SITE AREA DESCRIPTION
GENERAL SITE NOTES
SEED BED PREPARATION AND MULCHING SCHEULE
PERIMETER DIKES, SWALES, DITCHES, SLOPES
7 DAYS
COMPLETE GRADING BEFORE PREPARING SEEDBEDS, AND
HIGH -QUALITY WATER (HOW) ZONES -
7 DAYS
INSTALL ALL NECESSARY EROSION CONTROL PRACTICES SUCH AS
Phase 1 Initial
Site Clearing and Grubbing Plan
SWALES AND BASINS. MINIMIZE STEEP SLOPES. IF SOILS HAVE
SLOPES 3:1 OR FLATTER
14 DAYS
BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1
14 DAYS
DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL
1.
OBTAIN PLAN APPROVALS AND ALL APPLICABLE PERMITS.
PLOW. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED
2.
FLAG LIMITS OF ROUGH GRADING FOR BUILDING SITE, PARKING LOTS AND ESTABLISH GRADE
OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING,
250
LIMITS AS NEEDED.
RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE
3.
CONTACT LAND QUALITY SECTION AT 919-791-4200 THEN HOLD PRECONSTRUCTION MEETING WITH
OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR
CHECK
GRADING CONTRACTOR, EROSION CONROL ADMINISTRATOR PROJECT ENGINEER AND OWNER
BEFORE SEEDING.
DAM
BEFORE WORK BEGINS
TIME SITE IS STABILIZED WITH VEGETATIVE COVER OR PARKING AREA SUBGRADE IS
4.
INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE UPON..
THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF
5.
INSTALL THE PERIMETER SEDIMENT FENCES AS THE FIRST CONSTRUCTION ACTIVITY PRIOR TO
APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE AS
(0
SITE. CLEAR ONLY ENOUGH TO INSTALL SILT FENCE, TEMPORARY SKIMMER BASINS AND
STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE
4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT
DIVERSIONS IN THE WOODED AREA.
KIND OF SEED TO BE USED SHALL BE DETERMINED BY THE ENGINEER.
6.
INSTALL TEMPORARY SKIMMER BASINS AND DIVERSIONS AND INSTALL TEMPORARY SEDIMENT
TEMPORARY SEDIMENT FENCE
°
BASIN WITH RISER AND BARRELL. DISPOSE OF SOIL IN THE TEMPORARY STOCK PILE. CLEAR ONLY
LIME -.. TONS/AC
-- ---
BUFQF
ENOUGH TO INSTALL MEASURES AND STABILIZE IMMEDIATELY.
10-10-20..__-....-------....--.....--.----..-_....100 00 LBS/AC
Phase 2 Site
Clearing Grubbing Plan
--.-------------------------.500 LBS/AC
0-20-0---------------------- -
and
__(
STRAW MULCH-- ---.._ .............2 TON/AC AFTER SEEDING
1.
CLEAR REMAINING WOODS AND GRUB THE REMAINING STUMPS.
ASPHALT TACK -------- ....... ---._---_400 GALLTON OF MULCH
2.
STRIP SITE OF TOPSOIL AND STOCKPILE IN THE DESIGNATED AREA
3.
INSTALL PERIMEER SILT FENCE AROUND THE STOCKPILE AREAS AND SEED IN ACCORCANCE WITH
GERMAN MILLET
40
THE SEEDING TIME REQUIREMENTSAND SCHEDULE.
Grubbing
Phase 2 Site
1.
Clearing and Plan
BEGIN THE GRADING OPERATION FOR ENTRY ROAD, PARKING LOTS AND BUILDINGSTS
2'-0"
2.
BEGINGRADINGAND FILLING THE SOCCER, BASEBALL AND SOFTBALL FIELDS. INSTALL ROLLED
"
SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION
EROSION CONTROL PRODUCT (RECP) MATTING UPON THE COMPLETION OF 6 FOOT INCREMENTS OF
COMPACTED SOIL
EXPOSED SLOPE.
3.
ATTOPOF FILL SLOPES INSTALL TEMPORARY BERMS AND SLOPE DRAINS WITH OUTLET
X,
PROTECTION.
PROTECTION.
4.
Install stone drainage piping and end of day measures./
\
5.
INSTALL CONCRETE WASHOUT AREA PRIOR TO CONSTRUCTION OF STORM DRAINAGE>ri\~'i
�y
STRUCTURES.
9. 1F THE SLOPE TOWARD THE ROAD EXCEEDS 21, CONSTRUCT A RIDGE 6" TO 8" HIGH
6.
Install inlet protection around catch basins and drop inlets and install rip rap protection and energy disipators.
/�/� NN i' //�/��%\/j\ij��j /� \/f,(✓/\//\i�\ /\%\i'/\ �i� /%�%�\/j�,
/\\/�\
7.
FINAL GRADE THE BUILDING PADs and athletic fields install gravel and curb and GUTTER IN
\
✓i//i�.'\/,� \/�/� i////��;.:11 i�. // //�/
PREPARATION FOR LAYDOWN AREA.
/
6 0
8.
FINE GRADE AND PAVE SIDEWALK, driveway and parking lots AND LAY DOWN GRAVEL FOR GRAVEL
10. PLACE GEOTEXTILE FABRIC ON GRADED FOUNDATION TO IMPROVE STABILITY, ESPECIALLY
FIRE LANE.
9.
PROVIDE A GROUND COVER (TEMPORARY OR PERMANENT) ON EXPOSED SLOPES 14 CALENDAR
DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING FOR SLOPES 3:1 OR FLATTER
INCLUDING ALL OTHER SLOPES 4:1 ORFLATTER. PROVIDE A GROUND COVER (TEMPORARY OR
TEMPORARY EARTH E
WASHED STOP
PERMANENT) ON EXPOSED SLOPES WITHIN 7 CALENDAR DAYS FOLLOWING COMPLETION OF ANY
302,1
PHASE OF GRADING FOR SLOPES 3:1 OR STEEPER INCLUDING ALL PERMANENT DIKES, SWALES,
DITCHES AND SLOPES AND DISTRUBANCES WITHIN HIGH QUALITY WATER (HQWQ) ZONES.
SCALE: NONE
10.
ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED BY THE
TRAP OR BASIN
STATE OR OWNER IF DEEMED NECESSARY.
11.
MAINTAIN PERMANENT VEGETATION BY TOP DRESSING WITH 700 LBS PER ACRE OF FERTILIZER
EVERY 6 MONTHS UNTIL THE COMPLETION OF THE PROJECT.
12.
WITHIN 6" OF FINAL GRADE, RE -DISTRIBUTE 6" OF TOP SOIL
13.
FINE GRADE, PERMANENTLY SEED AND MULCH ALL LANDSCAPED AREAS
14.
REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES UPON
COMPLETION AND STABILIZATION OF PROJECT.
MAINTENANCE PLAN
1. All erosion and sediment control practices will be checked for stability and operation
run-off in rainfall b in no case less than once eve week. An
following every n-0iFprodua g ra but every Y
needed repairs willbe made immediately to maintain allpractices as designed.
2. Sed'rnentwillbe removed from behind the siltfence when itbecomes 0.5 feet deep.
3. Sedimentwillbe removed from the sedknenthap and storm inlet sediment trap when the storage has been
approximately 50°% filled. Gravel will be cleaned and replaced when the sediment pool
no longerdrains properly.
4. All seeded areas will be fertilized, reseeded a necessary, and mulched according to
specifications in the vegetative plan to maintain a vigorous, dense vegetative cover.
)W
DIVERSI
NEW STABILIZATION TIMEFRAMES
SITE AREA DESCRIPTION
STABILIZE
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES, SLOPES
7 DAYS
NONE
HIGH -QUALITY WATER (HOW) ZONES -
7 DAYS
- NONE
SLOPES STEEPER THAN 3:1
7 DAYS
IF SLOPES ARE 10'OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1,14 DYAS ARE ALLOWED
SLOPES 3:1 OR FLATTER
14 DAYS
7 DAYS FOR SLOPES GREATER THAN WIN LENGTH
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1
14 DAYS
NONE, EXCEPT FOR PERIMTERS AND HQW ZONES
PLANNED EROSION AND SEDIMENT CONTROL DEVICES
STEEL FENCE POST
DE GEOTEXTIL FAR
PRTOI
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
A. PERMANENT SEEDING
AFTER APRIL 15 AND BEFORE SEPTEMBER 15.
PRACTICE 6.06
STONE FILTER
SEEDING MIXTURE
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE IS TO BE USED AT STREET CONNECTION.
(ESPECIALLY IMPORTANT WHERE
t<
DIMENSIONS ARE TO BE AS INDICATED ON PLANS. THE CONTRACTOR HAS THE PREROGATIVE
250
- --WET AREAS ARE ANTICIPATED) -- --- -- -- -
TO IDENTIFY A SINGLE ENTRANCE AND TREAT SAID ENTRANCE WITH THIS PROTECTIVE
B. PERMANENT SEEDING
AFTER SEPTEMBER 15 AN BEFORE APRIL 15.
MEASURE. IF, HOWEVER BOTH ENTRANCES ARE USED DURING CONSTRUCTION, CONTRACTOR
O
SEEDING MIXTURE
SHALL PROTECT BOTH WITH TEMPORARY GRAVEL.
dr P�
TEMPORARY STONE DROP INLET PROTECTION
250
\�G ROPO
PRACTICE 6.51
ANNUAL RYE (SEPTEMBER 15 THRU APRIL 15) 50
O tt1
8" HIGH
CHECK
BEYOND JUNE.
SEDIMENT FENCE IS TO BE USED AROUND ALL YARD INLETS AND CATCH BASINS UNTIL SUCH
DAM
TIME SITE IS STABILIZED WITH VEGETATIVE COVER OR PARKING AREA SUBGRADE IS
s,
3. ENTRANCES SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL
COVERED WITH CABC.
POSSIBLE
N
CONSTRUCTION VEHICLES.
(0
COASTAL PLAIN - DEC. 1 -APRIL 15
4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT
EARLY SPRING: FEB. 15 - MAR. 20
FEB. 15 - APRIL 30
v�
6" THICK
TEMPORARY SEDIMENT FENCE
°
C7
e
PRACTICE 6.62
BUFQF
FALL: SEPT. 1 - SEPT. 30
SEPT. 1 - OCT. 31
=
STONE INLET PROTECTION IS TO BE USED AS NEEDED TO PROTECT AREAS AS SHOWN. SILT
n�
W
FENCE IS TO BE PLACED AS SHOWN ON PLANS AND ANY OTHER AREAS SUBJECT
SEEDING MIXTURE
TO DISCHARGING SEDIMENT DIRECTLY INTO CANALS AND DITCHES.
(CONT'D)
IleeeeL
6. APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE /S STABILIZED.
CITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL EROSION CONTROL
GERMAN MILLET
40
MEASURES SHOULD THE PLAN OR ITS IMPLEMENTATION PROVE TO BE INADEQUATE.
SEEDING DATES
SEED OR OTHERWISE PROVIDE GROUND COVER DEVICES.
Z PURPOSE + TO PROVIDE A BUFFER AREA WHERE VEHICLES CAN DROP THEIR MUD AND
VEGETATION PLAN
SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION
MIN.
LI
FES PIPE AS INDICA TED
ON GRADING & EROSION CONTROL PLAN
STONE
(ROUND FES PIPE AS. NOTED
4 EROSION CONTROL PLAN
BRIC UNDERLINER
302.9 TYPICAL RIP RAP DETAIL
SCALE: NONE
LENGTH = THE DISTANCE SUCH THAT POINTS
A & B ARE EQUAL IN ELEVATION
21/z GAUGE
MEDIATE WIRES
FILTER FABRIC SHALL HAVE MIN.
857 FILTERING EFFICIENCY. A MIN. TENSILE
STRENGTH OF 30LB PER LINEAR INCH, AND
A MIN. SLURRY FLOW RAE OF 0.3 GAL PER
SQ FT. MIN. -
NOTE:
WIRE SHALL BE A MINIMUM OF 32" WIDTH AND SHALL HAVE
A MINIMUM OF 6 LINE WIRES WITH 12 STAY SPACING.
ULTRAVIOLET RESISTANT (BLACK) FABRIC SHALL BE A MIN.
OF 36" IN WIDTH AND SECURED TO WIRE WITH METAL. CLIPS.
OR WIRE AT B'` OFF CENTER. CARRY 12 FABRIC AND WIRE
6" INTO TRENCH. BACKFILL AND COMPACT. STEEL POST
SHALL BE SELF -FASTENER ANGLE STEEL TYPE - 5'-0" IN LENGTH.
302,6 TEMPORARY SILT FENCE
SCALE: NONE
?B
CHECK
�-�}tvr'o
I,-��c,_ DAM
A
CLASS "B" STONE
12" of NCDOT "5
w OR •57 STONE 2
rv. .
w z FILTER FABRIC 1I -
a
N
,nx
CENTER LINE SWALE 4'to 6'
30265 ROCK CHECK DAM
SCALE: NONE
STEEL FENCE POST
DE GEOTEXTIL FAR
PRTOI
ROCK CHECK DAM SPACING
A. PERMANENT SEEDING
AFTER APRIL 15 AND BEFORE SEPTEMBER 15.
STA61L ZE FOUNDATIOIN
STONE FILTER
SEEDING MIXTURE
RATE (LB/ACRE)
(ESPECIALLY IMPORTANT WHERE
t<
FALCON FESCUE
250
- --WET AREAS ARE ANTICIPATED) -- --- -- -- -
n u -
B. PERMANENT SEEDING
AFTER SEPTEMBER 15 AN BEFORE APRIL 15.
COA67WXTM E7VIR#AX AOTM
O
SEEDING MIXTURE
RATE (LB/ACRE)
dr P�
FLACON FESCUE GRAIN
250
\�G ROPO
DIVERSION RIDGE
ANNUAL RYE (SEPTEMBER 15 THRU APRIL 15) 50
O tt1
8" HIGH
SEEDING DATES
BEYOND JUNE.
d
2" TO 3" COARSE
AGRREGATE
s,
3. ENTRANCES SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL
BEST
POSSIBLE
N
CONSTRUCTION VEHICLES.
(0
COASTAL PLAIN - DEC. 1 -APRIL 15
4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT
EARLY SPRING: FEB. 15 - MAR. 20
FEB. 15 - APRIL 30
0-
6" THICK
n�
06
C7
e
T..
BUFQF
FALL: SEPT. 1 - SEPT. 30
SEPT. 1 - OCT. 31
=
'>
n�
W
5. ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP /MMEO/ATEL Y.
SEEDING MIXTURE
VEGETATION PLAN
(CONT'D)
IleeeeL
21/z GAUGE
MEDIATE WIRES
FILTER FABRIC SHALL HAVE MIN.
857 FILTERING EFFICIENCY. A MIN. TENSILE
STRENGTH OF 30LB PER LINEAR INCH, AND
A MIN. SLURRY FLOW RAE OF 0.3 GAL PER
SQ FT. MIN. -
NOTE:
WIRE SHALL BE A MINIMUM OF 32" WIDTH AND SHALL HAVE
A MINIMUM OF 6 LINE WIRES WITH 12 STAY SPACING.
ULTRAVIOLET RESISTANT (BLACK) FABRIC SHALL BE A MIN.
OF 36" IN WIDTH AND SECURED TO WIRE WITH METAL. CLIPS.
OR WIRE AT B'` OFF CENTER. CARRY 12 FABRIC AND WIRE
6" INTO TRENCH. BACKFILL AND COMPACT. STEEL POST
SHALL BE SELF -FASTENER ANGLE STEEL TYPE - 5'-0" IN LENGTH.
302,6 TEMPORARY SILT FENCE
SCALE: NONE
?B
CHECK
�-�}tvr'o
I,-��c,_ DAM
A
CLASS "B" STONE
12" of NCDOT "5
w OR •57 STONE 2
rv. .
w z FILTER FABRIC 1I -
a
N
,nx
CENTER LINE SWALE 4'to 6'
30265 ROCK CHECK DAM
SCALE: NONE
3023TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE
SCALE: NONE
TRENCH
UPSTREAM END
OF STORM DRAIN
Section A -A
DETAIL
2
�1
dCE POST �
STEEL FENCE POST
DE GEOTEXTIL FAR
PRTOI
1/3 PIPE
C. TEMPORARY SEEDING
DURING WINTER MONTHS (SEPT. 15 -APRIL 15)
STA61L ZE FOUNDATIOIN
STONE FILTER
A�WASHED
INLET ACROSS INLET
(ESPECIALLY IMPORTANT WHERE
t<
SEEDING MIXTURE
RATE (LB/ACRE)
- --WET AREAS ARE ANTICIPATED) -- --- -- -- -
n u -
RYE (GRAIN)
120
COA67WXTM E7VIR#AX AOTM
O
ANNUAL LESPENDEZA (KOBE)
50
Z
w
L
U
1, 2" TO 3" COARSE AGGREGATE STONE SHALL BE USED. PAD TO BE 100'x20'x6" AT A MINIMUM
w
OMIT ANNUAL LESPENDEZA WHEN
DURATION OF TEMPORARY COVER IS NOT EXTEND
W
o
BEYOND JUNE.
W
2. TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS /S TO BE PROVIDED.
U
3. ENTRANCES SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL
OzZ
SEEDING DATES
N
CONSTRUCTION VEHICLES.
(0
COASTAL PLAIN - DEC. 1 -APRIL 15
4. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT
p
p
FLOW OF MUD ONTO STREET. PERIODIC TOP DRESSING WITH STONE WILL BE NECESSARY,
n�
06
C7
e
KEEP SOME HANDY.
BUFQF
D. TEMPORARY SEEDING
AFTER SEPTEMBER 15 AN BEFORE APRIL 15.
=
O
n�
W
5. ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP /MMEO/ATEL Y.
SEEDING MIXTURE
RATE (LB/ACRE)-
IleeeeL
6. APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE /S STABILIZED.
GERMAN MILLET
40
FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED.
SEEDING DATES
N
Z PURPOSE + TO PROVIDE A BUFFER AREA WHERE VEHICLES CAN DROP THEIR MUD AND
APRIL 15 -AUGUST 15
SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION
STEEL F
FROM SURFACE RUNOFF, AND HELP CONTROL DUST.
B. AVOID CURVES IN PUBLIC ROADS AND STEEP SLOPES. REMOVE ALL VEGETATION AND
OTHER OBJECTABLE MATERIAL FROM THE FOUNDATION AREA. GRADE AND CROWN
FOUNDATION FOR POSITIVE DRAIANGE.
9. 1F THE SLOPE TOWARD THE ROAD EXCEEDS 21, CONSTRUCT A RIDGE 6" TO 8" HIGH
WITH 3:1 SIDE SLOPES, ACCROSS THE FOUNDATION WIDTH APPROXIMATELY 15'-0" FROM
THE ENTRANCE TO DIVERT RUNOFF AWAY FROM PUBLIC ROAD
10. PLACE GEOTEXTILE FABRIC ON GRADED FOUNDATION TO IMPROVE STABILITY, ESPECIALLY
IN WET CONDITIONS THAT ARE ANTICIPATED.
11. PLACE STONE TO DIMENSIONS AND GRADE AS SHOWN ON PLANS. LEAVE SURFACE
SMOOTH AND SLOPED FOR DRAINAGE.
WASHED STOP
INLET ACRC
12. DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE STONE PAD TO A SEIMENT
TRAP OR BASIN
13. INSTALL PIPE UNDER PAD /F NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE.
3023TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE
SCALE: NONE
TRENCH
UPSTREAM END
OF STORM DRAIN
Section A -A
DETAIL
2
�1
dCE POST �
STEEL FENCE POST
OVERFLOW
1/3 PIPE
Ae
DIAMETER
cea
STONE FILTER
A�WASHED
INLET ACROSS INLET
FILTER
S INLET II 11 I
HARDWARE CLOTH
t<
PLM= NLET MOTECMV MD STOW FLIER MO'XCMV
IC
302.2 END -OF -DAY INLET PROTECTION DETAIL
SCALE: NONE
DESIGN -
SETTLED
TOP
N
FILTER
FABRIC
rl�Icrc rHarcl�
CROSS SECTION
4' MIN
VARIES (SEE PLAN) .
3'-0" MIN.
STONE SECTION
VERFILL 6"
t.
-IA*x_'������s���������c .
A�00�`�r;Ge�000a�GCOG`1Z001�p;0
O &-NN!., N ®R
� e•
302.8 TEMPORARY SEDIMENT TRAP
SCALE: NONE
a
J
a
w
r0
<
FINISH GRADE
SEE PLAN C-201
1
FLOW
EXCELSIOR MAT
SEE PLAN
FINISH GRADE
302.7 DITCH/ SWALE CROSS-SECTION
SCALE: NONE
EROSION CONTROL BLANKETS
SHALL BE SINGLE NET STRAW
VED
IN CHANNELS, ROLL OUT STRIPS OF NETTING PARALLEL TO THE
DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH
302.4 TEMPORARY NET LINER DETAIL
SCALE: NONE
Z
z
U
W
z
J a
N
cea
Q(I)IV
U0O
14D) N
mCOM
U
t<
♦U^
V J
N
to
n u -
Lu WuNi
N
ZZ Ln
O
W
N
Z
w
L
U
ce
w
w '
too,
W
o
U
W
Construction Notes:
1. Uniformly grade a shallow depression approaching the inlet.
2. Drive 5 -foot steel posts 2 feet into the ground surrounding the inlet.
Space posts evenly around the perimeter of the inlet, a maximum of 4 feet apart.
3. Surround the posts with wire mesh hardware cloth. Secure the wire mesh
to the steel posts at the top middle, and bottom. Placing a 2 -foot flap of the
wire mesh under the gravel for anchoring is recommended.
4. Place clean gravel (NC DOT •5 or 057 stone) on a 2:1 slope with a
height of 16 Inches around the wire, and smooth to an even grade.
5. Once the contributing drainage area has been stabilized, remove
accumulated sediment, and establish final grading elevations.
6. Compact the area properly and stabilized it with groundcover.
7. The wire mesh should be at least a 19 -gauge; hardware cloth with a 57/64 inch
.- --- ----.nn
302. 1HARDWARE CLOTH & GRAVE
PROTECTION
SCALE: NONE
L INLET
\REA
s'
Project No.
21613
Date
January 2017
Drawing no.
C
302
0
t<
♦U^
V J
N
to
N
CD
O
t9
Z
L
U
�
EN
_v
too,
W
Z
W
C
o
U
7
0
OzZ
C
N
>
CU
(0
C
�
Z
Inc
p
p
n�
06
C7
e
MW
W
W
j
=
O
n�
W
CAM
6W
IleeeeL
N
Project No.
21613
Date
January 2017
Drawing no.
C
302
0
♦U^
V J
CD
N
t9
L
U
_
U
EN
C
W
Z
W
C
o
U
7
0
C
U
>
CU
(0
C
�
T
2
n�
MW
W
n�
W
Project No.
21613
Date
January 2017
Drawing no.
C
302