-608
WATER DETAILS
32
1
2019 HRW REQUIRED UTILITY NOTES
(Revision 7 - November 2019)
WATER
A.The Fire Marshal's Office shall approve all hydrant types and locations in new subdivisions.
However, Harnett Regional Water (HRW) prefers the contractors to install one of the following fire
hydrants:
1.Mueller - Super Centurion 250 A-423 model with a 5¼” main valve opening three way (twohose nozzles and one pumper nozzle);2.American Darling - Mark B-84-B model with a 5¼” main valve opening three way (two hosenozzles and one pumper nozzle);3.Waterous - Pacer B-67-250 model with a 5¼” main valve opening three way (two hosenozzles and one pumper nozzle) or approved equal for standardization.
B.Fire hydrants are installed at certain elevations. Any grade change in the vicinity of any fire
hydrant which impedes its operation shall become the responsibility of the Utility Contractor for
correction. Corrections will be monitored by the HRW Utility Construction Inspector and the
Harnett County Fire Marshal.
C.The Professional Engineer (PE) shall obtain and provide the NCDEQ “Authorization to Construct”
permit to the Utility Contractor before the construction of the water line shall begin. The Utility
Contractor must post a copy of the NCDEQ “Authorization to Construct” permit issued by the
North Carolina Department of Environmental Quality (NCDEQ) on site prior to the start of
construction. The permit must be maintained on site throughout the entire construction process
of the proposed water lines that will serve this project.
D.The Utility Contractor shall notify Harnett Regional Water (HRW) and the Professional Engineer (PE)
at least two days prior to construction commencing. The Utility Contractor must schedule a
pre-construction conference with Mr. Alan Moss, HRW Utility Construction Inspector at least two
(2) days before construction will begin and the Utility Contractor must coordinate with HRW for
regular inspection visitations and acceptance of the water system(s). Construction work shall be
performed only during the normal working hours of HRW which is 8:00 am - 5:00 pm Monday
through Friday. Holiday and weekend work is not permitted by HRW.
E. The Professional Engineer (PE) shall provide HRW and the Utility Contractor with a set of NCDEQ
approved plans marked “Released for Construction” at least two days prior to construction
commencing. The Registered Land Surveyor (RLS) should stake out all lot corners and the grade
stakes for the proposed finish grade for each street before the Utility Contractor begins
construction of the water line(s). The grade stakes should be set with a consistent offset from the
street centerline so as not to interfere with the street grading and utility construction.
F. The Utility Contractor shall provide the HRW Utility Construction Inspector with material
submittals and shop drawings for all project materials prior to the construction of any water line
extension(s), and associated water services in Harnett County. The materials to be used on the
project must meet the established specifications of HRW and be approved by the Engineer of
Record prior to construction. All substandard materials or materials not approved for use in
Harnett County found on the project site must be removed immediately when notified by the HRW
Utility Construction Inspector.
G.The water main(s), fire hydrants, service lines, meter setters and all associated appurtenances
shall be constructed in strict in accordance with the standard specifications of the Harnett
Regional Water (HRW). The Utility Contractor shall be responsible to locate the newly installed
water main(s), water service lines and all associated meter setters and meter boxes for other utility
companies and their contractors until the new water main(s) have been approved by the North
Carolina Department of Environmental Quality, Division of Environmental Health, Public Water
Supply Section (NCDEQ, DEH, PWS) and accepted by HRW.
H.Prior to acceptance, all services will be inspected to insure that they are installed at the proper
depth. All meter boxes must be flush with the ground level at finish grade and the meter setters
must be a minimum of 8” below the meter box lid. Meter setters shall be centered in the meter
box and supported by brick, block or stone.
I. The Utility Contractor shall provide the Professional Engineer (PE) and HRW Utility Construction
Inspector with a set of red line drawings identifying the complete water system installed for each
project. The red line drawings should identify the materials, pipe sizes and approximate depths
of the water lines as well as the gate valves, fire hydrants, meter setters, blow off assemblies and
all associated appurtenances for all water line(s) constructed in Harnett County. The red line
drawings should clearly identify any deviations from the NCDEQ approved plans. All change
orders must be approved by HRW and the Professional Engineer (PE) in writing and properly
documented in the red line field drawings.
J. Potable water mains crossing other utilities and non-potable water lines (sanitary sewer, storm
sewer, RCP, etc.) shall be laid to provide a minimum vertical distance of twenty-four (24”) inches
between the potable water main and all other utilities. NCDOT requires the new water mains to be
installed under the storm water lines. The potable water main shall be installed with twenty-four
(24”) inches of vertical separation and with ductile iron pipe when designed to be placed under a
non-potable water line such as sanitary sewer or storm sewer lines. If these separations cannot be
maintained then the water main shall be installed with ductile iron pipe. Both the potable water
main and the non-potable water line must be cast iron or ductile iron pipe (DIP) if the state
minimum separations cannot be maintained. The ductile iron pipe must be laid so the mechanical
joints are at least (10') feet from the point where the potable water main crosses the non-potable
water line.
K.Potable water mains installed parallel to non-potable water lines (sanitary sewer, storm sewer, RCP,
etc.) shall be laid to provide a minimum horizontal distance of ten (10') feet between the potable
water main and sanitary sewer mains, sewer laterals and services. The horizontal separation
between the potable water main and any other utility or storm sewer shall not be less than five (5')
feet. The potable water main must be ductile iron pipe if this horizontal separation of ten (10')
feet cannot be maintained. The ductile iron pipe shall extend at least ten (10') feet beyond the
point where the minimum required horizontal separation of ten (10') feet can be re-established.
L. Meter setters shall be installed in pairs on every other lot line where possible to leave adequate
space for other utilities to be installed at a later time. The meter setters shall be installed at least
one (1') foot inside the right-of-way and at least three (3') to five (5') feet from the property line
between the lots.
M. HRW requires that meter boxes for ¾” services shall be 12” wide x 17” long ABS plastic boxes
at least 18” in height with cast iron lids/covers. Meter boxes for 1” services shall be 17” wide x
21” long ABS plastic boxes at least 18” in height with plastic lids and cast iron flip covers in the
center of the lids. Meter boxes for 2” services shall be 20” wide x 32” long ABS plastic boxes at
least 20” in height with plastic lids and cast iron flip covers in the center of the lids.
N.Master meters must be installed in concrete vaults sized for the meter assembly and associated
appurtenances so as to provide at least eighteen (18”) inches of clearance between the bottom of
the concrete vault and the bottom of the meter setter. The master meter must be provided test
ports if the meter is not equipped with test ports from the manufacturer in accordance with the
HRW established standard specifications and details. Ductile iron pipe must be used for the
master meter vault piping and valve vault piping. The Utility Contractor must provide shop
drawings for the meter vaults to HRW prior to ordering the concrete vaults.
O.The Utility Contractor will install polyethylene SDR-9 water service lines that cross under the
pavement inside a schedule 40 PVC conduit to allow for removal and replacement in the future.
Two (2) independent ¾” water service lines may be installed inside one (1) - two (2”) inch schedule
40 PVC conduit or two (2) independent 1” water service lines may be installed inside one (1) -
three (3”) inch schedule 40 PVC conduit, but each water service shall be tapped directly to the
water main. Split services are not allowed by HRW.
P. The water main(s), fire hydrants, gate valves, service lines, meter setters and associated
appurtenances must be rated for 200 psi and hydrostatically pressure tested to 200 psi. The
hydrostatic pressure test(s) must be witnessed by the HRW Utility Construction Inspector. The
Utility Contractor must notify HRW when they are ready to begin filling in lines and coordinate with
Harnett Regional Water to witness all pressure testing.
Q.The Utility Contractor shall conduct a pneumatic pressure test using compressed air or other
inert gas on the stainless steel tapping sleeve(s) prior to making the tap on the existing water
main. This pneumatic pressure test must be witnessed by the HRW Utility Construction Inspector.
The Utility Contractor shall use Romac brand stainless steel tapping sleeve(s) or approved equal
for all taps made in Harnett County. All new water line extensions must begin with a resilient
wedge type gate valve sized equal to the diameter of the new water line extension in order to
provide a means of isolation between Harnett Regional Water's existing water mains and the new
water line extensions under construction.
R. All water mains will be constructed with SDR-21 PVC Pipe or Class 50 Ductile Iron Pipe rated for at
least 200 psi or greater. All pipes must be protected during loading, transport, unloading,
staging, and installation. PVC pipe must be protected from extended exposure to sunlight prior
to installation.
S. All water mains will be flushed and disinfected in strict accordance with the standard
specifications of the Harnett Regional Water. All water samples collected for bacteria testing will
be collected by the HRW Utility Construction Inspector and tested in the HRW Laboratory.
T.All fittings larger than two (2”) inches diameter shall be ductile iron. HRW requires that mechanical
joints be assembled with grip rings as “Megalug” fittings are not approved by Harnett Regional
Water for pipe sizes smaller than twelve inches (12”) diameter. PVC pipe used for water mains
shall be connected by slip joint or mechanical joint with grip rings. Glued pipe joints are not
allowed on PVC pipe used for water mains in Harnett County.
U.HRW requires that the Utility Contractor install tracer wire in the trench with all water lines. The
tracer wire shall be 12 ga. insulated, solid copper conductor and it shall be terminated at the top
of the valve boxes or manholes. No spliced wire connections shall be made underground on
tracer wire installed in Harnett County. The tracer wire may be secured with duct tape to the top
of the pipe before backfilling.
V.The Utility Contractor will provide Professional Engineer (PE) and the HRW Utility Construction
Inspector with a set of red line field drawings to identify the installed locations of the water line(s)
and all associated services. All change orders must be pre-approved by HRW and the Professional
Engineer (PE) in writing and properly documented in the red line field drawings.
W. The Utility Contractor shall spot dig to expose each utility pipe or line which may conflict
with construction of proposed water line extensions well in advance to verify locations of the
existing utilities. The Utility Contractor shall provide both horizontal and vertical clearances to the
Professional Engineer (PE) to allow the PE to adjust the water line design in order to avoid conflicts
with existing underground utilities. The Utility Contractor shall coordinate with the utility owner
and be responsible for temporary relocation and/or securing existing utility poles, pipes, wires,
cables, signs and/or utilities including services in accordance with the utility owner requirements
during water line installation, grading and street construction.
X.Prior to the commencement of any work within established utility easements or NCDOT
right-of-ways the Utility Contractor is required to have a signed NCDOT encroachment agreement
posted on site and notify all concerned utility companies in accordance with G.S. 87-102. The
Utility Contractor must call the NC One Call Center at 811 or (800) 632-4949 to verify the location
of existing utilities prior to the beginning of construction. Existing utilities shown in these plans
are taken from maps furnished by various utility companies and have not been physically located
or verified by the P.E. (i.e. TELEPHONE, CABLE, WATER, SEWER, ELECTRICAL POWER, FIBER OPTIC,
NATURAL GAS, ETC.). The Utility Contractor will be responsible to repair any and all damages to
the satisfaction of the related utility company.
Y.The Utility Contractor shall provide HRW with at least one (1) fire hydrant wrench and one (1)
break-away flange kit for every subdivision with fire hydrants developed in Harnett County. These
items must be provided to HRW before the final inspection will be scheduled by the HRW Utility
Construction Inspector. In addition, the Utility Contractor shall install a 4” x 4” concrete valve
marker at the edge of the right-of-way to identify the location of each gate valve installed in the
new water system with the exception of the fire hydrant isolation valves. The contractor shall
measure the distance from the center of the concrete marker to the center of the valve box. This
distance (in linear feet) shall be stamped on the brass plate located on the top of the concrete
valve marker. In lieu of installing the concrete valve markers, the Utility Contractor may provide at
least two measurements from two independent permanent above ground structures to the
Professional Engineer (PE) in the red line drawings to identify the valve locations. The Professional
Engineer (PE) must include these measurements in the As-Built Record Drawings submitted to
HRW.
Z. The Utility Contractor will be responsible for any and all repairs due to leakage damage from poor
workmanship during the one (1) year warranty period once the water system improvements have
been accepted by Harnett Regional Water. Harnett Regional Water will provide maintenance and
repairs when requested and bill the Developer and/or Utility Contractor if necessary due to lack of
response within 48 hours of notification of warranty work. The Utility Contractor will be
responsible for any and all repairs due to damages resulting from failure to locate the new water
lines and associated appurtenances for other utilities and their contractors until the water lines
have been approved by NCDEQ and accepted by HRW. The final inspection of water system
improvements cannot be scheduled with HRW until the streets have been paved; the rights-of-way
and utility easements have been seeded and stabilized with an adequate stand of grass in place to
prevent erosion issues on site.
AA The Engineer of Record is responsible to insure that construction is, at all times, in compliance
with accepted sanitary engineering practices and approved plans and specifications. No field
changes to the approved plans are allowed without prior written approval by HRW. A copy of
each engineer's field report is to be submitted to HRW as each such inspection is made on
system improvements or testing is performed by the contractor. Water and sewer infrastructure
must pass all tests required by HRW specifications and those of all applicable regulatory
agencies. These tests include, but are not limited to: air test, vacuum test, mandrel test, visual
test, pressure test, bacteriological test, etc. A HRW Inspector must be present during testing
and all test results shall be submitted to HRW. All tests must be satisfied before the final
inspection will be scheduled with the HRW Inspector. The Engineer of Record must request in
writing to schedule the final inspection once all construction is complete. The Developer's
Engineer of Record and the HRW Utility Construction Inspector shall prepare a written punch list
of any defects or deficiencies noted during the final inspection, should any exist. Upon
completion of the punch list, the Developer's Engineer of Record will schedule another
inspection. In the event the number of inspections performed by the HRW exceeds two,
additional fees may be accessed to the Developer.
GENERAL NOTES:
1. SEE PLANS FOR SIZE OF RPZ BACKFLOW PREVENTER.
2. RPZ BACKFLOW PREVENTER SHALL BE WATTS SERIES 909 OS&Y OR AN APPROVED EQUAL.
3. INSULATED ENCLOSURE SHALL BE "HOT BOX" OR AN APPROVED EQUAL SIZE IN
ACCORDANCE WITH THE BACKFLOW PREVENTER.
4. RPZ SHALL BE SUITABLE FOR HIGH PRESSURE OPERATION.
5. SEE MANUFACTURER'S SPECIFICATIONS.
6. ALL VALVES SHALL BE ULFM APPROVED WITH STRAINER.
8" CONCRETE
SLAB WITH WWF
M.J. 90° BEND WITH
MEGA-LUG RESTRAINT (TYP.)
DUCTILE
IRON PIPE
PIPE
SUPPORT (TYP.)
FLANGED
90° BEND
DUCTILE
IRON PIPE
FLANGED
GATE VALVE FLANGED
GATE VALVE
"HOT BOX" INSULATED
ENCLOSURE OR
APPROVED EQUAL
SET TOP OF SLAB
2" ABOVE FINISH GRADE
ULFM APPROVED REDUCE
PRESSURE ZONE BACKFLOW
PREVENTER ASSEMBLY
FLANGED
GATE VALVE
FLANGED
GATE VALVE
FLANGED
90° BEND
"HOT BOX" INSULATED
ENCLOSURE OR
APPROVED EQUAL
FINISH GRADE
SLAB SHALL EXTEND
6" BEYOND SIZE OF
ENCLOSURE ON ALL
SIDES (TYP.)
MJ SLEEVE
W/ GRIP RINGS
CONCRTE FILLED
NO SCALE
DI PIPE
PLAN VIEW
3 CONC SUPPORTS
(to open to side)
VALVE
GATE
VALVE
GATE
NO SCALE
ALL PIPE SHALL BE DUCTILE IRON
BACKFLOW PREVENTER TO BE FROM APROVED LIST
METER TO BE ABB OR AMCO METER.NOTE:
PUBLIC UTILITIES, ENGINEERING DIVISION SPECIFICATIONS.
TO BE AS PER HARNETT COUNTY DEPT. OF
ALL BACKFLOW AND METER VAULT EQUIPMENT, ETC.
(ROTATE 90 degrees)
STRAINER
NO SCALE
HYMAX
COUPLING
USE CONCRETE SUPPORTS ALSO FOR BY-PASS
SAME LEVEL
BY-PASS (see top view)
SAME LEVEL
BY-PASS
HYMAX
COUPLING
HCDPU STANDARD VAULTS
TEST PORT
FLANGED
90° BEND
FLANGED
90° BEND6'-0"16'-0"
PAPA
3-2.21
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/02/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
CONTRACT DOCUMENTS
No. Date Description
engineering, pllc
140 Auqa Shed Ct., Aberdeen, NC 28315
Office: 910-420-1437 Fax: 910-420-1438
lkcengineering.com License No. P-1095
D-609
SANITARY SEWER
8
6
DETAILS
SANITARY SEWER CLEANOUT
NOT TO SCALE
4"x4" LONG SWEEPCOMBINATION WYE
4" PVC SANITARYSEWER SERVICE
CONCRETE CLEANOUTCOLLAR 18"x18"x4"
TRAFFIC RATEDCLEANOUTCOVER PLATE
THREADEDCLEANOUT PLUG
FINISHGRADE
ELEVATION
TRAFFIC RATEDCLEANOUTCOVER PLATE
18"18" PLAN VIEW
7
SANITARY SEWER
(0'-8' DEPTH)
PIPE LAYING
CONDITION "A"
PIPE
O.D.
HAND PLACED
DENSELY COMPACTED
BACKFILL TO 1 FT.
ABOVE TOP OF PIPE
BEDDED PIPE
MINIMUM STONE
EMBEDMENT AS
INDICATED. GREATER IF
REQUIRED BY
MANUFACTURER
12 PIPEO.D.
24" + O.D. MAX.
12" + O.D. MIN.
D/8≥3"D/4
D/2
D/8≥3"
24" + O.D. MAX.
12" + O.D. MIN.
12 PIPE
O.D.
MINIMUM STONE
EMBEDMENT AS
INDICATED. GREATER IF
REQUIRED BY
MANUFACTURER
BEDDED PIPE
HAND PLACED
DENSELY COMPACTED
BACKFILL TO 1 FT.
ABOVE TOP OF PIPE
PIPE
O.D.
SANITARY SEWER
(<8'-16' DEPTH)
PIPE LAYING
CONDITION "B"
SHAPED STONE
TO PROVIDE BEARING
ALONG ENTIRE LENGTH
OF PIPE BARREL
SHAPED STONE
TO PROVIDE BEARING
ALONG ENTIRE LENGTH
OF PIPE BARREL
NO SCALE
NO SCALE
4" PVC VERTICAL
4" SWEEP WYE
SERVICE LINE
SANITARY SEWER
MAIN
TEE BRANCH
SLOPE MIN. 1%
PLUG
STOP AT R/W
45°SANITARY TEE
(SAME MATERIAL
AS MAIN)
CLEANOUT PLUG AND CAP
NOTE:
EASEMENT SHALL BE PROVIDED FOR SERVICE
CONNECTION WHERE SERVICE CONNECTION IS PLACED
OUTSIDE OF R/W DUE TO PHYSICAL CONSTRAINTS.CAST IRON VALVE BOX
W/ CHARLOTTE HUB
3'-0"
MAX.
1' inside
RW
IN-LINE WYE
FITTING FOR NEW
CONSTRUCTION OR
ROMAC-CB SADDLE
FOR TAP ON EXISTING
SANITARY SEWER MAIN.
BRASS
(DO NOT GLUE)
SCH 40 PVC VERTICAL
SCH 40 PVC
SCH 40 PVC
NO SCALE
9
CONDITIONS
LAYING
DESCRIPTION PROJECT USE
FLAT BOTTOM UNDISTURBEDEARTH TRENCH, LOOSE BACKFILL
FLAT BOTTOMED UNDISTURBED EARTHTRENCH. BACKFILL LIGHTLY
CONSOLIDATED TO CENTERLINE
OF PIPE.
NOT USED.
NOT USED.
TYPE 1
TYPE 2
CONDITIONS
LAYING
DESCRIPTION PROJECT USE
PIPE BEDDED IN 4" MININUM
JOB EXCAVATED MATERIAL.
BACKFILL LIGHTLY CONSOLIDATED
TO TOP OF PIPE.
PIPE BEDDED IN SAND, GRANULARMATERIAL OR GRADED GRAVEL TO
THE DEPTH OF 1/8 PIPE DIAMETER,
4" MIN. JOB EXCAVATED MATERIAL
COMPACTED TO 4" ABOVE TOP OF PIPE.(APPROX. 95% STANDARD PROCTOR,
AASHTO T-99)
IN COMPACTED GRANULAR MATERIAL
4" MIN. UNDER PIPE. COMPACTED
GRANULAR OR SAND MATERIAL TO
4"ABOVE TOP OF PIPE.(APPROX. 95% STANDARD PROCTOR,
AASHTO T-99)
ALL DUCTILE
IRON GRAVITY
SEWER LINE.
ALL PVC WATER
LINE AND PVC
FORCE MAIN.
ALL PVC GRAVITY
SEWER LINE.
TYPE 3
TYPE 4
TYPE 5
COVER
FRAME & COVER
FRAME NOTE:
CONCRETE ENCASEMENT SHALL ONLY BE
USED IN AREAS WHERE COVER IS TO BE FLUSH
WITH PAVEMENT OR CONCRETE. CONCRETE
ENCASEMENT SHALL NOT BE USED IN
NON-TRAFFIC AREAS AND ABOVE GRADE
INSTALLATIONS.
USE MIN. 4 EA. 3/8" ANCHOR
BOLTS TO SECURE FRAME TO MANHOLE
23.5"
RAM-NEK
SEALANT
2"1"
BASE COURSEBASE COURSE
FINISHED GRADE
1.5" MIN.
6" MIN.
COMPACTED FILLCOMPACTED FILL
STD. MANHOLE
RING & COVER
COPOLYMER POLYPROPYLENE
PLASTIC M.A. INDUSTRIES MODEL
PSI-PF OR APPROVED EQUAL.
918"
338"114"
118"918"
1034"
12"FLOWSLOPE
112":12"SLOPE112
":12"USE 4 EA. 38" ANCHOR BOLTS
TO BOLT FRAME TO SPACER.
USE ROPE MASTIC SEAL
BETWEEN FRAME AND SPACER.
STANDARD MANHOLE
RING AND COVER
MANHOLE STEPS
16" O.C.
BRICK & MORTAR INVERT
MIN. 6" GRAVEL BEDDING
ECCENTRIC
TAPER UNIT
RISER UNIT
BASE UNIT
4' DIA. MIN.5"
2'-0", 3'-0"
OR 4'-0"
8" MAX. FOR SPACER
8"
JOINTS SHALL BE SEALED
WITH A RUBBER O-RING
GASKET OR ROPE MASTIC SEAL.
CEMENT GROUT ALL JOINTS
INSIDE AND OUT
112":12" SLOPE
ON ALL INVERTS
EXTENDED BASE
(REQUIRED OVER 12')
NO SCALE
NO SCALE
NO SCALE
NOTE:
1. THE FLOW CHANNEL THROUGH MANHOLES SHOULD BE MADE
TO CONFORM IN SHAPE AND SLOPE TO THE SEWER MAIN.
2. CHANGE IN DIRECTION OF THE CHANNEL SHALL NOT BE
EXCEED 90 DEGREES.
NOTE:
IN NON-TRAFFIC AREAS,TOP OF FRAME AND COVER SHALL BE
INSTALLED AT LEAST 2 FT ABOVE FINISH GRADE OR
AT LEAST 1 FT ABOVE FLOOD STAGE.
SEE DETAIL S-25
1. SEE DETAIL S-28 FOR TYPICAL INVERT.
NOTES:
3. SEE DETAIL S-24 FOR TYPICAL MANHOLE STRUCTURE.
WIDTH AS
REQUIRED
12" MIN.
NO SCALE
1 2 3 4
2019 HRW REQUIRED UTILITY NOTES
(Revision 7 - November 2019)
SANITARY SEWER
A. The Professional Engineer (PE) shall obtain and supply a copy of the sewer permit for the construction and operation of the wastewater collection system to the Utility Contractor before the construction of the sanitary sewer line, sewer lift station and associated force main shall begin. The Utility Contractor must post
a copy of the sewer permit issued by the North Carolina Department of Environmental Quality (NCDEQ) on site prior to the start of construction. The permit must be maintained on site during the construction of the sewer system improvements.
B. The Utility Contractor shall notify Harnett Regional Water (HRW) and the Professional Engineer (PE) at least two days prior to construction commencing. The Utility Contractor must schedule a pre-construction conference with Mr. Alan Moss, HRW Utility Construction Inspector at least two (2) days before construction
will begin and the Utility Contractor must coordinate with HRW for regular inspection visitations and acceptance of the wastewater system(s). Construction work shall be performed only during the normal working hours of HRW which is 8:00 am - 5:00 pm Monday through Friday. Holiday and weekend work is not
permitted by HRW.
C. The Professional Engineer (PE) shall provide HRW with a set of NCDEQ approved plans marked “Released for Construction” at least two days prior to construction commencing. HRW will stamp the approved plans as “Released for Construction” and provide copies to the utility contractor. The Registered Land Surveyor
(RLS) shall stake out all lot corners and establish grade stakes for the proposed finish grade for each street and sewer line before the Utility Contractor begins construction or installation of the manholes, sanitary sewer gravity line(s), sewer lift stations and/or sanitary sewer force main(s). The grade stakes should be
set with a consistent offset from the street centerline so as not to interfere with the street grading or utility construction.
D. The Utility Contractor shall provide the HRW Utility Construction Inspector with material submittals and shop drawings for all project materials prior to the construction of any gravity sewer line(s), manhole(s), sewer lift station(s) and associated force main(s) in Harnett County. The materials to be used on the project
must meet the established specifications of HRW and be approved by the Engineer of Record prior to construction. All substandard materials or materials not approved for use in Harnett County found on the project site must be removed immediately when notified by the HRW Utility Construction Inspector.
E. The sanitary sewer lateral connections should be installed 90° (perpendicular) to the sanitary sewer gravity lines with schedule 40 PVC pipe. HRW requires the Utility Contractor to provide the Professional Engineer (PE) with accurate measurements for locating sanitary sewer service lateral and associated each sanitary
sewer clean-out. These measurements should be taken from the nearest downstream manhole up along the sanitary sewer main to the in-line wye fitting (or tapping saddle) and then another measurement from the in-line wye fitting (or tapping saddle) to the 4” x 4” long sweep combination wye fitting at the bottom
of the sewer clean-out stack. These field measurements must be provided to the Professional Engineer (PE) in the red line drawings from the Utility Contractor for proper documentation in the As-Built Record Drawings submitted to HRW.
F. The Utility Contractor shall be responsible to locate the newly installed sanitary sewer gravity line(s), sanitary sewer force main(s), sanitary sewer service lateral(s) and all associated sewer clean-out(s) in the proposed sanitary sewer system for other utility companies and their contractors until the new sanitary sewer
line(s) and associated appurtenances have been approved by the North Carolina Department of Environmental Quality (NCDEQ) and accepted by HRW. All new sanitary sewer lines must have at least three (3 ft. ) feet of cover and extend under all existing water main and storm water lines with a least 24” of vertical
clearance below the bottom of the existing water main and storm water lines.
G. The sanitary sewer gravity line(s), manhole(s), sanitary sewer service lateral(s) and associated clean-out(s) shall be constructed in strict accordance with the standard specifications of the Harnett Regional Water. The sanitary sewer gravity line(s) must pneumatically pressure tested with compressed air at 5 psi and the
sanitary sewer force main(s) must hydrostatically pressure tested with water or air at 200 psi. Sanitary sewer manholes must be vacuum tested to 10 inches of mercury and cannot drop below 9 inches in 60 seconds for 4 ft. diameter manholes, 75 seconds for 5 ft. diameter manholes. All tests mentioned above must
be witnessed by the HRW Utility Construction Inspector and Engineer.
H. Prior to acceptance, all sewer service laterals will be inspected to insure that they are installed at the proper depth. All sewer clean-outs must be installed so the 4” x 4” long sweep combination wye is at least three (3') feet but no more than four (4') feet below the finish grade unless otherwise approved in writing by
HRW. The sewer cleanouts shall have a four (4”) schedule 40 PVC pipe stubbed up from both ends of the 4” x 4” long sweep combination wye to be at least two (2') feet above the finish grade and cover each end with a four (4”) inch temporary cap to keep out dirt, sand, rocks, water and construction debris. The
vertical stack on each clean-out must be provided with a concrete donut for protection.
I. Once the sanitary sewer gravity line(s) have been installed, pneumatically pressure tested and in place for at least 30 days, the Utility Contractor must contact the HRW Utility Construction Inspector to witness the mandrel test on each PVC sanitary sewer gravity line. The Utility Contractor will notify HRW to schedule
the mandrel testing. The mandrel and proving ring must be supplied by the Utility Contractor. Closed circuit video camera inspections (at the Utility Contractor's expense) may be required by the HRW Utility Construction Inspector if the mandrel and mirror tamping testing cannot be completed with satisfactory
results. The sanitary sewer lines should be flushed clean using a sewer ball of the proper diameter before any mandrel testing can be performed. The Utility Contractor is responsible to remove all dirt, sand, silt, gravel, mud and debris from the newly constructed sewer lines exercising care to keep the Harnett
Regional Water's existing sanitary sewer systems clean. Sanitary sewer force main(s) shall be pressure tested to 200 psi for at least 2 hours like water lines.
J. The Utility Contractor shall be responsible to locate the newly installed sanitary sewer system(s) for other utility companies and their contractors until the new sanitary sewer system(s) have been approved by the North Carolina Department of Environmental Quality (NCDEQ) and accepted by HRW.
K. HRW requires that the Utility Contractor install tracer
wire in the trench with all sanitary sewer force mains. The tracer wire shall be 12 ga. insulated, solid copper conductor and it shall be terminated at the top of the valve boxes or manholes. No spliced wire connections shall be made underground on tracer wire installed in Harnett County. The tracer wire may be
secured with duct tape to the top of the pipe before backfilling. The tracer wire is not required for the gravity sewer line(s) between manholes.
L. The Utility Contractor shall provide the Professional Engineer (PE) and HRW Utility Construction Inspector with a set of red line drawings identifying the complete sewer system installed for each project. The red line drawings should identify the materials, pipe sizes and approximate depths of the sewer lines as well as
the installed locations of the manhole(s), sanitary sewer gravity line(s), sanitary sewer service laterals, clean-outs, sewer lift station(s) and associated force main(s). The red line drawings should clearly identify any deviations from the NCDEQ approved plans. All change orders must be approved by HRW and the
Professional Engineer (PE) in writing and properly documented in the red line field drawings.
M. Prior to the commencement of any work within established utility easements or NCDOT right-of-ways the Utility Contractor is required to notify all concerned utility companies in accordance with G.S. 87-102. The Utility Contractor must call the NC One Call Center at 811 or (800) 632-4949 to verify the location of
existing utilities prior to the beginning of construction. Existing utilities shown in these plans are taken from maps furnished by various utility companies and have not been physically located by the P.E. (i.e. TELEPHONE, CABLE, WATER, SEWER, ELECTRICAL POWER, FIBER OPTIC, NATURAL GAS, ETC.).
N. The Utility Contractor shall spot dig to expose each existing utility pipe or line which may conflict with construction of proposed sanitary sewer line extensions well in advance to verify locations of the existing utilities. The Utility Contractor shall provide both horizontal and vertical clearances to the Professional
Engineer (PE) to allow the PE to adjust the sanitary sewer line design in order to avoid conflicts with existing underground utilities. The Utility Contractor shall coordinate with the utility owner and be responsible for temporary relocation of existing utilities and/or securing existing utility poles, pipes, wires, cables,
signs and/or utilities including services in accordance with the utility owner's requirements during sanitary sewer line installation, grading and street construction.
O. When making a tap on an existing sewer force main, the Utility Contractor must have a permit from the North Carolina Department of Environmental Quality (NCDEQ) prior to begin the tap work. The Utility Contractor shall conduct a pneumatic pressure test using compressed air or other inert gas on the stainless
steel tapping sleeve and gate valve prior to making the tap on an existing sanitary sewer force main. This pneumatic pressure test must be witnessed by the HRW Utility Construction Inspector. The Utility Contractor shall use Romac brand stainless steel tapping sleeve(s) or approved equal for all taps made on
sanitary sewer force mains in Harnett County. The Utility Contractor shall use Romac brand Style “CB” sewer saddles with stainless steel bands or approved equal for all taps made on existing sanitary sewer gravity lines in Harnett County.
P. The Utility Contractor shall provide a grease trap for each sanitary sewer service lateral that will be connected to a restaurant, food processing facility and any other commercial or industrial facility as required by the Harnett County Fat, Oil & Grease Ordinance. The grease trap must be rated for a minimum capacity of
at least 1,000 gallons unless otherwise approved in writing by the HRW Pre-Treatment Coordinator. Garbage disposals should not be installed in homes and businesses that discharge wastewater to the Harnett Regional Water's Sanitary Sewer System as they are not approved by HRW.
Q. Each sewer lift station must be provided with three phase power (at least 480 volts) and constructed to meet the minimum requirements of the latest version of the National Electrical Code (NEC) and Harnett Regional Water standard specifications and details. If three phase power is not available from the power
company other arrangements must be approved by HRW Engineering prior to the start of construction.
R. Where a new sanitary sewer force main is connected to an existing manhole in the Harnett Regional Water sewer collections system, the Utility Contractor must provide a protective coating (coal tar epoxy) for the interior surfaces of the manhole to protect it against corrosion, erosion and deterioration from the release
of sewer gases such as methane and hydrogen sulfide.
S. The sewer lift station design and associated equipment must meet or exceed the MINIMUM REQUIREMENTS FOR HARNETT COUNTY SEWER LIFT STATIONS 2009 edition. Each sanitary sewer lift station must be constructed with an all-weather access road that is at least 20 feet wide. The lift station site must be covered
with weed blocking material and at least six (6”) inches of # 57 stone (crush and run).
T. Once a sewer lift station has been installed, the Utility Contractor is responsible to schedule a draw down test with HRW Engineering and Collections staff, the Professional Engineer (PE), the Electrician, the original equipment manufacturer's (OEM) representatives [For both the Pumps and the Generator]. This draw
down test must be completed with power supplied from the electrical utility company and with power supplied by the emergency generator with satisfactory results before final inspections are conducted by the HRW Utility Construction Inspector.
U. Once the Utility Contractor completes the installation of a sewer lift station, the Professional Engineer (PE) must submit the sewer permit certification and As-Built Record Drawings to the North Carolina Department of Environmental Quality (NCDEQ) and HRW for final approval. The Utility Contractor must supply HRW
Engineering staff with three original Operation & Maintenance (O&M) Manuals along with the associated pump curves and electrical schematics for the associated sewer lift station equipment including all warranty information and documentation.
V. Once the Utility Contractor completes the installation of a sewer lift station, the Developer must pay HRW the established System Control and Data Acquisition (SCADA) fees before the SCADA system will be installed at the new sewer lift station. The SCADA system must be installed and operational before the utilities
may be accepted by HRW and placed into operation.
W. HRW requires the Utility Contractor to provide all necessary equipment and devices for the testing and inspection of the sanitary sewer system. The equipment and devices may include but not limited to lamping with mirrors, mandrels, sewer balls, plugs, air compressors and associated compressed air lines. If the
HRW Utility Construction Inspector deems that a closed circuit video camera inspection of the newly constructed sewer system is necessary, then all costs for the closed circuit camera inspection will be the responsibility of the Utility Contractor. All closed circuit video camera inspections must be recorded on VHS
tapes that will released to HRW for record keeping, review and approval of the sewer system.
X. Any use of sewer plugs to temporarily block Harnett Regional Water's existing sanitary sewer lines must be coordinated with the HRW Collections Supervisor at least two (2) days in advance of installing the plugs. The sewer plugs must be removed as soon as possible once the new sanitary sewer lines have been
inspected, pressure tested, mandrel tested, approved by the North Carolina Department of Environmental Quality (NCDEQ) and accepted by HRW to allow the sewer to flow as designed in Harnett Regional Water's existing sanitary sewer lines or when so ordered by the HRW Collections Supervisor to limit interruptions
to the normal flow of the sanitary sewer collection system(s). The Utility Contractor must provide the pumps hoses and necessary connectors for a temporary pump around setup if required by the HRW Collections Supervisor. Mr. Randolph Clegg, HRW Collections Supervisor may be contacted between 8:00 am and
5:00 pm Monday through Friday at (910) 893-7575 extension 3241.
Y. The Utility Contractor will be responsible for any and all repairs due to leakage or damage resulting from poor workmanship during the one (1) year warranty period once the sewer system improvements have been approved by the North Carolina Department of Environmental Quality (NCDEQ) and accepted by HRW.
The Utility Contractor will be responsible for any and all repairs due to damages resulting from failure to locate the new sanitary sewer lines and associated appurtenances for other utilities and their contractors until the sanitary sewer lines have been approved by NCDEQ and accepted by HRW. HRW will provide
maintenance and warranty repairs if necessary due to lack of response within 48 hours of notification of warranty work. HRW will invoice the Developer and/or Utility Contractor for materials and labor in such cases.
Z. In developments and projects that require utility easements to be established for future HRW right-of-way, the Registered Land Surveyor (RLS) must provide the HRW Right-of-Way Agent with an official copy of the recorded plat and legal description of the said easement as recorded with the Harnett County Register of
Deeds. The recorded documents must be provided to the HRW Right-of-Way Agent before the utility improvements within the said easement can be placed into operation. Any and all easements that must be obtained from adjoining property owners must be provided to HRW by the Developer at no cost to Harnett
County. The final inspection of all sanitary sewer system improvements cannot be scheduled with HRW until the streets have been paved; the rights-of-way and utility easements have been seeded and stabilized with an adequate stand of grass in place to prevent erosion issues on site.
AA. The Engineer of Record is responsible to insure that construction is, at all times, in compliance with accepted sanitary engineering practices and approved plans and specifications. No field changes to the approved plans are allowed without prior written approval by HRW. A copy of each engineer's field report is to be
submitted to HRW as each such inspection is made on system improvements or testing is performed by the contractor. Water and sewer infrastructure must pass all tests required by HRW specifications and those of all applicable regulatory agencies. These tests include, but are not limited to: air test, vacuum test,
mandrel test, visual test, pressure test, bacteriological test, etc. A HRW Inspector must be present during testing and all test results shall be submitted to HRW. All tests must be satisfied before the final inspection will be scheduled with the HRW Inspector. The Engineer of Record must request in writing to schedule
the final inspection once all construction is complete. The Developer's Engineer of Record and the HRW Utility Construction Inspector shall prepare a written punch list of any defects or deficiencies noted during the final inspection, should any exist. Upon completion of the punch list, the Developer's Engineer of
Record will schedule another inspection. In the event the number of inspections performed by the HRW exceeds two, additional fees may be accessed to the Developer.
SEE DETAIL S-25
NO SCALE
SEE DETAIL S-25
5
PAPA
]-Z -21
File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 L101 PLANTING_2.dwg, By: trent, Plotted: Wed Apr 28, 2021 at 5:48pm( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
50 50 10025
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
L-101
PLANTING PLAN
ADJACENT PROPERTY
PROPERTY ZONED: RA-20M
USE GROUP: 1
ADJACENT PROPERTY
PROPERTY ZONED: RA-30
USE GROUP: 1
ADJACENT PROPERTY
PROPERTY ZONED: RA-30
USE GROUP: 1
TYPE A BUFFER
BUFFER WIDTH: 15'
BUFFER LENGTH 480 lf
MATURE TREES: 30' O.C., 16 TREES REQUIRED
OPTION 1: EVERGREEN SHRUBS 4-6 ' O.C., 96 SHRUBS REQUIRED
TYPE C BUFFER
BUFFER WIDTH: 10'
BUFFER LENGTH: 550 lf (MINUS SIGHT TRIANGLES
AND UTILITY EASEMENTS)
MATURE TREES 30' O.C., 19 TREES REQUIRED
EVERGREEN SHRUBS: 95 REQUIRED ( 5 PER TREE)
15' TYPE A BUFFER
10- NUTTALL OAK
(30' O.C.)
5- PRINCETON ELM
(30' O.C.)
36- GREENLUSTER HOLLY
(5' O.C.)
60- DWARF BURFORD HOLLY
(5' O.C.)
TYPE A BUFFER
BUFFER WIDTH: 15'
BUFFER LENGTH 690 lf
MATURE TREES: 30' O.C., 23 TREES REQUIRED
OPTION 1: EVERGREEN SHRUBS 4-6 ' O.C., 138 SHRUBS REQUIRED
EXISTING TREE TO BE
RETAINED FOR BUFFER
EXISTING UNDISTURBED VEGETATION
TO BE USED TO FULFILL ANY BUFFER
REQUIREMENTS IN THIS AREA
EXISTING UNDISTURBED VEGETATION
TO BE USED TO FULFILL ANY BUFFER
REQUIREMENTS IN THIS AREA
27- NELLIE STEVENS HOLLY
(7.5' O.C.)
15- NUTTALL OAK
(30' O.C.)
8- PRINCETON ELM
(30' O.C.)
78- GREENLUSTER HOLLY
(5' O.C.)
60- DWARF BURFORD HOLLY
(5' O.C.)
12- NUTTALL OAK
(30' O.C.)
7- PRINCETON ELM
(30' O.C.)
56- GREENLUSTER HOLLY
(5' O.C.)
60- DWARF BURFORD HOLLY
(5' O.C.)
3- AMERICAN HORNBEAM
3- NATCHEZ CREPE MYRTLE
8- NUTTALL OAK
15- AMERICAN HORNBEAM
17-PRINCETON ELM
5- NATCHEZ CREPE MYRTLE
(20' O.C.)
DO NOT PLANT WITHIN
UTILITY EASEMENTS
DO NOT PLANT WITHIN
SIGHT TRIANGLES
DO NOT PLANT WITHIN
UTILITY EASEMENTS
DO NOT PLANT WITHIN
SIGHT TRIANGLES
34,000 sf
FESCUE SOD
4-G.G. GERBING AZALEA
(5' O.C.)
PLAYGROUND
MULCH
32,200 sf
FESCUE SOD
12,500 sf
FESCUE SOD
10,50000 sf
FESCUE SOD
1,200 sf
FESCUE
SOD
PLAYGROUND
MULCH
MULCH ENTIRE BUFFER AREA
MULCH ENTIRE BUFFER AREA
15' TYPE A BUFFER
1
0
'
TYP
E
C
BU
F
F
ER
ADD ALTERNATE NUMBER 5
6- AMERICAN HORNBEAM
2
2 PAPA
4-29-21
File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 L101 PLANTING_2.dwg, By: trent, Plotted: Wed Apr 28, 2021 at 5:48pm( IN FEET )
0
GRAPHIC SCALEFULL SIZE SHEET 30"x42"
50 50 10025
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
L-102
IRRIGATION PLAN
34,000 sf
FESCUE SOD
PLAYGROUND
MULCH
32,200 sf
FESCUE SOD
15,000 sf
FESCUE SOD
2,400 sf
FESCUE
SOD
IRRIGATION NOTE:
PLANTING IS SHOWN FOR REFERENCE ONLY TO AIDE CONTRACTOR
IN DETERMINING LIMITS OF DRIP ZONES.
PLAYGROUND
MULCH
IRRIGATION LEGEND
SYMBOL DESCRIPTION
1 1/2" ELECTRIC VALVE
1 " ELECTRIC DRIP ZONE
3/4" QUICK COUPLER ASSEMBLY
2" MANUAL BRASS SHUT-OFF VALVE
2" PVC PIPE
3/4" PVC PIPE
1
L-102
4" PVC SLEEVE
POINT OF CONNECTION -
2" STUB-OUT AFTER GATE VALVE
DRIP ZONE #1DRIP ZONE #2
DRIP ZONE #3
DRIP ZONE #4
DRIP ZONE #5
DRIP ZONE #6 DRIP ZONE #7
DRIP ZONE #8
DRIP ZONE #9
DRIP ZONE #10
DRIP ZONE #11
PAPA
4-29-21
PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 L101 PLANTING_2.dwg, By: trent, Plotted: Wed Apr 28, 2021 at 5:48pmL-103
PLANTING DETAILS
PLANT SCHEDULE
PLANT SCHEDULE
QTY BOTANICAL NAME COMMON NAME SIZE
TREE PLANTING DETAIL
NOT TO SCALE
TOMAHAWK TREE STABILIZER AND
FERTILIZATION SYSTEM
24" TOMAHAWK TO 1-12" CALIPER TREE
32" TOMAHAWK TO 3" CALIPER TREE
42" TOMAHAWK FOR 5" CALIPER TREE
3" DEPTH OF SPECIFIED MULCH
APPROVED SOIL MIXTURE
STABILIZER BAR DETAIL
DEEP ROOT FERTILIZATION
AND WATERING
SET TREE AT ORIGINAL DEPTH. REMOVE
BURLAP, WIRE & STRAPS (ANYTHING THAT
COULD GIRDLE TREE OR RESTRICT ROOT
GROWTH) ON UPPER 1/3 OF ROOTBALL
PRUNE TREE AS DIRECTED BY
LANDSCAPE ARCHITECT
BRANCHING HEIGHT TO A.A.N. STANDARDS
12" MIN.
ANGLE TOMAHAWK TO MATCH SLOPE
Tomahawk (typ.)
topsoil back fillrootball and trunk
PLAN VIEW
TOMAHAWK™ TREE STABILIZER SPECIFICATION
MANUFACTURER: BORDER CONCEPTS, INC.
P. O. BOX 471185
CHARLOTTE, NORTH CAROLINA 28247
TOLL FREE: 800-845-3343
FAX: 704-541-5610
WWW.BORDERCONCEPTS.COM
INFO@BORDERCONCEPTS.COM
DESCRIPTION: TOMAHAWK™ TREE STABILIZER AND FERTILIZATION SYSTEM TO BE
PROVIDED BY BORDER CONCEPTS, INC.
RECOMMENDED SIZES TO USE:
24'' TSS - FOR USE ON TREES UP TO 1.5'' CALIPER TREE
32'' TSS - FOR USE ON TREES UP TO 3'' CALIPER TREE
42'' TSS - FOR USE ON TREES UP TO 5'' CALIPER TREE
+ALWAYS USE DRIVING TOOL (INCLUDED IN EACH CASE) TO INSTALL
+NOTCHED FOR GUYING IN EXTREME WINDS
NOTE: IN CERTAIN CONDITIONS SUCH AS HEAVY WINDS, LOOSE SOIL CONDITIONS,
HEAVY FOLIAGED TREES, OR LARGER DIAMETER TREES 3 OR 4 TOMAHAWK™ SHOULD
BE INSTALLED.
DETERMINE THE CORRECT SIZE TOMAHAWK™ BY MEASURING THE ROOT BALL SIZE.
THE OUTSIDE LONG SUPPORT SHOULD EXCEED AT LEAST 8'' OF UNDISTURBED SOIL
BELOW THE ROOT BALL.
INSTALLATION:
INSTALL PER PLANS OR DETAIL AND AS PER MANUFACTURER'S
RECOMMENDATIONSStable or compacted subgrade
1
L-103
12"STABLE OR COMPACTED SUBGRADE
SPECIFIED MULCH, 3" MIN. DEPTH
EXISTING GRADE
AMENDED SOIL MIXTURE
SET SHRUB AT ORIGINAL DEPTH
SHRUB PLANTING DETAIL
NOT TO SCALE
EQ.EQ.NOTES:
1- SEE PLANTING LEGEND FOR GROUNDCOVER SPECIES, SIZE, AND SPACING DIMENSION.
2- SMALL ROOTS (14" OR LESS) THAT GROW AROUND, UP, OR DOWN THE ROOT BALL PERIPHERY ARE CONSIDERED A
NORMAL CONDITION IN CONTAINER PRODUCTION AND ARE ACCEPTABLE HOWEVER THEY SHOULD BE ELIMINATED AT THE
TIME OF PLANTING. ROOTS ON THE PERIPERHY CAPAN CAN BE REMOVED AT THE TIME OF PLANTING.
3- SETTLE SOIL AROUND ROOT BALL OF EACH GROUNDCOVER PRIOR TO MULCHING.
PLAN
SECTION VIEW
PAVEMENT.
MULCH.
GROUNDCOVER PLANTS TO BE
TRIANGULARLY SPACED.
EXISTING SOIL.
AMENDED SOIL PLANT BED TO BE 12" THICK MINIMUM. BOTTOM 4" OF SOIL
MIXTURE TO BE TILLED IN TO NATIVE SOIL
2 - 3" THICK LAYER OF MULCH.
FINISHED GRADE.6" min.NOT TO SCALE
GROUNDCOVER PLANTING DETAIL
2
L-103
6
L-103
3
L-103
1. THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH COMPETENT RELIABLE SOURCES TO ENSURE THAT AN ADEQUATE SUPPLY OF THE
REQUIRED PLANT MATERIAL IS AVAILABLE. THIS SHALL BE COMPLETED A MINIMUM OF THREE MONTHS PRIOR TO PLANTING TIME TO
ALLOW FOR PLANT COLLECTIONS, STORAGE, AND PREPARATION. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL PLANT
MATERIAL IN THE APPROPRIATE SEASON FOR EACH PLANT TYPE.
2. ALL PLANT MATERIAL RECEIVED FROM COMMERCIAL NURSERIES SHALL CONFORM TO THE CURRENT ISSUE OF THE AMERICAN STANDARD
FOR NURSERY STOCK PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, EXCEPT WHERE OTHERWISE SPECIFIED.
3. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT
MATERIAL SHALL BE HEALTHY, VIGOROUS AND FREE FROM DEFECTS, DECAY, ABRASIONS OF THE BARK, PLANT DISEASES, INSECT
PEST EGGS, AND ALL FORMS OF INFESTATIONS. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE
WILT. UNHEALTHY STOCK IS UNACCEPTABLE. PLANTS FROM COLD STORAGE ARE UNACCEPTABLE.
4. PLANT MATERIAL SHALL BE INSPECTED BY THE OWNER'S REPRESENTATIVE UPON ARRIVAL AT THE PROJECT SITE. THE OWNER'S
REPRESENTATIVE RESERVES THE RIGHT TO REJECT OR ACCEPT ANY PLANT MATERIAL FOLLOWING FINAL INSPECTION.
5. THE FINAL LOCATION AND ORIENTATION OF ALL PLANT MATERIAL AS WELL AS THE LOCATION OF ALL PLANTING ZONES WILL BE SUBJECT
TO THE APPROVAL OF THE OWNER'S REPRESENTATIVE. CONTRACTOR MAY BE RESPONSIBLE FOR REPLANTING ANY PLANT MATERIAL
INSTALLED WITHOUT APPROVAL BY THE OWNER'S REPRESENTATIVE.
6. THE OWNER'S REPRESENTATIVE SHALL HAVE FINAL APPROVAL FOR THE SELECTION OF SPECIES SUBSTITUTIONS USED IN PLANTINGS.
ALL REQUESTS FOR SUBSTITUTIONS MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE PRIOR TO PLANTING.
7. OSMOCOTE, NUTRICOTE, OR OTHER CONTROLLED RELEASE COMMERCIAL GRADE GRANULAR FREE FLOWING (18-6-12) FERTILIZER SHALL
BE APPLIED IN EACH PLANTING HOLE ACCORDING TO MANUFACTURER'S LABEL OR OTHER SPECIFICATIONS. THE SELECTION OF
FERTILIZER AND ALL APPLICATION SPECIFICATIONS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION.
8. THE CONTRACTOR SHALL BE REQUIRED TO GUARANTEE AND MAINTAIN ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR AFTER DATE OF
ACCEPTANCE OF FINISHED PLANTING IN ACCORDANCE WITH THE APPROPRIATE SECTION OF THE SPECIAL PROVISIONS.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING CONDITIONS AS A RESULT OF ITS WORK PERFORMED DURING
THE CONTRACT PERIOD.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING ALL PLANT QUANTITIES FOR BIDDING PURPOSES.
11. PLANT LOCATIONS ARE APPROXIMATE. FIELD STAKING SHOULD BE DONE TO AVOID UNDERGROUND UTILITIES.
12. PROVIDE CONTINUOUS PINE STRAW MULCH (3" THICK) IN ALL SHRUB AND TREE AREAS AND AT THE BASE OF SPECIMEN TREES IN A 6'
MINIMUM DIAMETER.
13. SIZES OF PLANT MATERIAL IN PANT SCHEDULE ARE TO BE CONSIDERED MINIMUMS.
14. ALL UTILITIES SHALL BE LOCATED AND MARKED IN FIELD PRIOR TO INSTALLATION OF PLANTS. NO PLANTS SHALL BE LOCATED ABOVE
UTILITIES OR WITHIN EASEMENTS UNLESS SHOWN OTHERWISE.
15. DURING THE INSTALLATION OF NEW TREES, THE LANDSCAPE CONTRACTOR MUST MAINTAIN A MINIMUM DISTANCE OF 10' SEPARATION
BETWEEN NEWLY PLANTED TREES AND LIGHT POLE BASES.
PLANTING GENERAL NOTES7
L-103
IRRIGATION ELECTRIC VALVE DETAIL (DRIP ZONE)
Not to scale
IRRIGATION ELECTRIC VALVE DETAIL (PGA SERIES)
Not to scale
QUICK COUPLER DETAIL
Not to scale
SHUT-OFF VALVE DETAIL
Not to scale
PIPE INSTALLATION DETAIL
Not to scale
18" FOR NON-PRESSURE
CAP & ELL
LATERAL
TEMPORARY RISER
NON SOLVENT WELD
FINISH GRADE
NON SOLVENT WELD CAP
CONNECTION
PAVING
4" SLEEVE
24" FOR MAIN LINE
24"12"-1. ALL SLEEVES SHALL BE HIGH IMPACT, TYPE 2110, 4" SCHEDULE 40 PVC.
2. EACH SLEEVE LOCATION AS SHOWN ON SITE PLAN SHALL HAVE FOUR (2)
SLEEVES INSTALLED AT EACH LOCATION.
IRRIGATION SLEEVE DETAIL
Not to scale
IRRIGATION EQUIPMENT SCHEDULE
IRRIGATION GENERAL NOTES
1. EQUIPMENT LIST DOES NOT INCLUDE QUANTITY FOR EMITTER TUBING AND MISCELLANEOUS DRIP IRRIGATION EQUIPMENT (PUNCH-IN EMITTERS,
STAKES,... ETC.). IRRIGATION CONTRACTOR TO DETERMINE AMOUNT OF EMITTER TUBING REQUIRED TO PROVIDE IRRIGATION TO ALL NEWLY PLANTED
LANDSCAPE PLANTS AS OUTLINED IN THE IRRIGATION DRIP ZONE NOTES.
IRRIGATION EQUIPMENT SCHEDULE
EQUIPMENT DESCRIPTION MFG. MODEL # REMARKS
IRRIGATION DRIP ZONE NOTES
4
L-103
5
L-103
8
L-103
9
L-103
14
L-103
13
L-103
12
L-103
11
L-103
10
L-103
2
PAPA
4-29-21
41.64'
19.22'7.66'7.66'19.00'37.37'2.81'3.66'3.66'3.00'3.00'3.66'43.00'6.00'0.66'6.00'PROJECT #:
DRAWN BY:
CHECKED BY:
ISSUE DATE:
ADA AND LEGAL DISCLAIMER: This document is intended to comply with the requirements of the Americans with Disabilities Act (ADA). However architects and engineers are not licensed to interpret laws or give advice concerning laws. The owner should have this document reviewed by his attorney to determine if it complies with
ADA and other laws.
© SfL+a Architects, PA
All Rights Reserved
2020BIM 360://Erwin Elementary School/01905.000 - Harnett ErwinES-R18_WS.rvt11/25/2019 1:55:24 PMNorthWest Harnett Elementary SchoolHARNETT COUNTY SCHOOLSCLS/TDB
2020.200
03/31/2021736 Rollins Road, Fuquay-Varina, NC 27526PAP
No. Date Description
04/29/2021 Addendum No. 22
File: L:\SFLA-20.02 NW Harnett ES\800 - Drawings\810 Design Drawings\02 Civil\SFLA-20.02 L101 PLANTING_2.dwg, By: trent, Plotted: Wed Apr 28, 2021 at 5:48pmL-104
ADD ALTERNATE # 3
AMPITHEATER
METAL STAKE
COMPACTED OR UNDISTURBED SUBGRADE
6" MIN. ABC GRANULAR
GEOTEXTILE FABRIC LAYER
1" MIN. GRAVEL SCREENINGS
SEE SITE PLAN FOR PAVING PATTERN
PLASTIC EDGING, WHERE REQUIRED
APPROVED TOPSOIL
SECTION VIEW PLASTIC EDGE
RUNNING BOND
PLAN VIEW
RUNNING BOND PATTERN TO
RUN PARALLEL WITH
SIDEWALK
HEADER COURSE AROUND
PERIMETER OF SIDEWALK
BRICK PAVER DETAIL
SCALE: NOT TO SCALE
4
BRICK PAVER, FROM PINEHALL, ENGLISH EDGE, RUNNING BOND PATTERN. COLOR: FULL
RANGE RED (TO MATCH EXISTING CAMPUS BRICK PAVERS). PROVIDE SAMPLE FOR
APPROVAL OF COLOR BY OWNER PRIOR TO PURCHASE AND INSTALLATION.
12" DEEP SILICONE SEALANT;
RILL HOLE FLUSH WITH
CONCRETE; ENSURE
POSITIVE DRAINAGE
CONCRETE STAIR
2" DIAMETER HOLE
FORMED WITH PEEL
OUT SLEEVE; FILL WITH
NON-SHRINK GROUT
HANDRAIL
12" CHAMFER, TYP. ALL
AROUND
4000 P.S.I. CONCRETE
CHEEKWALL; SMOOTH
FORM AND HAND
RUBBED FINISH
FINISH GRADE
#4 REBAR @ 12" O.C.
4 X 2 #6 REBAR
CONTINUOUS
COMPACTED OR
UNDISTURBED
SUBGRADE COMPACTED ABC
BASE
CONCRETE
PAVING
CONCRETE PAVING
STEP LIGHT; SEE
LIGHTING PLAN
PROVIDE 12"X12"X12"
CONCRETE FOOTING
FOR HANDRAIL POST
BELOW SETTING BED;
POST TO EXTEND INTO
CONCRETE 8" MINIMUM
HANDRAIL POST TO
EXTEND INTO
CONCRETE 8" MINIMUM
#4 REBAR @ EACH
NOSING; 2" CLEAR
TYPICAL
4000 PSI CONCRETE
FOOTING
COMPACTED OR
UNDISTURBED
SUBGRADE
#4 REBAR @12" O.C.
EACH WAY; MINIMUM
2" COVERAGE
METAL HANDRAIL; SEE
1/C5.2 FOR TYPICAL
HANDRAIL DETAIL
PAVING
HANDRAIL
BRICK SEATWALL
CONCRETE STEPS
PAVING
CONCRETE STEP;
SLOPE 14" PER FOOT
TO ENSURE POSITIVE
DRAINAGE
NOTE: COORDINATE
WITH ARCHITECTURAL
PLANS
12" EXPANSION
MATERIAL
12" EXPANSION
MATERIAL
12" RADIUS EACH
NOSING
#4 REBAR @12" O.C.
(4) #6 REBAR
HORIZONTAL IN EACH
FOOTING
12" EXPANSION
MATERIAL
1.00'
1'-2"
1.00'
4.17'1.00'
0.38'
1.29'1.17'1.17'
0.17'
1.17'
2"
CONCRETE CHEEKWALL
BRICK AMPHITHEATER SEATWALL AND WINGWALL DETAIL
SCALE: NOT TO SCALE
5
2
PLAN VIEW
STEP SECTION
CHEEKWALL SECTION
L-4
CONCRETE CHEEKWALL
2
L-4
CONCRETE STEPS 4
L-4
BRICK PAVERS
RUNNING BOND WITH HEADER
BORDER (TYP. SYM.)
5
L-4
AMPHITHEATER WING WALL
3BRICK SEAT WALL
#4 REBAR @ 16" O.C.
#4 REBAR @ 12" O.C., CONTINUOUS;
CROSSING BAR @ 90 DEGREES, 12" O.C.
3500 P.S.I. CONCRETE FOOTING, STEPFOOTING DOWN WITH GRADE ASNECESSARY. USE 8" STEP DOWN ATCHANGE IN FOOTING ELEVATION
95% COMPACTED ORUNDISTURBED SUB GRADE
8" CMU BLOCKS, FILL VOIDS WITHMORTAR
BRICK VENEER (4" CMU MAY BE USED ONPLACE OF BRICK BELOW GRADE. ENSURE
6" MIN. SOIL ABOVE CMU.) WATERPROOF
ALL MASONRY BELOW GRADE
WALL SECTION
PRECAST CONCRETE CAP
LIGHT STRIP, SEE NOTE BELOW
PROVIDE 34" THICK x 12" DEEP MORTAR JOINT RECESS FOR INSTALLATION OF
LIGHT STRIP AT INNER PERIMETER, PLAZA SIDE, OF WALL BELOW CAP.
PRECAST CONCRETE CAP,3500 PSI
DRIP EDGE, 14DEEP X 14" WIDE SET
112" FROM EDGE. EACH SIDE
20"
1'-4"
BRICK VENEER TO MATCH BUILDING
CAP SECTION
BRICK SEAT WALL DETAIL
SCALE: NOT TO SCALE
3
L-4
AMPHETHEATER ENLARGEMENT
SCALE: NOT TO SCALE
1
CONCRETE SIDEWALK
#4 REBAR @ 16" O.C.
#4 REBAR @ 12" O.C., CONTINUOUS;CROSSING BAR @ 90 DEGREES, 12" O.C.
3500 P.S.I. CONCRETE FOOTING, STEPFOOTING DOWN WITH GRADE ASNECESSARY. USE 8" STEP DOWN ATCHANGE IN FOOTING ELEVATION
95% COMPACTED ORUNDISTURBED SUB GRADE
8" CMU BLOCKS, FILL VOIDS WITHMORTAR
BRICK VENEER (4" CMU MAY BE USED ONPLACE OF BRICK BELOW GRADE. ENSURE6" MIN. SOIL ABOVE CMU.) WATERPROOFALL MASONRY BELOW GRADE
PRECAST CONCRETE CAP
AMPHITHEATER SEATWALL SECTION
AMPHITHEATER WINGWALL SECTION
1.00'1.00'6.00'
HANDRAILS, SET 3" FROM FACE OFWALL, EACH SIDE
CONCRETE CHEEKWALL
BRICK PAVERS
CONCRETE STEPS
#4 REBAR @ 16" O.C.
#4 REBAR @ 12" O.C., CONTINUOUS;CROSSING BAR @ 90 DEGREES, 12" O.C.
3500 P.S.I. CONCRETE FOOTING,STEP FOOTING DOWN WITH GRADEAS NECESSARY. USE 8" STEP DOWNAT CHANGE IN FOOTING ELEVATION
95% COMPACTED ORUNDISTURBED SUB GRADE 4" CMU BLOCKS, FILL VOIDS WITHMORTAR
BRICK VENEER (8" CMU MAY BE USED ONPLACE OF BRICK BELOW GRADE. ENSURE6" MIN. SOIL ABOVE CMU.) WATERPROOFALL MASONRY BELOW GRADE
PRECAST CONCRETE CAP 1.33'
BRICK PAVERS
CONCRETE STEPS
1.33'
AMPHITHEATER SEAT WALL
5
L-4
AMPHITHEATER SEAT WALL
BRICK AMPHITHEATER SEATWALL AND WINGWALL DETAIL
SCALE: NOT TO SCALE
2
L-104
CONCRETE STEPS AND
CHEEKWALL
BRICK PAVERS
HANDRAILS
BRICK PAVERS
BRICK SEAT WALL
AMPHITHEATER SECTION
AMPHITHEATER PLAN
L-104
L-104
L-104
L-104
PAPA