Loading...
HomeMy WebLinkAboutsp NBHES pg 5copyright 2017 Hite associates SITE AREA DESCRIPTION GENERAL SITE NOTES SEED BED PREPARATION AND MULCHING SCHEULE PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS COMPLETE GRADING BEFORE PREPARING SEEDBEDS, AND HIGH -QUALITY WATER (HOW) ZONES - 7 DAYS INSTALL ALL NECESSARY EROSION CONTROL PRACTICES SUCH AS Phase 1 Initial Site Clearing and Grubbing Plan SWALES AND BASINS. MINIMIZE STEEP SLOPES. IF SOILS HAVE SLOPES 3:1 OR FLATTER 14 DAYS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL 1. OBTAIN PLAN APPROVALS AND ALL APPLICABLE PERMITS. PLOW. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED 2. FLAG LIMITS OF ROUGH GRADING FOR BUILDING SITE, PARKING LOTS AND ESTABLISH GRADE OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, 250 LIMITS AS NEEDED. RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE 3. CONTACT LAND QUALITY SECTION AT 919-791-4200 THEN HOLD PRECONSTRUCTION MEETING WITH OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR CHECK GRADING CONTRACTOR, EROSION CONROL ADMINISTRATOR PROJECT ENGINEER AND OWNER BEFORE SEEDING. DAM BEFORE WORK BEGINS TIME SITE IS STABILIZED WITH VEGETATIVE COVER OR PARKING AREA SUBGRADE IS 4. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE UPON.. THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF 5. INSTALL THE PERIMETER SEDIMENT FENCES AS THE FIRST CONSTRUCTION ACTIVITY PRIOR TO APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE AS (0 SITE. CLEAR ONLY ENOUGH TO INSTALL SILT FENCE, TEMPORARY SKIMMER BASINS AND STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE 4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT DIVERSIONS IN THE WOODED AREA. KIND OF SEED TO BE USED SHALL BE DETERMINED BY THE ENGINEER. 6. INSTALL TEMPORARY SKIMMER BASINS AND DIVERSIONS AND INSTALL TEMPORARY SEDIMENT TEMPORARY SEDIMENT FENCE ° BASIN WITH RISER AND BARRELL. DISPOSE OF SOIL IN THE TEMPORARY STOCK PILE. CLEAR ONLY LIME -.. TONS/AC -- --- BUFQF ENOUGH TO INSTALL MEASURES AND STABILIZE IMMEDIATELY. 10-10-20..__-....-------....--.....--.----..-_....100 00 LBS/AC Phase 2 Site Clearing Grubbing Plan --.-------------------------.500 LBS/AC 0-20-0---------------------- - and __( STRAW MULCH-- ---.._ .............2 TON/AC AFTER SEEDING 1. CLEAR REMAINING WOODS AND GRUB THE REMAINING STUMPS. ASPHALT TACK -------- ....... ---._---_400 GALLTON OF MULCH 2. STRIP SITE OF TOPSOIL AND STOCKPILE IN THE DESIGNATED AREA 3. INSTALL PERIMEER SILT FENCE AROUND THE STOCKPILE AREAS AND SEED IN ACCORCANCE WITH GERMAN MILLET 40 THE SEEDING TIME REQUIREMENTSAND SCHEDULE. Grubbing Phase 2 Site 1. Clearing and Plan BEGIN THE GRADING OPERATION FOR ENTRY ROAD, PARKING LOTS AND BUILDINGSTS 2'-0" 2. BEGINGRADINGAND FILLING THE SOCCER, BASEBALL AND SOFTBALL FIELDS. INSTALL ROLLED " SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION EROSION CONTROL PRODUCT (RECP) MATTING UPON THE COMPLETION OF 6 FOOT INCREMENTS OF COMPACTED SOIL EXPOSED SLOPE. 3. ATTOPOF FILL SLOPES INSTALL TEMPORARY BERMS AND SLOPE DRAINS WITH OUTLET X, PROTECTION. PROTECTION. 4. Install stone drainage piping and end of day measures./ \ 5. INSTALL CONCRETE WASHOUT AREA PRIOR TO CONSTRUCTION OF STORM DRAINAGE>ri\~'i �y STRUCTURES. 9. 1F THE SLOPE TOWARD THE ROAD EXCEEDS 21, CONSTRUCT A RIDGE 6" TO 8" HIGH 6. Install inlet protection around catch basins and drop inlets and install rip rap protection and energy disipators. /�/� NN i' //�/��%\/j\ij��j /� \/f,(✓/\//\i�\ /\%\i'/\ �i� /%�%�\/j�, /\\/�\ 7. FINAL GRADE THE BUILDING PADs and athletic fields install gravel and curb and GUTTER IN \ ✓i//i�.'\/,� \/�/� i////��;.:11 i�. // //�/ PREPARATION FOR LAYDOWN AREA. / 6 0 8. FINE GRADE AND PAVE SIDEWALK, driveway and parking lots AND LAY DOWN GRAVEL FOR GRAVEL 10. PLACE GEOTEXTILE FABRIC ON GRADED FOUNDATION TO IMPROVE STABILITY, ESPECIALLY FIRE LANE. 9. PROVIDE A GROUND COVER (TEMPORARY OR PERMANENT) ON EXPOSED SLOPES 14 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING FOR SLOPES 3:1 OR FLATTER INCLUDING ALL OTHER SLOPES 4:1 ORFLATTER. PROVIDE A GROUND COVER (TEMPORARY OR TEMPORARY EARTH E WASHED STOP PERMANENT) ON EXPOSED SLOPES WITHIN 7 CALENDAR DAYS FOLLOWING COMPLETION OF ANY 302,1 PHASE OF GRADING FOR SLOPES 3:1 OR STEEPER INCLUDING ALL PERMANENT DIKES, SWALES, DITCHES AND SLOPES AND DISTRUBANCES WITHIN HIGH QUALITY WATER (HQWQ) ZONES. SCALE: NONE 10. ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED BY THE TRAP OR BASIN STATE OR OWNER IF DEEMED NECESSARY. 11. MAINTAIN PERMANENT VEGETATION BY TOP DRESSING WITH 700 LBS PER ACRE OF FERTILIZER EVERY 6 MONTHS UNTIL THE COMPLETION OF THE PROJECT. 12. WITHIN 6" OF FINAL GRADE, RE -DISTRIBUTE 6" OF TOP SOIL 13. FINE GRADE, PERMANENTLY SEED AND MULCH ALL LANDSCAPED AREAS 14. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES UPON COMPLETION AND STABILIZATION OF PROJECT. MAINTENANCE PLAN 1. All erosion and sediment control practices will be checked for stability and operation run-off in rainfall b in no case less than once eve week. An following every n-0iFprodua g ra but every Y needed repairs willbe made immediately to maintain allpractices as designed. 2. Sed'rnentwillbe removed from behind the siltfence when itbecomes 0.5 feet deep. 3. Sedimentwillbe removed from the sedknenthap and storm inlet sediment trap when the storage has been approximately 50°% filled. Gravel will be cleaned and replaced when the sediment pool no longerdrains properly. 4. All seeded areas will be fertilized, reseeded a necessary, and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. )W DIVERSI NEW STABILIZATION TIMEFRAMES SITE AREA DESCRIPTION STABILIZE TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS NONE HIGH -QUALITY WATER (HOW) ZONES - 7 DAYS - NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10'OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1,14 DYAS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN WIN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMTERS AND HQW ZONES PLANNED EROSION AND SEDIMENT CONTROL DEVICES STEEL FENCE POST DE GEOTEXTIL FAR PRTOI TEMPORARY GRAVEL CONSTRUCTION ENTRANCE A. PERMANENT SEEDING AFTER APRIL 15 AND BEFORE SEPTEMBER 15. PRACTICE 6.06 STONE FILTER SEEDING MIXTURE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE IS TO BE USED AT STREET CONNECTION. (ESPECIALLY IMPORTANT WHERE t< DIMENSIONS ARE TO BE AS INDICATED ON PLANS. THE CONTRACTOR HAS THE PREROGATIVE 250 - --WET AREAS ARE ANTICIPATED) -- --- -- -- - TO IDENTIFY A SINGLE ENTRANCE AND TREAT SAID ENTRANCE WITH THIS PROTECTIVE B. PERMANENT SEEDING AFTER SEPTEMBER 15 AN BEFORE APRIL 15. MEASURE. IF, HOWEVER BOTH ENTRANCES ARE USED DURING CONSTRUCTION, CONTRACTOR O SEEDING MIXTURE SHALL PROTECT BOTH WITH TEMPORARY GRAVEL. dr P� TEMPORARY STONE DROP INLET PROTECTION 250 \�G ROPO PRACTICE 6.51 ANNUAL RYE (SEPTEMBER 15 THRU APRIL 15) 50 O tt1 8" HIGH CHECK BEYOND JUNE. SEDIMENT FENCE IS TO BE USED AROUND ALL YARD INLETS AND CATCH BASINS UNTIL SUCH DAM TIME SITE IS STABILIZED WITH VEGETATIVE COVER OR PARKING AREA SUBGRADE IS s, 3. ENTRANCES SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL COVERED WITH CABC. POSSIBLE N CONSTRUCTION VEHICLES. (0 COASTAL PLAIN - DEC. 1 -APRIL 15 4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APRIL 30 v� 6" THICK TEMPORARY SEDIMENT FENCE ° C7 e PRACTICE 6.62 BUFQF FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 = STONE INLET PROTECTION IS TO BE USED AS NEEDED TO PROTECT AREAS AS SHOWN. SILT n� W FENCE IS TO BE PLACED AS SHOWN ON PLANS AND ANY OTHER AREAS SUBJECT SEEDING MIXTURE TO DISCHARGING SEDIMENT DIRECTLY INTO CANALS AND DITCHES. (CONT'D) IleeeeL 6. APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE /S STABILIZED. CITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL EROSION CONTROL GERMAN MILLET 40 MEASURES SHOULD THE PLAN OR ITS IMPLEMENTATION PROVE TO BE INADEQUATE. SEEDING DATES SEED OR OTHERWISE PROVIDE GROUND COVER DEVICES. Z PURPOSE + TO PROVIDE A BUFFER AREA WHERE VEHICLES CAN DROP THEIR MUD AND VEGETATION PLAN SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION MIN. LI FES PIPE AS INDICA TED ON GRADING & EROSION CONTROL PLAN STONE (ROUND FES PIPE AS. NOTED 4 EROSION CONTROL PLAN BRIC UNDERLINER 302.9 TYPICAL RIP RAP DETAIL SCALE: NONE LENGTH = THE DISTANCE SUCH THAT POINTS A & B ARE EQUAL IN ELEVATION 21/z GAUGE MEDIATE WIRES FILTER FABRIC SHALL HAVE MIN. 857 FILTERING EFFICIENCY. A MIN. TENSILE STRENGTH OF 30LB PER LINEAR INCH, AND A MIN. SLURRY FLOW RAE OF 0.3 GAL PER SQ FT. MIN. - NOTE: WIRE SHALL BE A MINIMUM OF 32" WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12 STAY SPACING. ULTRAVIOLET RESISTANT (BLACK) FABRIC SHALL BE A MIN. OF 36" IN WIDTH AND SECURED TO WIRE WITH METAL. CLIPS. OR WIRE AT B'` OFF CENTER. CARRY 12 FABRIC AND WIRE 6" INTO TRENCH. BACKFILL AND COMPACT. STEEL POST SHALL BE SELF -FASTENER ANGLE STEEL TYPE - 5'-0" IN LENGTH. 302,6 TEMPORARY SILT FENCE SCALE: NONE ?B CHECK �-�}tvr'o I,-��c,_ DAM A CLASS "B" STONE 12" of NCDOT "5 w OR •57 STONE 2 rv. . w z FILTER FABRIC 1I - a N ,nx CENTER LINE SWALE 4'to 6' 30265 ROCK CHECK DAM SCALE: NONE STEEL FENCE POST DE GEOTEXTIL FAR PRTOI ROCK CHECK DAM SPACING A. PERMANENT SEEDING AFTER APRIL 15 AND BEFORE SEPTEMBER 15. STA61L ZE FOUNDATIOIN STONE FILTER SEEDING MIXTURE RATE (LB/ACRE) (ESPECIALLY IMPORTANT WHERE t< FALCON FESCUE 250 - --WET AREAS ARE ANTICIPATED) -- --- -- -- - n u - B. PERMANENT SEEDING AFTER SEPTEMBER 15 AN BEFORE APRIL 15. COA67WXTM E7VIR#AX AOTM O SEEDING MIXTURE RATE (LB/ACRE) dr P� FLACON FESCUE GRAIN 250 \�G ROPO DIVERSION RIDGE ANNUAL RYE (SEPTEMBER 15 THRU APRIL 15) 50 O tt1 8" HIGH SEEDING DATES BEYOND JUNE. d 2" TO 3" COARSE AGRREGATE s, 3. ENTRANCES SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL BEST POSSIBLE N CONSTRUCTION VEHICLES. (0 COASTAL PLAIN - DEC. 1 -APRIL 15 4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APRIL 30 0- 6" THICK n� 06 C7 e T.. BUFQF FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 = '> n� W 5. ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP /MMEO/ATEL Y. SEEDING MIXTURE VEGETATION PLAN (CONT'D) IleeeeL 21/z GAUGE MEDIATE WIRES FILTER FABRIC SHALL HAVE MIN. 857 FILTERING EFFICIENCY. A MIN. TENSILE STRENGTH OF 30LB PER LINEAR INCH, AND A MIN. SLURRY FLOW RAE OF 0.3 GAL PER SQ FT. MIN. - NOTE: WIRE SHALL BE A MINIMUM OF 32" WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12 STAY SPACING. ULTRAVIOLET RESISTANT (BLACK) FABRIC SHALL BE A MIN. OF 36" IN WIDTH AND SECURED TO WIRE WITH METAL. CLIPS. OR WIRE AT B'` OFF CENTER. CARRY 12 FABRIC AND WIRE 6" INTO TRENCH. BACKFILL AND COMPACT. STEEL POST SHALL BE SELF -FASTENER ANGLE STEEL TYPE - 5'-0" IN LENGTH. 302,6 TEMPORARY SILT FENCE SCALE: NONE ?B CHECK �-�}tvr'o I,-��c,_ DAM A CLASS "B" STONE 12" of NCDOT "5 w OR •57 STONE 2 rv. . w z FILTER FABRIC 1I - a N ,nx CENTER LINE SWALE 4'to 6' 30265 ROCK CHECK DAM SCALE: NONE 3023TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SCALE: NONE TRENCH UPSTREAM END OF STORM DRAIN Section A -A DETAIL 2 �1 dCE POST � STEEL FENCE POST DE GEOTEXTIL FAR PRTOI 1/3 PIPE C. TEMPORARY SEEDING DURING WINTER MONTHS (SEPT. 15 -APRIL 15) STA61L ZE FOUNDATIOIN STONE FILTER A�WASHED INLET ACROSS INLET (ESPECIALLY IMPORTANT WHERE t< SEEDING MIXTURE RATE (LB/ACRE) - --WET AREAS ARE ANTICIPATED) -- --- -- -- - n u - RYE (GRAIN) 120 COA67WXTM E7VIR#AX AOTM O ANNUAL LESPENDEZA (KOBE) 50 Z w L U 1, 2" TO 3" COARSE AGGREGATE STONE SHALL BE USED. PAD TO BE 100'x20'x6" AT A MINIMUM w OMIT ANNUAL LESPENDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND W o BEYOND JUNE. W 2. TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS /S TO BE PROVIDED. U 3. ENTRANCES SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL OzZ SEEDING DATES N CONSTRUCTION VEHICLES. (0 COASTAL PLAIN - DEC. 1 -APRIL 15 4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT p p FLOW OF MUD ONTO STREET. PERIODIC TOP DRESSING WITH STONE WILL BE NECESSARY, n� 06 C7 e KEEP SOME HANDY. BUFQF D. TEMPORARY SEEDING AFTER SEPTEMBER 15 AN BEFORE APRIL 15. = O n� W 5. ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP /MMEO/ATEL Y. SEEDING MIXTURE RATE (LB/ACRE)- IleeeeL 6. APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE /S STABILIZED. GERMAN MILLET 40 FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED. SEEDING DATES N Z PURPOSE + TO PROVIDE A BUFFER AREA WHERE VEHICLES CAN DROP THEIR MUD AND APRIL 15 -AUGUST 15 SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION STEEL F FROM SURFACE RUNOFF, AND HELP CONTROL DUST. B. AVOID CURVES IN PUBLIC ROADS AND STEEP SLOPES. REMOVE ALL VEGETATION AND OTHER OBJECTABLE MATERIAL FROM THE FOUNDATION AREA. GRADE AND CROWN FOUNDATION FOR POSITIVE DRAIANGE. 9. 1F THE SLOPE TOWARD THE ROAD EXCEEDS 21, CONSTRUCT A RIDGE 6" TO 8" HIGH WITH 3:1 SIDE SLOPES, ACCROSS THE FOUNDATION WIDTH APPROXIMATELY 15'-0" FROM THE ENTRANCE TO DIVERT RUNOFF AWAY FROM PUBLIC ROAD 10. PLACE GEOTEXTILE FABRIC ON GRADED FOUNDATION TO IMPROVE STABILITY, ESPECIALLY IN WET CONDITIONS THAT ARE ANTICIPATED. 11. PLACE STONE TO DIMENSIONS AND GRADE AS SHOWN ON PLANS. LEAVE SURFACE SMOOTH AND SLOPED FOR DRAINAGE. WASHED STOP INLET ACRC 12. DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE STONE PAD TO A SEIMENT TRAP OR BASIN 13. INSTALL PIPE UNDER PAD /F NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE. 3023TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SCALE: NONE TRENCH UPSTREAM END OF STORM DRAIN Section A -A DETAIL 2 �1 dCE POST � STEEL FENCE POST OVERFLOW 1/3 PIPE Ae DIAMETER cea STONE FILTER A�WASHED INLET ACROSS INLET FILTER S INLET II 11 I HARDWARE CLOTH t< PLM= NLET MOTECMV MD STOW FLIER MO'XCMV IC 302.2 END -OF -DAY INLET PROTECTION DETAIL SCALE: NONE DESIGN - SETTLED TOP N FILTER FABRIC rl�Icrc rHarcl� CROSS SECTION 4' MIN VARIES (SEE PLAN) . 3'-0" MIN. STONE SECTION VERFILL 6" t. -IA*x_'������s���������c . A�00�`�r;Ge�000a�GCOG`1Z001�p;0 O &-NN!., N ®R � e• 302.8 TEMPORARY SEDIMENT TRAP SCALE: NONE a J a w r0 < FINISH GRADE SEE PLAN C-201 1 FLOW EXCELSIOR MAT SEE PLAN FINISH GRADE 302.7 DITCH/ SWALE CROSS-SECTION SCALE: NONE EROSION CONTROL BLANKETS SHALL BE SINGLE NET STRAW VED IN CHANNELS, ROLL OUT STRIPS OF NETTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH 302.4 TEMPORARY NET LINER DETAIL SCALE: NONE Z z U W z J a N cea Q(I)IV U0O 14D) N mCOM U t< ♦U^ V J N to n u - Lu WuNi N ZZ Ln O W N Z w L U ce w w ' too, W o U W Construction Notes: 1. Uniformly grade a shallow depression approaching the inlet. 2. Drive 5 -foot steel posts 2 feet into the ground surrounding the inlet. Space posts evenly around the perimeter of the inlet, a maximum of 4 feet apart. 3. Surround the posts with wire mesh hardware cloth. Secure the wire mesh to the steel posts at the top middle, and bottom. Placing a 2 -foot flap of the wire mesh under the gravel for anchoring is recommended. 4. Place clean gravel (NC DOT •5 or 057 stone) on a 2:1 slope with a height of 16 Inches around the wire, and smooth to an even grade. 5. Once the contributing drainage area has been stabilized, remove accumulated sediment, and establish final grading elevations. 6. Compact the area properly and stabilized it with groundcover. 7. The wire mesh should be at least a 19 -gauge; hardware cloth with a 57/64 inch .- --- ----.nn 302. 1HARDWARE CLOTH & GRAVE PROTECTION SCALE: NONE L INLET \REA s' Project No. 21613 Date January 2017 Drawing no. C 302 0 t< ♦U^ V J N to N CD O t9 Z L U � EN _v too, W Z W C o U 7 0 OzZ C N > CU (0 C � Z Inc p p n� 06 C7 e MW W W j = O n� W CAM 6W IleeeeL N Project No. 21613 Date January 2017 Drawing no. C 302 0 ♦U^ V J CD N t9 L U _ U EN C W Z W C o U 7 0 C U > CU (0 C � T 2 n� MW W n� W Project No. 21613 Date January 2017 Drawing no. C 302