Loading...
HomeMy WebLinkAboutsp NBHES pg 6copyright 2017 Hite associates Tj, o�'OFo� RIPRAP HEADWALL, 1'-0„ MIN. HEIGHT FROM ROADSIDE Z5 SHOULDER K lFES PPE l 2 -r DIRECTION �LD� � SPA`J OF FLOW �F. / - l i NOTES: i FILTER BERM � � �:>�`r � � h„ � � 1. WHEN USED IN COMBINATION WITH AN EXCAVATED SEDIMENT STORAGE NC DOT *5 OR *57 AREA TO SERVE AS A TEMPORARY SEDIMENT TRAP,THE DESIGN CRITERIA FOR a 1 � WASHED STONE r $ F "04; -z _ i, 1 TEMPORARY SEDIMENT TRAPS MUST BE SATISFIED. THE MAXIMUM DRAINAGE AREA SHOULD BE 5 ACRES, AND 36DO CUBIC FEET OF SEDIMENT STORAGE - =*� PER ACRE OF DISTURBED DRAINAGE AREA SHOULD BE PROVIDED. CLASS "B" STONE RIPRAP 2. THE MINIMUM STONE HEIGHT SHOULD BE 2 FEET, WITH SIDE SLOPES NO STEEPER THAN 2:1. THE STONE "HORSESHOE" AROUND THE PIPE INLET SHOULD BE CONSTRUCTED OF CLASS B OR CLASS I RIPRAP, WITH A MINIMUM CREST WIDTH OF 3 FEET. THE OUTSIDE FACE OF THE RIPRAP SHOULD BE COVED WITH A 12 -INCH THICK LAYER OF #5 OR #57 WASHED STONE. 3. IN PREPARING PLANS FOR ROCK PIPE INLET PROTECTION, IT IS IMPORTANT TO - PROTECT THE EMBANKMENT OVER THE PIPE FROM OVERTOPPING. THE TOP O¢F F� OF THE STONE SHOULD BE A MINIMUM OF 1 FOOT BELOW THE TOP OF THE FILL O OVER THE PIPE. THE STONE SHOULD TIE INTO THE FILL ON BOTH SIDES OF THE PIPE. THE INSIDE TOE OF THE STONE SHOULD BE NO CLOSER THAN 2 FEET FILTER BERM FROM THE CULVERT OPENING TO ALLOW PASSAGE OF HIGH FLOWS. NC DOT *5 OR *57 WASHED STONE 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED UPSTREAM OF THE ROCK PIPE INLET PROTECTION, WITH A MINIMUM DEPTH OF 18 INCHES BELOW 12" 3'-0" CLASS "B" STONE GRADE. RIPRAP FINISH GARDE `'- RIPRAP HEADWALL, 1'-0" MIN. HEIGHT FROM ROADSIDE ' SHOULDER ' { ` FES PIPE - -.; .. ,FF PI AN DIRECTION N OF FLOW "77-7 • Will • ' • • . • INSTALL T -POST TO ANCHOR BAFFLE TO SIDE OF BASIN AND SECURE TO VERTICAL POST WITH PLASTIC TIES AT POSTS AND ON WIRE EVERY 12"°I MM. 9 GAUGE MIN. HIGH - VARIABLE DEPTH TENSION WIRE STRAND m i ,1I`" - SHALL BE SECURED TO POST TO SUPPORT BAFFLE MATERIAL�i BAFFLE MATERIAL SECURE BOTTOM OF BAFFLE CROSS SECTION TO GROUND WITH 12" STAPLES AT 12" MAXIMUM SPACING BAFFLE MATERIAL 11 GAUGE LANDSCAPE STAPLE BAFFLE MATERIAL SHALL BE SECURED — TO THE BOTTOM AND SIDES OF BASIN I_=� USING 12" LANDSCAPE STAPLES NOTE: INSTALL THREE (3) COIR FIBER S7FEL POST BAFFLES IN SILT BASINS AND SEDIMENT DAMS AT DRAINAGE :SECTION VIEW AT OPENING OUTLETS WITH A SPACING OF Y4 THE BASIN LENGTH. TWO (2) COIR FIBER BAFFLES CAN BE INSTALLED IN COIR FIBER BAFFLE SILT BASINS AND DAMS LESS THAN 20 FT, IN LENGTH WITH A SPACING NOT TO SCALE MG NO. EC -25A OF b THE BASIN LENGTH. DRAPE BAFFLE MATERIAL OVER TENSION WIRE ANDSECURE WITH PLASTIC WIRE TIES AT 12" O.C. 11 GAUGE X 12" LONG LANDSCAPING STAKES SPACED AT 12" O.C. MIN. SECTION BAFFLE INSTALLATION DRAPE BAFFLE MATERIAL OVER TENSION WIRE ANDSECURE WITH PLASTIC WIRE TIES AT 12" O.C. 11 GAUGE X 12" LONG LANDSCAPING STAKES SPACED AT 12" O.C. MIN. 9 GAUGE TENSION WIRE SECURED TO POST STEEL POST BURIED TO /—A DEPTH OF 2'-0" MIN. r` FLOW STRAP - - - FLOW J FILTER BAG FLOW } FLOW PUMP DISCHARGE HOSE 12 IN MIN. MULCH, LEAF/WOOD COMPOST, WOODCHIPS, STRAP PLAN VIEW SAND, OR. STRAW BALES SLOPE _OW 5% MAX. ELEVATION FILTER BAG 8 IN MIN. CONSTRUCTION SPECIFICATIONS L TIGHTLY SEAL SLEEVE AROUND THE PUMP DISCHARGE HOSE WITH A STRAP OR SIMILAR DEVICE. 2. PLACE FILTER BAG ON SUITABLE BASE (E.G., MULCH, LEAF/WOOD COMPOST, WOODCHIPS, SAND, OR STRAW 0 A LEVEL OR 51 MAXIMUM SLOPING SURFACE. DISCHARGE TO A TR BALES) LOCATED A N STABILIZED AREA. A.EXTENDBASE A MINIMUM OF 12" FRM EDGES OF BAG. 3. CONTROL PUMPING RATE TO PREVENT EXCESSIVE PRESSURE WITHIN THE FILTER BAG IN ACCORDANCE WITH THE MANUFACTURER RECOMMENDATIONS. AS THE BAG FILLS WITH SEDIMENT, REDUCE PUMPING RATE. 4. REMOVE AND PROPERLY DISPOSE OF FILTER BAG UPON COMPLETION OF PUMPING OPERATIONS OR AFTER BAG HAS REACHED CAPACITY,WHICHEVER OCCURS FIRST. SPREAD THE DEWATERED SEDIMENT FROM THE BAG IN AN APPROVED UPLAND AREA AND STABILIZE WITH SEED AND MULCH BY THE END OF THE WORK DAY. RESTORE THE SURFACE AREA BENEATH THE BAT TO ORIGINAL CONDITION. UPON REMOVAL OF THE DEVICE. 5. USE NONWOVEN V GEOTEXTILE WITH DOUBLE STITCHED SEAMS USING HIGH STRENGTH THREAD. SIZE SLEAVE TO ACCOMMODATE A MAXIMUM 4 INCH DIAMETER PUMP DISCHARGE HOSE. THE BAG MUST BE MANUFACTURED FROM A NONWOVEN GEOTEXTILE THAT MEETS OR EXCEEDS MINIMUM AVERAGE ROLL VALUES (MARV) FOR THE FOLLOWING: GRAB TENSILE 250 LB ASTM D-4632 PUNCTURE 150 LB ASTM D-4833 FLOW RATE 70 GAL/MIN/FT 2 ASTM D-4491 PERMITTIVITY (SEC `1) 1.2 SEC -1 ASTM D-4491 UV RESISTANCE 70% STRENGTH @ 500 HOURS ASTM D-4355 APPARENT OPENING SIZE (AOS) 0.15-0.15 MM ASTM D-4751 SEAM STRENGTH 90% ASTM D-4632 6. REPLACE FILTER BAG IF BAG CLOGS OR HAS RIPS, TEARS OR PUNCTURES. DURING OPERATION KEEP CONNECTION BETWEEN PUMP HOSE AND FILTER BAG WATER TIGHT. REPLACE BEDDING IF IT BECOMES DISPLACED. 303.6 FILTER BAG DETAIL SCALE: NONE cvunllco GEOTEXTILE 4' MIN. SOIL STABILIZATION GEOTEXTILE — - — - — - — - — - — - — �-------------------------- 1' MIN. OF DITCH CLASS B STONE PAD PLAN VIEW RIGID COUPLING DAM NOTES: 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OWFRSION OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY, WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. ANCHOR TENSION 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE 5 WITH T -POST OR BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES. POST AS REQUIRE 4. BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET. 5: TOPS OF BAFFLES SHOULD BE 21NCHES LOWER THAN THE TOP OF THE BERMS 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL 303.2 SEDIMENT BASIN BAFFLE INSTALLATION SCALE: NONE STAKE OR *10 REBAR POST T MIN. L 1' MAX>4� ��" 7�7,*�*��. PLACE SEALANT .AROUND BARRELL PIPE, 6" MIN. MIN. WIDTH W/ SKIMMER EXIS FILTER EMERGENCY SPILLWAY 10 MII PI ASTIC I INFR NOTES: ISOMETRIC 1. ACTUAL LAYOUT TO BE DETERMINED IN FIELD. 2. THE "CONCREE WASHOUT" SHALL BE INSTALLED WITHIN 30 FEET OF THE TEMPORARY CONCRETE WASHOUT FACILITY. 3 PIT CAPACITY IS MINIMUM OF 6 CF PER 10 CY OF CONCRETE 4 CONTRACTOR TO COORDINATE WITH USAGE CONTRACTING OFFICER FOR PROPER DISPOSAL OF CONCRETE. /--6" HT. BLACK LETTERS 1' MIN. UNCLASSIFIED EARTH MATERIAL SOIL STABILIZATION GEOTEXTILE (18" MIN OVERLAP) NATURAL GROUND DIVERSION SWALE SECTION STONE X 24" PLYWOOD NTED WHITE BOLTS 44 WOOD T SECTION LINER =57 STONE 303,5 CONCRETE WASHOUT PIT d511) CD SCALE: NONE W j PVC ORIFICE PIPE W/ /Z" DIA HOLES (3 ROWS - 8) ~- END CAP W a PVC TEE tz PVC ELBOW - (TYP) C to to 0 o° END CAP PVC VENT PIPE END CAP ARM ASSEMBLY PVC PIPE C 2:1 SIDE SLOPES LINED WITH 2:1 SIDE SLOPES LINED UV RESISTANT TARP SEE PLAN VIEW FOR WIDTH WITH UV RESISTANT TARP —I I N I _ X11-111= ITi� I—ll— I—�IL�II ��I IL I —III=III— I �I I I 11—I I I— I1=111=11 X11=1TI��� =11TlII I�illllll="" EMERGENCY SPILLWAY SECTION PVC VENT PIPE PVC TEE W•Pr l.01111AILWA i PVC ELBOW (TYP) WATER SURFACE PIPE WITH DIA HOLES IOWS - 8) ELY ARM ASSEMBLY PVC PIPE MILE PIPE BOTTOM SURFACE END VIEW SIDE VIEW NOTE: ALL PIPE PVC SCHEDULE 40 303.3 SKIMMER DEWATERING SCALE: NONE INLET ZONE DIVERSION SWALE DEVICE PVC VENT PIPE PSC ELBOW (1P) U LLI Z IL o ro END CAP Z — ui y 0 PVC TEE. U O U roi (9 Z H d v Z' N LL Lu z 04 Z = Ln N N (9 W w W RW j o U AVERAGE AREA' WIDTH 'W" - L AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPLE SPILLWAY ELEVATION PLAN VIEW (NTS) IBANKMENT :IMMER =WATERING DEVICE )UTLET PIPE EMERGENCY SPILLWAY NOTES: 1. DEWATERING -ALLOW THE MAXIMUM REASONABLE DETENTION PERIOD BEFORE THE BASIN IS COMPLETELY DEWATERED (AT LEAST 48 HOURS) 2 INFLOW RATE -REDUCE THE INFLOW VELOCITY AND DIVERT ALL SEDIMENT -FREE RUNOFF 303,1 SECTION @ TEMPORARY SEDIMENT BASIN SCALE: NONE L ICU N @ C Q 0/� 0 U E / v/ L W 0 W 4-1 :0z C rr0� V , Avg UJ 4-0 CUL C d 4 n� MW W Z w; ('r) M 1 G �T 10 MIL PLASTIC LINER I ;' N I l S A+ }. q f 32 •� M �S'4^4+`. { A Z `���"�' +�,i�3`�k4�3 ^'FG' t'��,i"<*�'d"'� � E W M t\ - - - C� PLAN Z O Z � 303,5 CONCRETE WASHOUT PIT d511) CD SCALE: NONE W j PVC ORIFICE PIPE W/ /Z" DIA HOLES (3 ROWS - 8) ~- END CAP W a PVC TEE tz PVC ELBOW - (TYP) C to to 0 o° END CAP PVC VENT PIPE END CAP ARM ASSEMBLY PVC PIPE C 2:1 SIDE SLOPES LINED WITH 2:1 SIDE SLOPES LINED UV RESISTANT TARP SEE PLAN VIEW FOR WIDTH WITH UV RESISTANT TARP —I I N I _ X11-111= ITi� I—ll— I—�IL�II ��I IL I —III=III— I �I I I 11—I I I— I1=111=11 X11=1TI��� =11TlII I�illllll="" EMERGENCY SPILLWAY SECTION PVC VENT PIPE PVC TEE W•Pr l.01111AILWA i PVC ELBOW (TYP) WATER SURFACE PIPE WITH DIA HOLES IOWS - 8) ELY ARM ASSEMBLY PVC PIPE MILE PIPE BOTTOM SURFACE END VIEW SIDE VIEW NOTE: ALL PIPE PVC SCHEDULE 40 303.3 SKIMMER DEWATERING SCALE: NONE INLET ZONE DIVERSION SWALE DEVICE PVC VENT PIPE PSC ELBOW (1P) U LLI Z IL o ro END CAP Z — ui y 0 PVC TEE. U O U roi (9 Z H d v Z' N LL Lu z 04 Z = Ln N N (9 W w W RW j o U AVERAGE AREA' WIDTH 'W" - L AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPLE SPILLWAY ELEVATION PLAN VIEW (NTS) IBANKMENT :IMMER =WATERING DEVICE )UTLET PIPE EMERGENCY SPILLWAY NOTES: 1. DEWATERING -ALLOW THE MAXIMUM REASONABLE DETENTION PERIOD BEFORE THE BASIN IS COMPLETELY DEWATERED (AT LEAST 48 HOURS) 2 INFLOW RATE -REDUCE THE INFLOW VELOCITY AND DIVERT ALL SEDIMENT -FREE RUNOFF 303,1 SECTION @ TEMPORARY SEDIMENT BASIN SCALE: NONE Project No. 21613 Date: January2017 Drawing no. C L ICU N @ C Q 0/� 0 U E / v/ L W 0 W 4-1 :0z C rr0� V 41 C 0 Avg UJ 4-0 CUL C 1 n� MW W Z Project No. 21613 Date: January2017 Drawing no. C