HomeMy WebLinkAboutACC pg4WIRE FENCING AND
WOVEN GEOSYNTHETiC
FILTER FABRIC
EXTEND FABRIC AND
WIRE INTO TRENCH
COMPACTED
BACKFILL —
NOTE:
REMOVE SEDIMENT DEEPER THAN
12". REPAIR ANY UNDERMINE
IMMEDIATELY.
MAINTENANCE
STEEL POSTS
8' O.C. W/WIRE
z
0
I
INSPECT SLDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL.
MAKE ANY REQUIRED REPAIRS IMMEDIATELY.
SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR
BECOME INEFFECTIVE, REPLACE IT PROMPTLY.
REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE
VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE 0 THE FENCE. TAKE
CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING
THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE
AREA HAS BEEN PROPERLY STABILIZED.
SILT FENCE
INSTALL FILTER FABRIC
UNDER RIP RAP AND GRAVEL
SYM.
STEEL POST
CONSTRUCTION SPECIFICATIONS:
CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA
STRENGTH SYNTHETIC FILTER FABRICS.
ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED
24" ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND
VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.)
CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE
LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY,
SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4'
MINIMUM OVERLAP TO THE NEXT POST.
SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED
SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE
MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE
REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE
POST. WIRE OR PLASTIC ZIP TIED SHOULD HAVE MINIMUM 50 POUND
TENSILE STRENGTH.
WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM
OF 8' APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE
GROUND A MINIMUM OF 24".
EXTRA STRENGTH FILTER FABRIC WITH 6' POST SPACING DOES NOT REQUIRE
WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC
DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM
50 POUND TENSILE STRENGTH.
EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8" DEEP ALONG THE
PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER.
PLACE 12" OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH.
BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND
COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT
FENCE PERFORMANCE.
DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.
TEMPORARY SILT FENCE DETAIL
NOT TO SCALE
19 GUAGE HARDWARE
CLOTH — 1/4" OPENINGS
4' MAX.
FILTERED
WATER
ELEVATION
STEEL POST
• . � -yam-
18" OF CLASS "B" RIPRAP WITH
12" OF NCDOT #5 OR #57
WASHED STONE (GRAVEL CHECK DAM)
(UPSTREAM SIDE OF OUTLET)
CONSTRUCTION SPECIFICATIONS:
24"
SECTION
STEEL POST
19 GUAGE HARDWARE
CLOTH — 1/4" OPENINGS
HORIZONTAL POST
SILT FENCE FABRIC
11 CLASS 'B' RIP
CRAP (TYP)
1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A FILTER FABRIC
FOUNDATION.
2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL
WHERE THE DAM ABUTS THE CHANNEL BANKS.
3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM
CUTTING AROUND THE ENDS OF THE CHECK DAM.
4. PROTECT THE CHANNEL AFTER THE DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION.
6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE.
7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE
DAM, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES.
8. SEE SILT FENCE DETAIL FOR CONSTRUCTION SPECIFICATIONS.
INSPECT DAM AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR
GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER
DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED.
ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE DAM AND EROSION FROM HIGH FLOWS AROUND
THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS
AROUND DAM, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP
LINER IN THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP—LINE AND PAVED CHANNELS).
REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL
VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE DAM, AND PREVENT LARGE FLOWS FROM
CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT
AND CROSS SECTION.
VEL CHECK
NOT TO SCALE
REINFORCED SILT FENCE OUTLET DETAIL
DATE OUble
Engineering., PLLC
110 Commerce Ave. • Southern Pines, NC 28387 -(910) 684-8126 •Cert. No- P-1275
LAND GRADING: PERIODICALLY CHECK AIL GRADED AREAS AND THE SUPPORTING EROSION AND
SEDIMENTATION CONTROL PRACTICES, ESPECIALLY AFTER HEAVY RAINFALLS. PROMPTLY REMOVE
ALL SEDIMENT FROM DIVERSIONS AND OTHER WATER—DISPOSAL PRACTICES. IF WASHOUT OR
BREAKS OCCUR, REPAIR THEM IMMEDIATELY. PROMPT MAINTENANCE OF SMALL ERODED AREAS
BEFORE THEY BECOME SIGNIFICANT GULLIES IS AN ESSENTIAL PART OF AN EFFECTIVE EROSION
AND SEDIMENTATION CONTROL PLAN.
TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE
PERIODIC TOP DRESSING WITH 2—INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE
USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS.
SEDIMENT FENCE (SILT FENCE)
AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS
AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE
PRESSURE ON THE FENCE. TAKE CARE 10 AVOID UNDERMINING THE FENCE DURING CLEANOUT.
REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO
GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY
STABILIZED.
SURFACE ROUGHENING: PERIODICALLY CHECK THE SEEDED SLOPES FOR RILLS AND WASHES.
FILL THESE AREAS SLIGHTLY ABOVE THE ORIGINAL GRADE, THEN RESEED AND MULCH AS SOON
AS POSSIBLE.
ROLLED EROSION CONTROL PRODUCTS:
SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY. GOOD CONTACT
WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP
ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND
SHALL BE REPARIED AND STAPLED. IF EROSION OCCURS DUE TO POORLY CONTROLLED
DRAINAGE, THE PROBLEM SHALL BE FIXED AND ERODED AREA PROTECTED. MONITOR AND
REPAIR THE RECP AS NECESSARY UNTIL GROOUND COVER IS ESTABLISHED.
1. RIP THE ENTIRE AREA TO 6" DEPTH.
2. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE
REASONABLY SMOOTH AND UNIFORM.
3. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE IN ACCORDANCE
WITH "SEEDING SCHEDULE" AND MIX WITH SOIL.
4. CONTINUE TILLAGE UNTIL A WELL—PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED
IS PREPARED 4 TO 6 INCHES DEEP.
5, SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING
EQUIPMENT OR CULTIPACK AFTER SEEDING. SEED ACCORDING TO "SEEDING SCHEDULE."
6. MULCH IN ACCORDANCE WITH "SEEDING SCHEDULE" IMMEDIATELY AFTER SEEDING.
7. INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE "SEEDING
SCHEDULE". MAKE NECESSARY REPAIRS AND RESEED WITHIN THE PLANTING SEASON,
IF POSSIBLE, OR THE DAMAGED AREA SHALL BE REESTABLISHED FOLLOWING THE ORIGINAL
LIME, FERTILIZER, AND SEEDING REQUIREMENTS.
SEEDING SCHEDULE
NOTE
ANDERSON CREEK CLUB
EROSION CONTROL DETAILS
TEMPORARY
SEED MIX SHALL BE
USED FOR ALL AREAS EXPOSED GREATER THAN ONE
WEEK AND
SUBJECT TO FURTHER
DISTURBANCE. PERMANENT SEED MIX SHALL BE
CHECKED FOR ADEQUACY ON JULY
15. AN ADEQUATE COVER SHALL HAVE 50 SPRIGS
OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT.
TEMPORARY
SUMMER SEED MIX
(TO BE FOLLOWED BY PERMANENT FALL SEED MIX)
PRELIMIARY - FOR REVIEW ONLY
EC -1
SPECIES
MARCH 1 —
SEPT. 1
GERMAN MILLET
TEMPORARY
WINTER SEED MIX
(TO BE FOLLOWED BY PERMANENT SPRING SEED MIX)
SPECIES
SEPT. 1 —
MARCH 1
WINTER RYE (GRAIN)
KOBE LESPEDEZA
PERMANENT
SPRING SEED MIX
SPECIES
MARCH 1 —
JULY 1
PENSICOLA BAHIAGRASS
COMMON BERMUDA
SERICEA LESPEDEZA
PERMANENT
FALL SEED MIX
SPECIES
SEPT. 1 —
NOV. 1
COMMON BERMUDA
SERICEA LESPEDEZA (UNSCARIFIED)
KOBE LESPEDEZA
SOIL AMENDMENTS
TO BE INCORPORATED INTO THE TOP 3 INCHES OF SOIL IN AREAS WITH SLOPES 2:1 OR FLATTER
APPLY FERTILIZER (10-10-10) AT A RATE OF 1000 LB/ACRE
APPLY LIME (GROUND AGRICULTURAL LIMESTONE) AT A RATE OF 4000 LB/ACRE
APPLY SUPERPHOSPHATE (0-49-0) AT A RATE OF 200 LB/ACRE
* REQUIRED FOR PERMANENT SEED MIX ONLY
MULCH
APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER.
ANCHOR MULCH WITH ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE
OF 400 GAL./ACRE
WATER
MINIMUM OF 1" OF RAINFALL A WEEK (IF NOT SUPPLIED NATURALLY, CONTRACTOR
SHALL SUPPLY THE REMAINING AMOUNT UNTIL GROUND COVER HAS BEEN ESTABLISHED).
MAINTENANCE
REFERTILIZE IN THE SECOND YEAR UNLESS THE GROWTH IS FULLY ADEQUATE.
MOW WHEN THE AVERAGE PLANT HEIGHT EXCEEDS 6 INCHES.
RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY.
TEMPORARY SEEDING: RESEED AND MUI CH WHERE SEEDLING EMERGENCE IS POOR, OR WHERE
EROSION OCCURS,
ASPOSSIBLE.REFER 0 PAGES 61 0.4,L6. 0.5 AND 6.M10 6 FOR CORRECT SEEDING N
SEEDING MIXTURTRAFFIC AS �NOTE.
PER CURRENT SEASONAL CONDITIONS.
PERMANENT SEEDING: INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS
AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. VEGETATAION MUST BE FULLY
ESTABLISHED UNTIL SOIL COVER HAS BI EN MAINTAINED FOR ONE FULL YEAR FROM PLANTING.
DUST CONTROL: MAINTAIN DUST CONTROL MEASURES THROUGH DRY WEATHER PERIODS UNTIL
ALL DISTURBED AREAS HAVE BEEN STABILIZED.
TREE PRESERVATION AND PROTECTION: REPAIR ANY DAMAGE TO PROTECTED TREE AS FOLLOW
SHOULD DAMAGE TO CROWN, TRUNK, OR ROOT SYSTEM OCCUR.
(REFERENCE NCDENR MANUAL, PAGE 6.05.3 AND 6.05.4)
REPAIR ROOTS BY CUTTING OFF THE DAMAGED AREAS AND PAINTING THEM WITH TREE
PAINT. SPREAD PEAT MOSS OR MOIST TOPSOIL OVER EXPOSED ROOTS.
REPAIR DAMAGE TO BARK BY TRIMMING AROUND THE DAMAGED AREAS AS SHOWN IN
FIGURE 6.05b, TAPER THE CUT TO PROVIDE DRAINAGE, AND PAINT WITH TREE PAINT.
CUT OFF ALL DAMAGED TREE LIMBS ABOVE THE TREE COLLAR AT THE TRUNK OR
MAIN BRANCH. USE THREE SEPARATED CUTS AS SHOWN IN FIGURE 6.05c TO AVOID PEELING
BARK FROM HEALTHY AREAS OF THE TREE.
PURSUANT TO G.S. 133—A57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER
THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE
EROSION—CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14
CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED
WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION.
PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO
RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 CALENDAR DAYS
OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR
DEVELOPMENT.
.®•��°''4.,,
•'FESS�,9 -:
ANDERSON CREEK CLUB
EROSION CONTROL DETAILS
June/2015
DATE
S -
CARRIAGE GLEN AMENITIES CENTER
`•�
IN �0 r�=�
HARNETT COUNTY, NORTH CAROLINA
PRELIMIARY - FOR REVIEW ONLY
EC -1
T UPS°•
MMMl� �- {Z-
SHEET tiQ.