HomeMy WebLinkAboutCrosslink_ncdot infoSee below regarding lane widening. I have a call in to Harnett Schools
regarding bus situation.
Fleet Temple, PE
Enoch Engineers, P.A.
1403 NC Highway 50 South
Benson, NC 27504
(919) 894-7765 x.237
From: Locklear, Earl C [mailto:elocklear@ncdot.gov]
Sent: Tuesday, November 06, 2018 3:28 PM
To: Fleet Temple
Cc: Baker, Troy L
Subject: RE: [External] Future Crosslink phase
Hi Fleet,
Based on the proposed 81 lots for Cross link Place Phase 4 and the 2017
AADT (3 percent was added for 2018) roadway improvements should not be
required. A driveway permit for phase 4 is required. If additional
access is granted down Yogi Drive or Roger Lane then an additional
driveway permit will be required for SR 1441 (Chalybeate Springs Road).
If additional information is required please advise.
Thank you,
Earl
From: Fleet Temple <fleet@enochengineers.com>
Sent: Tuesday, November 06, 2018 9:30 AM
To: Baker, Troy L <tlbaker@ncdot.gov>; Locklear, Earl C
<elocklear@ncdot.gov>
Subject: [External] Future Crosslink phase
CAUTION: External email. Do not click links or open attachments unless
verified. Send all suspicious email as an attachment to Report Spam.
<mailto:report.spam@nc.gov>
Troy/Earl,
Working on a preliminary layout for possible Crosslink Phase (see
attached). Wanted to get an idea of any DOT requirements (ie lane
widening on Chalybeate Springs?) Owner is trying to get another access
down Yogi Drive or Roger Pearson Lane for emergency vehicles only
(gravel drive). Let me know what you think.
Fleet Temple, PE
Enoch Engineers, P.A.
1403 NC Highway 50 South