Loading...
HomeMy WebLinkAboutCrosslink_ncdot infoSee below regarding lane widening. I have a call in to Harnett Schools regarding bus situation. Fleet Temple, PE Enoch Engineers, P.A. 1403 NC Highway 50 South Benson, NC 27504 (919) 894-7765 x.237 From: Locklear, Earl C [mailto:elocklear@ncdot.gov] Sent: Tuesday, November 06, 2018 3:28 PM To: Fleet Temple Cc: Baker, Troy L Subject: RE: [External] Future Crosslink phase Hi Fleet, Based on the proposed 81 lots for Cross link Place Phase 4 and the 2017 AADT (3 percent was added for 2018) roadway improvements should not be required. A driveway permit for phase 4 is required. If additional access is granted down Yogi Drive or Roger Lane then an additional driveway permit will be required for SR 1441 (Chalybeate Springs Road). If additional information is required please advise. Thank you, Earl From: Fleet Temple <fleet@enochengineers.com> Sent: Tuesday, November 06, 2018 9:30 AM To: Baker, Troy L <tlbaker@ncdot.gov>; Locklear, Earl C <elocklear@ncdot.gov> Subject: [External] Future Crosslink phase CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> Troy/Earl, Working on a preliminary layout for possible Crosslink Phase (see attached). Wanted to get an idea of any DOT requirements (ie lane widening on Chalybeate Springs?) Owner is trying to get another access down Yogi Drive or Roger Pearson Lane for emergency vehicles only (gravel drive). Let me know what you think. Fleet Temple, PE Enoch Engineers, P.A. 1403 NC Highway 50 South Benson, NC 27504 (919) 894-7765 x.237 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.