Loading...
HomeMy WebLinkAbout1350-FINAL PLANSSCOTTSCOTTCHRIS1350NOT TO SCALEVICINITY MAPNEILLS CREEK TOWNSHIPLILLINGTON, NORTH CAROLINAHARNETT COUNTYINDEX OF DRAWINGSC1.0 - SITE PLANC2.0 - GRADING AND EROSION CONTROL PLANC2.1 - DRAINAGE AREA MAPC3.0 - PROFILESC4.0 - EROSION CONTROL & STORM DETAILSC4.1 - EROSION CONTROL & STORM DETAILSBRIGHTWATER STORM PONDSSITE DEVELOPMENT PLANSTHE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATEDEXISTING UTILITY OWNERWATER AND SEWERHARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES700 McKinney ParkwayLillington, NC 27546910-893-7575Contact: Shane Cummings, PEOWNER/DEVELOPERHARNETT COUNTY900 South 9th StreetLillington, North Carolina 27546910-814-6156Contact: Amanda Bader, PEemail: abader@harnett.orgSURVEYOR4D SITE SOLUTIONS, INC.409 Chicago Drive - Suite 112Fayetteville, North Carolina 28306910-426-6777Contact: Jimmy Holland, PLSemail: jholland@4dsitesolutions.comCIVIL ENGINEER4D SITE SOLUTIONS, INC.409 Chicago Drive - Suite 112Fayetteville, North Carolina 28306910-426-6777Contact: Scott Brown, PEemail: sbrown@4dsitesolutions.comKnow what'sbelow.before you dig.CallRSEAL027452N O R TH CAROLINAPR O FESSIONALC.SCOTT BROW NENGINEER SITEI:\Harnett County Engineering\1350-Brightwater\CIVIL 3D\DWG\1350-DESIGN.dwg l 00 CS l 1.23.2019 11:24:32 AM BRIGHTWATERSTORMPONDSHARNETTCOUNTYENGINEERING900 South 9th StreetLillington, North Carolina 27546Phone:(910) 814-6156Fax:(910) 814-4041REVISIONSDRAWING SCALEDATE RELEASEDSEE SHEETSPROJECT NAMECLIENTPROJECT INFORMATIONDESIGNED BY:DRAWN BY:CHECKED BY:PROJECT NUMBER:ISSUED FOR CONSTRUCTIONJANUARY 23, 2019TAX ID# 0560-79-1646.000BRIGHTWATER DRIVENEILLS CREEK TOWNSHIPLILLINGTONHARNETT COUNTYNORTH CAROLINASITE US 401 N / W CORNELIUS HARNETT BLVDBRIGHTWATER DRIVE - SR 2288 BRIGHTWATER DR IVE - SR 2288CRESTED IRIS DRIVE - SR 2290 119812713VICINITY MAPNOT TO SCALEHORIZONTAL: 1"=40'I:\Harnett County Engineering\1350-Brightwater\CIVIL 3D\DWG\1350-DESIGN.dwg l C1.0 SITE l 1.23.2019 11:25:00 AM SEAL027452NO R TH CAROLINAPR O FESSIONALC.SCOTT BROWNENGINEERSITE PLANBRIGHTWATERSTORMPONDSHARNETTCOUNTYENGINEERING900 South 9th StreetLillington, North Carolina 27546Phone:(910) 814-6156Fax:(910) 814-4041REVISIONSDRAWING SCALEC-1.0SHEET NUMBERPROJECT NAMECLIENTPROJECT INFORMATIONISSUED FOR CONSTRUCTIONSCOTTSCOTTCHRIS1350DATE RELEASEDDESIGNED BY:DRAWN BY:CHECKED BY:PROJECT NUMBER:JANUARY 23, 2019SITE225217 US 401 N / W CORNELIUS HARNETT BLVDBRIGHTWATER DRIVE - SR 2288 BRIGHTWATER DR IVE - SR 2288CRESTED IRIS DRIVE - SR 2290 16 2 15 8 16 1 15 9 15 7 16 1 16116 1161 16015815715 1 15 3 15 5 15 5 15 4 15 9 15 8 15 6 15 7 15 7 15 9 16 0 15 2 15 3 16 0 162157 157 158156154155156157157155154 157156 157 155153 158157 156154153157 158161159159146 147152152154155156154154157156154152153 154146149146148148149156 119812713VICINITY MAPNOT TO SCALETHE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATEDKnow what'sbelow.before you dig.CallRI:\Harnett County Engineering\1350-Brightwater\CIVIL 3D\DWG\1350-DESIGN.dwg l C2.0 G&EC l 1.23.2019 11:25:25 AM HORIZONTAL: 1"=40'SEAL027452NO R TH CAROLINAPR O FESSIONALC.SCOTT BROWNENGINEERGRADING ANDEROSIONCONTROL PLANBRIGHTWATERSTORMPONDSHARNETTCOUNTYENGINEERING900 South 9th StreetLillington, North Carolina 27546Phone:(910) 814-6156Fax:(910) 814-4041REVISIONSDRAWING SCALEC-2.0SHEET NUMBERPROJECT NAMECLIENTPROJECT INFORMATIONISSUED FOR CONSTRUCTIONSCOTTSCOTTCHRIS1350DATE RELEASEDDESIGNED BY:DRAWN BY:CHECKED BY:PROJECT NUMBER:JANUARY 23, 2019SITE225217 16 2 15 8 16 1 15 9 15 7 16 1 16116 1161160158 15715 1 15 3 15 5 15 5 15 4 15 9 15 8 15 6 15 7 15 7 15 9 16 0 15 2 15 3 16 0 162157 157 158156154155156157157155154 157156157 155153 158157 156154153157 158161159159146 147152152154155156154154157156154152153 154146149146148148149156 VICINITY MAPNOT TO SCALETHE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATEDKnow what'sbelow.before you dig.CallRI:\Harnett County Engineering\1350-Brightwater\CIVIL 3D\DWG\1350-DESIGN.dwg l C2.1 DRAINAGE AREA l 1.23.2019 11:25:50 AM HORIZONTAL: 1"=40'SEAL027452NO R TH CAROLINAPR O FESSIONALC.SCOTT BROWNENGINEERDRAINAGE AREAMAPBRIGHTWATERSTORMPONDSHARNETTCOUNTYENGINEERING900 South 9th StreetLillington, North Carolina 27546Phone:(910) 814-6156Fax:(910) 814-4041REVISIONSDRAWING SCALEC-2.1SHEET NUMBERPROJECT NAMECLIENTPROJECT INFORMATIONISSUED FOR CONSTRUCTIONSCOTTSCOTTCHRIS1350DATE RELEASEDDESIGNED BY:DRAWN BY:CHECKED BY:PROJECT NUMBER:JANUARY 23, 2019SITE225217 STORM DRAIN -0+50 TO 1+50WET POND #2STORM DRAIN -0+50 TO 1+00RI-3 TO FES-4162158161159157 161 161161160158157151153155155154 159 158156157157 159160 152 153 160158161161160158157153155156159160STORM DRAIN -0+50 TO 2+00WET POND #1STORM DRAIN -0+50 TO 1+00RI-1 TO FES-2157 157158156156 157157155154157156 157 155153 158 157 157159146 147152152154155156154154157156154152153 1541461491461481481567 157156154155 1 5 61571571 5 5 154157156 154 1 5 2 146 1 4 8 148I:\Harnett County Engineering\1350-Brightwater\CIVIL 3D\DWG\1350-DESIGN.dwg l C3.0 PRO l 1.23.2019 11:35:36 AM SEAL027452NO R TH CAROLINAPR O FESSIONALC.SCOTT BROWNENGINEERSTORMPROFILESBRIGHTWATERSTORMPONDSHARNETTCOUNTYENGINEERING900 South 9th StreetLillington, North Carolina 27546Phone:(910) 814-6156Fax:(910) 814-4041REVISIONSDRAWING SCALEC-3.0SHEET NUMBERPROJECT NAMECLIENTPROJECT INFORMATIONISSUED FOR CONSTRUCTIONSCOTTSCOTTCHRIS1350DATE RELEASEDDESIGNED BY:DRAWN BY:CHECKED BY:PROJECT NUMBER:JANUARY 23, 2019HORIZONTAL: 1"=40'VERTICAL: 1"=4' 1691072354811I:\Harnett County Engineering\1350-Brightwater\CIVIL 3D\DWG\1350-DESIGN.dwg l C4.0 DETAILS l 1.23.2019 11:14:19 AM SEAL027452NO R TH CAROLINAPR O FESSIONALC.SCOTT BROWNENGINEEREROSIONCONTROL &STORM WATERDETAILSBRIGHTWATERSTORMPONDSHARNETTCOUNTYENGINEERING900 South 9th StreetLillington, North Carolina 27546Phone:(910) 814-6156Fax:(910) 814-4041REVISIONSDRAWING SCALEC-4.0SHEET NUMBERPROJECT NAMECLIENTPROJECT INFORMATIONISSUED FOR CONSTRUCTIONSCOTTSCOTTCHRIS1350DATE RELEASEDDESIGNED BY:DRAWN BY:CHECKED BY:PROJECT NUMBER:JANUARY 23, 2019NOT TO SCALETEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER)SEEDING MIXTURE:SPECIES RATE (LB./ACRE)GERMAN MILLET 40A SMALL-STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE.SEEDING DATES:MAY 1 - AUGUST 15SOIL AMENDMENTS:FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750LB./ACRE 10-10-10 FERTILIZER.MULCH:APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.MAINTENANCE:REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWINGEROSION OR OTHER DAMAGE.TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL)SEEDING MIXTURE:SPECIES RATE (LB./ACRE)RYE (GRAIN) 120SEEDING DATES:AUGUST 15 - DECEMBER 30SOIL AMENDMENTS:FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND1,000 LB./ACRE 10-10-10 FERTILIZER.MULCH:APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.MAINTENANCE:REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IFIT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZAIN LATE OR EARLY MARCH.TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING)SEEDING MIXTURE:SPECIES RATE (LB./ACRE)RYE (GRAIN) 120ANNUAL KOBE LESPEDEZA 50OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE.SEEDING DATES:JANUARY 1 - MAY 1SOIL AMENDMENTS:FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750LB./ACRE 10-10-10 FERTILIZER.MULCH:APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.MAINTENANCE:REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWINGEROSION OR OTHER DAMAGE.TEMPORARY SEEDING SPECIFICATIONSPERMANENT SEEDING SPECIFICATIONSSEEDING SPECIFICATIONSSEEDING MIXTURES:SPECIES RATE (LBS./ACRE)TALL FESCUE 80PENSACOLA BAHIAGRASS 50SERICEA LESPEDEZA 30KOBE LESPEDEZA 10SEEDING NOTES:1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED.2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB./ACRE.3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE.NURSE PLANTS:BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1OR AFTER AUG. 15, ADD 25 LB./ACRE RYE (GRAIN).SEEDING DATES: BEST POSSIBLEEARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31SOIL AMENDMENTS:APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURALLIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER.MULCH:APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BYTACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITHBLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.MAINTENANCE:IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS ORTOP DRESS WITH 500 LB./ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE.RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY.SEEDING SPECIFICATIONSSEEDING MIXTURE:SPECIES RATE (LB./ACRE)COMMON BERMUDAGRASS 40-80(1-2 LB./1,000 FT²)SEEDING DATES:COASTAL PLAIN: APR. - JULYSOIL AMENDMENTS:APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONEAND 500 LB./ACRE 10-10-10 FERTILIZER.MULCH:USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OFCHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ONCHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP.MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOGDRAINAGE DEVICES.MAINTENANCE:A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY.REFERTILIZE THE FOLLOWING APR. WITH 50 LB./ACRE NITROGEN.GENERAL EROSION AND SEDIMENT CONTROL NOTES1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE ANDSTRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALLBE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THEMINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTHCAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK.2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITYONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONEWEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBINGACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION.3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURESARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE.4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROLPLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREASOTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOTLIMITED TO OFF-SITE BORROW OR WASTE AREAS, STAGING ORSTORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMITA SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FORREVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL.CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALLNECESSARY MEASURES AT NO SEPARATE PAYMENT. THECONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER ACOPY OF THE AMENDED PERMIT.6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANYADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENTEROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENROR THE ENGINEER.7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENTCONTROL MEASURES AT ALL TIMES DURING LAND DISTURBINGACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINALSTABILIZATION IS ACHIEVED.8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISEIMPROVED SHALL BE SODDED OR SEEDED AS INDICATED ANDSTABILIZED.9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPEDINTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TORECEIVING OUTLET.10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROLMEASURES WEEKLY AND AFTER EACH RUNOFF-PRODUCING EVENT.ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THEEFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BEMADE IMMEDIATELY.11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BEREMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENTGROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THEENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED.12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BEREQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES ANDALL CONSTRUCTION ACCESS LOCATIONS INTO NON-PAVED AREA.13. WHEN CROSSING CREEK OR DRAINAGE-WAY, THE CONTRACTORSHALL RIP-RAP WITH FABRIC DISTURBED BANKS AND CHANNEL ANDRESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZEDIMMEDIATELY.MAINTENANCEMAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD ORSEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAYREQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACHRAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT ANDCLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALLOBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTOPUBLIC ROADWAYS.CONSTRUCTION VEHICLES. AVOID STEEP GRADESAND ENTRANCES AT CURVES IN PUBLIC ROADS.CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL2-3" COURSE MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER.REQUIRED FOR STAGING AND/OR BORROW AREAS ANDCONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINALCONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVELCONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS PUBL IC ROAD6" MIN. THICKNESSACCEPTANCE.1 2 ' m i n .50' min.6"AGGREGATE SIZE - USE 2-3 INCH WASHED STONEWIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESSPOINTS OF THE VEHICULAR ENTRANCE AND EXIT LOCATION - LOCATE CONSTRUCTION ENTRANCES ANDEXITS TO LIMIT SEDIMENT FROM LEAVING THE SITEAND TO PROVIDE FOR MAXIMUM UTILITY BY ALLGRAVEL CONSTRUCTION ENTRANCEDIMENSION OF GRAVEL PADTHICKNESS - 6 INCHES MINIMUMAREA, WHICHEVER IS GREATERLENGTH - 50 FT. MINIMUM.WITH 20 FOOT RADIUS AT EXISTINGIN LENGTH AND 12 FEET IN WIDTHGRAVEL ENTRANCE SHALL BE 50 FEETDESIGN CRITERIAFILTER FABRICROADWAY36'-0" MIN2-3" WASHED STONE4'-0"10'-0"AGGREGATETEMPORARY GRAVEL CONSTRUCTION ENTRANCENTSMAINTENANCEINSPECT TEMPORARY SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OFSIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINALDIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGNDEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITHSEDIMENT CONTROLS.CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE ANDINSPECT THE EMBANKMENT FORPIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVEALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA.TEMPORARY SEDIMENT BASINNTSCONSTRUCTION SPECIFICATIONS1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TOREMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.DELAY CLEARING THE POOL AREA UNTIL THE DAM IS COMPLETE AND THENREMOVE BRUSH, TREES, AND OTHER OBJECTIONABLE MATERIALS TO FACILITATESEDIMENT CLEANOUT. STOCKPILE ALL TOPSOIL OR SOIL CONTAINING ORGANICMATTER FOR USE ON THE OUTER SHELL OF THE EMBANKMENT TO FACILITATEVEGETATIVE ESTABLISHMENT. PLACE TEMPORARY SEDIMENT CONTROLS BELOWTHE BASIN AS NEEDED.2. EXCAVATE CUT-0FF TRENCH ALONG THE CENTER LINE OF THE EARTH FILLEMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL, BUT IN NO CASEMAKE IT LESS THAN 2 FEET DEEP. THE CUT-OFF TRENCH MUST EXTEND INTOBOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. MAKETHE MINIMUM BOTTOM WIDTH WIDE ENOUGH TO PERMIT OPERATION OFEXCAVATION AND COMPACTION EQUIPMENT, BUT IN NO CASE LESS THAN 2 FEET.MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 1:1. COMPACTIONREQUIREMENTS ARE THE SAME AS THOSE FOR THE EMBANKMENT. KEEP THETRENCH DRY DURING BACKFILLING AND COMPACTION OPERATIONS.3. EMBANKMENT - TAKE FILL MATERIAL FROM THE APPROVED AREAS SHOWN ONTHE PLANS. IT SHOULD BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODYVEGETATION, ROCKS, AND OTHER OBJECTIONABLE MATERIAL. SCARIFY AREASON WHICH FILL IS TO BE PLACED BEFORE PLACING FILL. THE FILL MATERIALMUST CONTAIN SUFFICIENT MOISTURE SO IT CAN BE FORMED BY HAND INTO ABALL WITHOUT CRUMBLING. IF WATER CAN BE SQUEEZED OUT OF THE BALL, IT ISTOO WET FOR PROPER COMPACTION. PLACE FILL MATERIAL IN 6 TO 8 INCHCONTINUOUS LAYERS OVER THE ENTIRE LENGTH OF THE FILL AREA ANDCOMPACT IT. COMPACTION MAY BE OBTAINED BY ROUTING THE CONSTRUCTIONHAULING EQUIPMENT OVER THE FILL SO THAT THE ENTIRE SURFACE OF EACHLAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR TREAD TRACK OF HEAVYEQUIPMENT, OR A COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENTTO AN ELEVATION 10% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FORSETTLING.4. SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE AWATERTIGHT STRUCTURAL CONNECTION. SECURE ALL CONNECTIONS BETWEENBARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THEBARREL AND RISER ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DONOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE ASBACKFILL AROUND THE PIPE OR ANTISEEP COLLARS. PLACE THE FILL MATERIALAROUND THE PIPE SPILLWAY IN 4 INCH LAYERS, AND COMPACT IT UNDER ANDAROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENTEMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM FIRMCONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPEHAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACKFILLOVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTIONEQUIPMENT. ANCHOR THE RISER IN PLACE BY CONCRETE OR OTHERSATISFACTORY MEANS TO PREVENT FLOTATION. IN NO CASE SHOULD THE PIPECONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THEEMBANKMENT IS COMPLETE.5. INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THEACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, ANDENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFULOPERATION OF THE EMERGENCY SPILLWAY.6. DISCHARGE THE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION.USE DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT-LADENWATER TO THE UPPER END OF THE POOL AREA TO IMPROVE TRAP EFFICIENCY.7. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED.DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THEEMBANKMENT BEFORE THE AREA IS CLEARED.8. INSTALL POROUS BAFFLES AS SPECIFIED.9. AVOID STEEP SIDE SLOPES, AND FENCE AND MARK BASINS WITH WARNINGSIGNS IF TRESPASSING IS LIKELY. FOLLOW ALL STATE AND LOCALREQUIREMENTS.NOTES1. SEED AND PLACE MATITNG FOR EROSION CONTROL ON INTERIOR ANDEXTERIOR SIDESLOPES.2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICESTANDARD 6.65.3. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTOEMBANKMENT 1 FT. FROM BOTTOM OF BASIN.4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THESKIMMER AND COUPLING.SILT FENCEAA #9 WIRE STAPLES 1-1/2" LONGMIN. 12-1/2 GA.LINE WIRES MIN. 12-1/2 GASTAY WIRES MIN. 10 GA. WIRETOP & BOTTOM STRAND ATTACH WIRE FENCE TO POSTS AND EXTENDDRIVE STEEL POSTS 18" INTO THE GROUNDSTEP 2FENCE. BURIED FABRIC SHALL NOT BE VISIBLE.FIRMLY TO ANCHOR THE BOTTOM OF THE SILT BACKFILL THE TRENCH AND COMPACT THE SOILEXCAVATED TRENCH AND TURNED OUTTHE BOTTOM OF THE FENCE 8" INTO THESTEP 4EXCAVATED TRENCH & TURNEDBOTTOM OF WIRE FENCE ANDFILTER FABRIC BURIED 8" INWIRE FENCE "HOG WIRE"FILTER FABRICPOSTS MAX 8' O.C.STEP 1STEP 3EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE TRENCH AND TURNED OUT 4" IN THE TRENCH.ATTACH THE FILTER FABRIC TO THE WIRE FENCE,TRENCH UPHILL ALONG THE LINE OFPOSTS.MAXIMUM 8' O.C. AND EXCAVATE A 4" X 8"FLOWSECTION A-ASTEEL POST DRIVEN 24" INTO GROUNDHEIGHT MAX 18"STEEL POSTSOUT 4" IN THE TRENCH4" IN THE TRENCH.NOTES:1. WIRE SHALL BE A MINIMUM OF 32 INCHES IN WIDTH ANDSHALL HAVE A MINIMUM OF 6 WIRES WITH 12" STAY SPACING.2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH ANDSHALL BE FASTENED ADEQUATELY TO THE WIRE WITH #9 WIRESTAPLES 1-1/2" LONG. FABRIC THAT DETERIORATES TO SUCHEXTENT THAT IT'S EFFECTIVENESS IS REDUCED SHALL BEREPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE.3. STEEL POSTS SHALL BE A MIN. OF 5' HEIGHT AND SHALL BETHE SELF FASTENER ANGLE STEEL TYPE.4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEKAND AFTER EACH RAINFALL OCCURRENCE. ANY NECESSARYREPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OFTHE DEVICE SHALL BE MADE IMMEDIATELY.5. REMOVE DEPOSITED SEDIMENT ALONG THE FENCE TOPROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCEPRESSURE ON THE FENCE AS NEEDED.5. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THECONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENRREPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THECONTRIBUTING DRAINAGE AREA IS STABLE.MAINTENANCE1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY.2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY.3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCEPRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE AFTERTHE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL.NTSBOTTOM OF FABRIC BURIED 8"IN EXCAVATED TRENCH &TURNED OUT 4" IN THETRENCH, OR PINNED WITH 8"EROSION CONTROL MATTINGSTAPLES.SUPPORT WIRE ORROPEBACKFILL THE TRENCH AND COMPACT THE SOILFIRMLY TO ANCHOR THE BOTTOM OF THE SILTFENCE. BURIED FABRIC SHALL NOT BE VISIBLE.THE TOP OF THE FABRIC SHALL BE 6" HIGHERTHAN THE WEIR.ATTACH THE JUTE NETTING OR OTHER FABRICAPPROVED BY THE ENGINEER TO THE STAY WIREAND POSTS, EXTEND THE BOTTOM OF THE FABRIC8" INTO THE TRENCH AND TURNED OUT 4" IN THETRENCH OR USE 8" EROSION CONTROL MATTINGSTAPLES.ATTACH WIRE FENCE TO POSTS AND EXTENDTHE BOTTOM OF THE FENCE 8" INTO THEEXCAVATED TRENCH AND TURNED OUT 4" INTHE TRENCH.DRIVE POSTS 24" INTO THE GROUNDMAXIMUM 4' O.C. AND EXCAVATE A 4" X 8"TRENCH UPHILL ALONG THE LINE OFPOSTS.NOTES:1. GRADE THE BASIN SUCH THAT THE BOTTOM IS LEVEL2. INSTALL THE BAFFLES AS SHOWN ON THE GRADING PLAN.BAFFLES SHALL EXTEND THE FULL WIDTH OF THE BASIN.3. DO NOT SPLICE THE FABRIC, USE A CONTINUOUS PIECEACCROSS THE BASIN OR TRAP.4. POSTS FOR THE BAFFLES SHALL BE 4' OC.MAINTENANCE1. INSPECT THE BAFFLES EACH ACTIVE DAY ON SITE BUT INNO CASE LESS THAN ONCE PER WEEK AND AFTER EACHRAINFALL EVENT. MAKE ANY REPAIRS IMMEDIATELY.2. REMOVE SEDIMENT DEPOSITS WHEN THE MEASUREREACHES HALF FULL. TAKE CARE TO AVOID DAMAGING THEBAFFLES WHEN THE SEDIMENT IS REMOVED.3. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THECONTRACTOR UNTIL THIS ACTION IS APPROVED BY ANNCDENR REPRESENTATIVE. THE ACTION WILL BEAPPROVED WHEN THE CONTRIBUTING DRAINAGE AREA ISSTABLE.4. PLACEMENT OF BAFFLES: INLET ZONE- 35% OF LENGTH FROM ENTRY POINT FIRST CELL - 25% OF LENGTH FROM INLET ZONE SECOND CELL - 25% OF LENGTH FROM FIRST CELL OUTLET ZONE - 15% OF LENGTH FROM SECOND CELLSTEEL POSTSHEIGHT MAX 18"24" INTO GROUNDSTEEL POST DRIVEN SECTION A-AFLOWSTEP 3STEP 1POSTS MAX 4' O.C.JUTE NETTING OR EQUIVILENTTOP STAY WIRE OR ROPESTEP 4STEP 2AAPERSPECTIVE VIEWPOROUS BAFFLESNTSTYPICAL RIP RAP APRONNTSSECTION A-APLANWET POND X-SECTION WITH GABION BAFFLESNTSNTSVEGETATED SHELF PLANTING DETAILGABION BAFFLEGABION SPECIFICATIONSMATERIALGABIONS SHALL BE MADE OF WELDED STEEL WIRE MESH OF ANOMINAL SIZE OF 3” X 3”. THE WELDED STEEL WIRE SHALL BE PVCCOATED IN ALL APPLICATIONS PERTAINING TO THE GABION.DIMENSIONSGABIONS SHALL BE BUILT IN VARIOUS LENGTHS AND HEIGHTS. THELENGTH SHALL BE IN MULTIPLESOF THE WIDTH. THE WIDTH SHALL NOT BE LESS THAN 3'. DIMENSIONSFOR HEIGHTS, WIDTHS AND LENGTHS ARE SUBJECT THE APPLICATIONAND PURPOSE. IF THE LENGTH IS INCREASED BY A MULTIPLE OF THEWIDTH THE BASKET SHALL HAVE A WIRE WALL DIAPHRAGM SEWN INTOITS INTERIOR TO MAINTAIN THE SHAPE OF THE BASKET.FABRICATIONGABIONS SHALL BE FABRICATED IN SUCH AWAY THAT THE BASE, SIDES,LIDS, ENDS, AND DIAPHRAGMS CAN BE ASSEMBLED AT THECONSTRUCTION SITE INTO A RECTANGULAR UNIT OF THE SPECIFIEDSIZE. THE LID SHALL BE A SEPARATE UNIT OF THE SAME MESH ANDWIRE SPECIFICATIONS AS THE BODY. THE WELD SHEAR STRENGTHSHALL COMPLY WITH ASTM A-185-90A. WHERE THE LENGTH OF THEGABION EXCEEDS ITS WIDTH, THE GABION SHALL BE DIVIDED BYDIAPHRAGMS INTO CELLS OF EQUAL LENGTH. THE WIRE MESH SHALLBE MADE OF GALVANIZED STEEL WIRE HAVING A MINIMUM DIAMETEROF 3 MM. ALL WIRE USED IN THE FABRICATION OF THE GABION AND INTHE WIRING OPERATIONS SHALL CONFORM TO US FEDERALSPECIFICATION QQ-W-461H AND POSSESS A SOFT TENSILE STRENGTHWITH A CLASS 3 FINISH 5 ZINC COATING IN ACCORDANCE WITH ASTMA-641. PREFORMED STEEL WIRE SPIRAL BINDERS WITH A 3” PITCH AREUSED TO ASSEMBLE AND INTERCONNECT EMPTY GABIONS AND SHALLMEET THE SAME SPECIFICATION AS THE WIRE USED IN THE MESH.AFTER ASSEMBLY, THE INDIVIDUAL GABION UNITS AREINTERCONNECTED USING THE SAME WIRE AND THE CONNECTIONSHOULD BE MADE NO LESS THAN EVERY 6” ALONG THE PERIMETER.THEY SHOULD THEN FILLED WITH CLEAN, HARD STONE FROM 4” - 8”INDIAMETER. THE LIDS ARE THEN CLOSED AND JOINED TO THE TOPEDGES OF THE INDIVIDUAL GABIONS AND DIAPHRAGMS. THE USE OFEXPEDIENT CLIPS OR HOG RINGS FOR THIS PURPOSE IS NOTPERMITTED.IF PROPERLY CONSTRUCTED, THE LIDS AND PANELS SHOULD MEETCLOSELY WITHOUT GAPS AND THAT THE TIES PROVIDE A TIGHT JOINTAT ALL PANELS AND DIAPHRAGMS.NTS 1562347I:\Harnett County Engineering\1350-Brightwater\CIVIL 3D\DWG\1350-DESIGN.dwg l C4.1 DETAILS l 1.23.2019 11:09:39 AM SEAL027452NO R TH CAROLINAPR O FESSIONALC.SCOTT BROWNENGINEEREROSIONCONTROL &STORM WATERDETAILSBRIGHTWATERSTORMPONDSHARNETTCOUNTYENGINEERING900 South 9th StreetLillington, North Carolina 27546Phone:(910) 814-6156Fax:(910) 814-4041REVISIONSDRAWING SCALEC-4.1SHEET NUMBERPROJECT NAMECLIENTPROJECT INFORMATIONISSUED FOR CONSTRUCTIONSCOTTSCOTTCHRIS1350DATE RELEASEDDESIGNED BY:DRAWN BY:CHECKED BY:PROJECT NUMBER:JANUARY 23, 2019NOT TO SCALEFAIRCLOTH SKIMMERNTSANTI-SEEP COLLARNTSGROUND STABILIZATION CHARTNTSEMERGENCY SPILLWAYNTS1. INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE ACHIEVEMENTOF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXITCHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THEEMERGENCY SPILLWAY.2. ALTERNATIVE MATERIALS MAY BE USED OTHER THAN THE SPECIFIED STONE IFAPPROVED BY THE DESIGN ENGINEER.3. MAX SIDE SLOPES ARE 3:1FLARED END SECTIONNTSTRASH RACKNTSSTORM BASIN RISER WITH ORIFICE DETAILNTSMAINTENANCE:INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVESEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETSAND MAKE TIMELY REPAIRS AS NEEDED.TEMPORARY DIVERSION KEY NOTES:1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS.2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES.3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE FOR LESS THAN 30 DAYS.TEMPORARY DIVERSION BERMNTS8