Loading...
HomeMy WebLinkAboutWater ModelHI L L A R D R D .U.S. 401 N.JARED DR.H-1 H-2 H-3 H-4 H-5 H-6 H-7 H-8 H-9 H-10 H-11 H-12 H-13 H-14 H-15 H-16 H-17 H-18 H-19 H-20 H-21 H-22 H-23 H-24 H-25 H-26 H-27 H-28 J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 P-1P-2 P-3P-4P-5P-6P-7P-8P- 9 P-10P-11P-12P-13P-14P-15P-16P-17P-18P-19P-20P-21P-22P-23P-24P-25 P-26P-27P- 28 P-29 P-30 P-31 P-32 P-33 P-34 P-35 P-36 P-37 P-38P-39P-40P-41P-42P-43P-44 P-45 P-46 P-47 P-48 P-49 P-50 P-51 P-52 P-53 P-56P-57 P-58 P-59 P-61P-62P- 6 3 P-64 P-65 P-66P-67P-68P-69P-70P-71P-72P-73 P-74 P-75J-39 P-60P-54P-55BROWN ST. JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.5410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comNorth Carolina License No. C-1652THIS DRAWING PREPARED AT THERALEIGH OFFICEL:\212\45458-Harnett_401\DWG\45458-WTRMDL.dwg | Plotted on 7/9/2020 2:14 PM | by Luke SolariW1.0 PRELIMINARY HYDRAULIC ANALYSIS LAYOUT AND RESULTSL. SOLARI L. SOLARI C. PETREE 7/9/2020 HARNETT 401HARNETT COUNTY - NORTH CAROLINA 45458 N.T.S. ·FLOW INFORMATION WAS OBTAINED FROM A SIMULTANEOUS FLOW TEST PERFORMED BY TIMMONS GROUP ON 7/01/2020. FLOW TEST NODE #1 IS THE EXISTING HYDRANT LOCATED ON THE EXISTING 12 INCH WATERLINE APPROXIMATELY 1,300 FT NORTH OF THE INTERSECTION OF U.S. 401 N. AND BROWN ST. FLOW TEST NODE #2 IS THE EXISTING HYDRANT LOCATED ON THE EXISTING 6 INCH WATERLINE AT THE INTERSECTION OF HILLARD ROAD AND JARED DRIVE. THE AVAILABLE FLOW CURVES ARE SHOWN ON THIS SHEET. ·SYSTEM FLOW FOR IS REPRESENTED AT H-1 (FLOW TEST NODE #1) AND H-3 (FLOW TEST NODE #2) IN THE INCLUDED WATER MODEL LAYOUT. ·THIS WATER MODEL HAS BEEN PERFORMED TO EVALUATE AVAILABLE PRESSURE AND FLOW BASED ON THE INCLUDED WATER MODEL LAYOUT AND FLOW DEMAND CRITERIA. ALL WATERLINES WERE MODELED WITH A HAZEN-WILLIAMS ROUGHNESS COEFFICIENT OF 120. ·THE WATER MODEL LAYOUT IS BASED ON INFORMATION (SITE LAYOUT) PROVIDED BY TIMMONS GROUP. THE ELEVATION DATA WAS PROVIDED BY NC ONEMAP LIDAR CONTOURS. ·THE PROPOSED SYSTEM MUST MAINTAIN A MINIMUM RESIDUAL PRESSURE OF 30 PSI FOR ALL DOMESTIC SCENARIOS AND A MINIMUM RESIDUAL PRESSURE OF 20 PSI FOR ALL FIRE SCENARIOS. ·BASED ON THE INFORMATION PROVIDED, THE PROPOSED SYSTEM IS ADEQUATE TO MEET THE MINIMUM RESIDUAL PRESSURE REQUIREMENTS WHILE PROVIDING THE REQUIRED FLOW FOR DOMESTIC AND FIRE SCENARIOS. ·DUE TO THE HIGH HEAD CONDITIONS ONSITE PRESSURE REDUCING VALVES ARE RECOMMENDED ON THE DOMESTIC CONNECTIONS AS NEEDED. ·THE PROPOSED SYSTEM MEETS BOTH HARNETT COUNTY AND NCDEQ DESIGN STANDARDS ·AVERAGE DAILY DEMAND = 1 LOT = 400 GPD / (1440 MINUTES) = 0.278 GPM ··HARNETT 401 HAS A PROPOSED TOTAL OF 557 LOTS ···5.56 GPM (20 LOTS) AT J-1 ···3.06 GPM (11 LOTS) AT J-2 ···4.45 GPM (16 LOTS) AT J-3 ···4.73 GPM (17 LOTS) AT J-4 ···1.67 GPM (6 LOTS) AT J-5 ···1.67 GPM (6 LOTS) AT J-6 ···5.00 GPM (18 LOTS) AT J-7 ···1.67 GPM (6 LOTS) AT J-8 ···5.84 GPM (21 LOTS) AT J-9 ···3.89 GPM (14 LOTS) AT J-10 ···2.22 GPM (8 LOTS) AT J-11 ···3.89 GPM (14 LOTS) AT J-12 ···3.61 GPM (13 LOTS) AT J-14 ···3.34 GPM (12 LOTS) AT J-15 ···4.45 GPM (16 LOTS) AT J-18 ···3.89 GPM (14 LOTS) AT J-19 ···5.28 GPM (19 LOTS) AT J-20 ···2.78 GPM (10 LOTS) AT J-21 ···2.50 GPM (9 LOTS) AT J-22 ···2.50 GPM (9 LOTS) AT J-23 ···7.51 GPM (27 LOTS) AT J-25 ···7.78 GPM (28 LOTS) AT J-26 ···8.62 GPM (31 LOTS) AT J-27 ···9.17 GPM (33 LOTS) AT J-28 ···3.89 GPM (14 LOTS) AT J-31 ···7.78 GPM (28 LOTS) AT J-32 ···6.39 GPM (23 LOTS) AT J-33 ···3.61 GPM (13 LOTS) AT J-35 ···6.12 GPM (22 LOTS) AT J-36 ···6.67 GPM (24 LOTS) AT J-37 ···4.17 GPM (15 LOTS) AT J-38 ···8.34 GPM (30 LOTS) AT J-39 ·MAXIMUM DAILY DEMAND = AVERAGE DAILY DEMAND X 2.5 ·FIRE FLOW DEMAND: ··A MINIMUM OF 500 GPM IS REQUIRED AT EACH ON-SITE HYDRANT NEW PIPE EXISTING PIPE