Loading...
HomeMy WebLinkAboutSpecial Intensity AllocationSpecial Nonresidential Intensity Allocation 10/70 Rule - 10% of the protected watershed may be developed to a maximum of 70% for Non residential developments. Per NCDENR DWQ, the Watershed Administrator is allowed to approve the SIA’s. WS-IV Classification Protected Area 58,821 acres Critical Area 267 acres (NCDENR reviews stormwater plans) Lillington (minus their area) 2,560 acres Total 56,528 acres Ten percent of the WS-IV protected area comes to 5,652.8 acres Project Percent of Impervious Surface Total acres of Impervious Surface Total acres Date approved 10% Protected Area 5,652.8 acres  Pleasant Union Christian Church 44% 1.8 ac 4.09 ac 07/30/03 5,651 remaining  NorthWest Harnett VFD 39.6% 1.524 ac 3.85 ac 05/13/04 5,649.48  Keith Hills West Townhomes 56.56% 1.81ac 3.2 ac 04/04/06 5,647.67  Dollar General @ Bunnlevel 45% .72 ac 1.59 ac 6/22/11 5,646.95  Brightwater Technology Park (38.74 ac reserved) 70% 90.38 129.12 ac 6/30/11 5,556.57  Brick Mill Square 61.51% 5.34 ac 9.36 ac Under review 5,221.23  Campbell Village Townhomes 56.8% .83 ac 1.46 ac 11/13/12 5,220.40  Townes at Hartwell 58% .95 ac 1.64 3/11/12 5,219.45  SHC Apartments 50.7% .75 ac 1.49 7/8/13 5,218.70  Townhomes on Main 55% .24 .44 3/10/14 5,218.46  Stancil/Bradley Built Towns 43% 2.3 5.3 4/14/14 5,216.16         Project Percent of Impervious Surface Total acres of Impervious Surface Total acres Date approved 10% Protected Area 5,652.8 acres  Rick Gilchrist Co., INC Jarco Ind. Site 69.7% 2.80 4.00 NA Project not started 5,216.16 remaining  Campbell Pointe Townhomes 45.1% 6.55 14.53 5/11/15 5,209.81 Remaining  JAKS Development Group – Brickyard Landing 44.1% 0.48 1.107 Approved 07/11/16 5,213.33 Remaining  Campbell Pointe Townhomes Project #2 48% 6.96 14.51 Approved 5,203.37 Remaining  Meredith Square Appt. Expansion 42% 2.98 7.1 Approved 8/13/18 5,200.39 Remaining  Buttonwoods, LLC Concrete Plant 66.9% 3.9 5.83 Approved 10/8/18 5,196.49 Remaining  GAP Properties, LLC 65% 2.6 4.00 Approved 2/11/19 5,193.89 Remaining  Jim Moore Storage Facility 69% 1.71 2.4 Approved 3/14/19 Remaining 5,192.18  Gardner Storage Facility 50% 2.5 5.0 Approved Date 9/9/19 Remaining 5,189.68  Medlin Storage Facility 62.5% 3.71 5.72 Disapproved Date 9/9/19 Remaining 5,189.68  Farthing Industrial Site Jarco 54% 1.49 2.74 Hearing Date 2-10-2020 Proposed Remaining 5188.19