Loading...
HomeMy WebLinkAboutNiells Interceptor Capacity Summary( N - O) / P (d/D) 36 Inch Interceptor SS1 PVC 36 0.050%0.013 66.7%5263 4570 60.0%225.04 224.79 100.00 42 Inch Interceptor SS2 PVC 42 0.050%0.013 66.7%7939 5897 54.0%367.00 366.00 163.82 48 Inch Interceptor SS3 PVC 48 0.050%0.013 66.7%11335 6941 48.0%365.80 353.90 387.88 Date:1/12/2021 A B C D E F G H I J NEILS CREEK GRAVITY SEWER ANALYSIS: MINIMUM DESIGN SLOPES PROPOSED FLOW (GPM)% FULL PROPOSED INV. OUT ELEV. INV. IN ELEV. LENGTH (FT.) N O P SSMH NUMBER PIPE SEGMENT MANNING (N)% FULL ALLOWABLE ALLOWABLE FLOW (GPM)MATERIAL DIA. (INCHES) MINIMUM DESIGN SLOPE (%) ALLOWABLE FLOW = 448.8 * (1.49/F) * (AREA @ 66.7%) * ((HYDRAULIC RADIUS @ 66.7%)^(2/3)) * √(E) PERCENT FULL = q/Qfull TO GET PROPORTIONAL FLOW DEPTH (d/D) HARNETT 401 - Downstream SSWR Capacity Summary Flow Units Notes Calculated Capacity in the 36" Interceptor 7.58 MGD Calculated based on 2/3 full Allocated Peak Flows Thru 36"6.00 MGD Based on value provided by HCDPU Future Flow through interceptor from Harnett County 0.002 MGD Future Flow from The Serenity Project 0.0558 MGD From Serenity Phase 1 & 2 Future Flow from Harnett 401 Project 0.175 MGD 480 Lots and 2.8 Acres of Commercial Total Future Flows 0.232 MGD Peaked Future Flows with 2.5 PF 0.581 MGD Multiply Total Future Flows by 2.5 Total Flows 6.581 MGD Percent Full 60.0%d/D (Calculated) Flow Units Notes Calculated Capacity in the 42" Interceptor 11.43 MGD Calculated based on 2/3 full Existing Peak Flows Thru 42"7.15 MGD Based on reported numbers from HCDPU Future Flow through interceptor from Harnett County 0.132 MGD Future Flow through interceptor from Town of Angier 0.174 MGD Flow from The Serenity 0.0558 MGD From Serenity Pump Station @ Buildout Flow from Harnett 401 0.175 MGD 480 Lots and 2.8 Acres of Commercial Total Future Flows @ Average Daily Flows 0.536 MGD Peaked Flows with 2.5 Peaking Factor 1.341 MGD Multiply Total Future Flows by 2.5 Total Flows 8.491 MGD Percent Full 54.0%d/D (Calculated) Flow Units Notes Calculated Capacity in the 4" Interceptor 16.32 MGD Calculated based on 2/3 full Existing Peak Flows Thru 42"8.30 MGD Estimated based on numbers from HCDPU Future Flow through interceptor from Harnett County 0.274 MGD Future Flow through interceptor from Town of Angier 0.174 MGD Flow from The Serenity 0.0558 MGD From Serenity Phase 1 & 2 Flow from Harnett 401 0.175 MGD 480 Lots and 2.8 Acres of Commercial Total Future Flows @ Average Daily Flows 0.678 MGD Peaked Flows with 2.5 Peaking Factor 1.696 MGD Multiply Total Future Flows by 2.5 Total Flows 9.996 MGD Percent Full 48.0%d/D (Calculated) Capacity in 36" Neills Interceptor Capacity in 42 Inch Interceptor Capacity in 48 Inch Interceptor