HomeMy WebLinkAboutLRSM site pl pg 5=m
GRAVEL ENTRANCE SHALL BE 50 FEET DESIGN CRI TER I A
IN LENGTH AND 20 FEET IN WIDTH AGGREGATE SIZE - USE 2-3 INCH WASHED STONE r r
WITH 20 FOOT RADIUS AT EXISTING DIMENSION OF GRAVEL PAD THICKNESS - 6 INCHES x z
ROADWAY MINIMUM Cr < < W
WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT
36' MIN 4' 10' ACCESS POINTS OF THE VEHICULAR ENTRANCE AND CL z
EXIT AREA, WHICHEVER IS GREATER 0 � p z
LENGTH - 50 FT. MINIMUM. W O WLLJ
z
CL m U) LL
P :� 6" MIN. LOCATION - LOCATE CONSTRUCTION ENTRANCES AND 0-10
THICKNESS EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE
AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL 30' UNDISTURBED 25'
FILTER 2-3" CONSTRUCTION VEHICLES. AVOID STEEP GRADES
FABRIC WASHED STONE AND ENTRANCES AT CURVES IN PUBLIC ROADS. BUFFER
CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL 2' 10'
CONSTRUCTION ENTRANCES NOT INDICATED ON THE
PLANS REQUIRED FOR STAGING AND/OR BORROW
GRAVEL CONSTRUCTION ENTRANCE '-
AREAS AND MAINTAIN AT NO ADDITIONAL EXPENSE 10
TO THE OWNER.
CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN
GRAVEL CONSTRUCTION ENTRANCES AT HIS EXPENSE;_
�ip UNTIL FINAL ACCEPTANCE.
til - 2
C, CONSTRUCTION ENTRANCE USE:
Q� WILL PROVIDE A BARRIER AREA WHERE VEHICLES
CAN DROP THEIR MUD AND SEDIMENT AS WELL AS BERM
HELP CONTROL EROSION FROM SURFACE RUNOFF. TOBE e ``
AS PEERATED AS DETTAIL.PER THE REFER TOANS SECTIONC6.06RUCED
OFT
THE
f ,
NCDENR EROSION AND SEDIMENT CONTROL PLANNING � �
AND DESIGN MANUAL. ji
6" MIN. 1� JFc -l1�j 7:,1111 illi
THICKNESS o� o- CONSTRUCTION ENTRANCE MAINTENANCE: I!' =i,
2-3" COURSE t���FJ MAINTAIN THE GRAVEL PAD IN A CONDITION TO
AGGREGATE 'h 41 C. PREVENT MUD OR SEDIMENT FROM LEAVING THE
h� CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC
TOP DRESSING WITH 2 - 3 INCH STONE. INSPECT
DAILY, AND AFTER EACH RAINFALL, ANY
STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT
OUT AS NECESSARY. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED OR
TRACKED ONTO PUBLIC ROADWAYS.
CONSTRUCTION ENTRANCE
40' HAUL ROAD
VEGETATIVELY STABLIZE
DISTURBED AREAS
BY SEEDING (BERM & PIT)
FINIS
GRADE
APPX. TOE OF BORROW
PIT EXCAVATION
' MAX STANDARD STREN61H hAbHIC e1it+ elrct YGVLt_
FRONT VIEW ql
Hi
MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE
MINIMUM 10 GAUGE
BERM & P
III WIRE FENCE
SEDIMENT FENCE USE
SEDIMENT FENCE
III FABRIC WILL RETAIN SEDIMENT FROM SMALL DISTURBED AREAS. SEDIMENT
W
III FENCE WILL BE PLACED ALONG SLOPES AS SHOWN ON CONSTRUCTION
uiO
NIII 8" DEPTH x 4" WIDTH DETAILS. REFER TO SECTION 6.62 OF THE NCDENR EROSION AND
II
LINE WIRES (TOP &
BACKFILLED TRENCH SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
� III
J
III EXTEND WIRE FENCE
6" BELOW GRADE SEDIMENT FENCE MAINTENANCE
BOTTOM)
SEDIMENT`
INSPECT SEDIMENT FENCES DAILY AND AFTER EACH RAINFALL. MAKE
!I
II
I ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A
FENCE FABRIC
o III ANCHOR MATERIALS SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME
INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS
N III AS DIRECTED BY
AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE
MINIMUM 12-1/2
ENGINEER (NOTE 4) NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO
INSTALLED TO
EXTEND FABRIC B" DOWN AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL
FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING
AND 4" FORWARD ALONG
SIDE VIEW THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING
GAUGE INTERMEDIATE
ry
WIRE
NOTES:
1. USE SEDIMENT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED
QWIRES
WSECOND
cr Q
T
1/4 -ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW.
2. END OF SEDIMENT FENCE NEEDS TO BE TURNED UPHILL.
Ir
GRADE
2W
UFROM
--I
Z
[I ZLL]
IMMEDIATELY.
4. PLACE WIRE FENCE 6" BELOW GRADE AND SEDIMENT FABRIC 8" DOWN
0: O W O WD
AND 4" FORWARD ALONG TRENCH BOTOM, BACKFILL AND THOROUGHLY
0_ m LL m (n LL
N
N
O
rn
0
n
0
0
N
O
0
n
N
CL
BARNHILL
CONTRACTING
COMPANY
UNDISTURBED 1 23' BUFFER
BUFFER
30' HAUL ROAD
TION (
NOT TO
APPX. TOE OF BORROW
PIT EXCAVATION
EXCAVATED BORROW PIT
FINISH
2 MA
11
PIT EXCAVATION SECTION (B—B')
NOT TO SCALE
DIRECTION OF PIT
EXCAVATION AND
G-YQANICTf1N1
GROUND N,
FINISH
GRADE
i
LE
EXCAVATED BORROW PIT
INISH
DIRECTION OF PIT
EXCAVATION AND
FXPONIgTnm
GROUND N
W
-1—W Q
.� o
U�
O 12 60
ch � o
o }; To U
QN 0 O
w �N Z
bq C V N
��0
)00
C> 0000
L
ov Oo._
O 0) LL
(D ° >sU
Nu-a.Z
W
Lu
FRONT VIEW ql
Hi
STEEL POST
III WIRE FENCE
SEDIMENT FENCE USE
SEDIMENT FENCE
III FABRIC WILL RETAIN SEDIMENT FROM SMALL DISTURBED AREAS. SEDIMENT
W
III FENCE WILL BE PLACED ALONG SLOPES AS SHOWN ON CONSTRUCTION
uiO
NIII 8" DEPTH x 4" WIDTH DETAILS. REFER TO SECTION 6.62 OF THE NCDENR EROSION AND
J
BACKFILLED TRENCH SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
� III
J
III EXTEND WIRE FENCE
6" BELOW GRADE SEDIMENT FENCE MAINTENANCE
GRADE
INSPECT SEDIMENT FENCES DAILY AND AFTER EACH RAINFALL. MAKE
II
I ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A
o III ANCHOR MATERIALS SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME
INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS
N III AS DIRECTED BY
AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE
ENGINEER (NOTE 4) NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO
EXTEND FABRIC B" DOWN AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL
FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING
AND 4" FORWARD ALONG
SIDE VIEW THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING
TRENCH DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.
NOTES:
1. USE SEDIMENT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED
1/4 -ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW.
2. END OF SEDIMENT FENCE NEEDS TO BE TURNED UPHILL.
3. REMOVE SEDIMENT DEEPER THAN 12" AND REPAIR ANY UNDERMINING
IMMEDIATELY.
4. PLACE WIRE FENCE 6" BELOW GRADE AND SEDIMENT FABRIC 8" DOWN
AND 4" FORWARD ALONG TRENCH BOTOM, BACKFILL AND THOROUGHLY
COMPACT TRENCH WITH NCDOT #57 STONE. FOR REPAIRS, REPLACE
STONE TO GRADE AND COMPACT AS NEEDED.
C
0
5. CONTRACTOR SHALL BE RESPONSIBILE FOR PLACEMENT AND REMOVAL
c
0
OF FENCE.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING DISTURBED
AREAS TO PRE -CONSTRUCTION CONDITION.
0
i
o
SEDIMENT FENCE
N
N
O
rn
0
n
0
0
N
O
0
n
N
CL
BARNHILL
CONTRACTING
COMPANY
UNDISTURBED 1 23' BUFFER
BUFFER
30' HAUL ROAD
TION (
NOT TO
APPX. TOE OF BORROW
PIT EXCAVATION
EXCAVATED BORROW PIT
FINISH
2 MA
11
PIT EXCAVATION SECTION (B—B')
NOT TO SCALE
DIRECTION OF PIT
EXCAVATION AND
G-YQANICTf1N1
GROUND N,
FINISH
GRADE
i
LE
EXCAVATED BORROW PIT
INISH
DIRECTION OF PIT
EXCAVATION AND
FXPONIgTnm
GROUND N
W
-1—W Q
.� o
U�
O 12 60
ch � o
o }; To U
QN 0 O
w �N Z
bq C V N
��0
)00
C> 0000
L
ov Oo._
O 0) LL
(D ° >sU
Nu-a.Z
W
Lu
z
W
W
uiO
J
J
PRELIMINARY
REVISIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE:
DATE:
SEPTEMBER XX, 2017
PROJECT NUMBER:
17090523-01
DT -01