Loading...
HomeMy WebLinkAboutFinal Tingen Pointe Phase 6 Decision Packet FINAL DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: TINGEN POINTE Development Type: MAJOR SUBDIVISION PLAN REVIEW Date: JUNE 4, 2014 The above referenced application  SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. : :   : :   : : Add a setback table Show any additional drainage easements if applicable Note that there shall be no disturbance within the wetlands Drop the “5.” From the thoroughfare note Show access easement to open space & note accordingly by name and acreage. Also state who will maintain this area Add “R/W” to street callout Pave and stabilize street cross section The remainder of Juno Dr. needs to be taken over by NCDOT Note diameter of turnaround Rec. Fees $12,000 Final Review Fee $100 Re-inspection Fee $50  : : HCDPU must receive final asbuilts for utility improvements in the form of AutoCAD, Mylar and Bond. Final inspection must be completed with the HCDPU and all items addressed. Engineers Certification must be received. NCDENR final approval must be received for utility improvements. Engineering Cost summary for sewer improvements must be forwarded to HCDPU. The Developer and Contractor must submit a 1year warranty for the utility improvements installed prior to HCDPU accepting the system and activating services. The Capacity fees must be paid prior to services being activated.  : :    Engineering (910)893-7555 : Ditches were still being graded on June 3, 2014. Please confirm that ditches are graded according to NCDOT details. Site has not been stabilized. As-builts will be needed for drainage easement.   LONG RANGE CONDITIONS The following conditions must be satisfied Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.  : Please visit www.harnett.org/utilities for more information on the approval process.  :   :   :   :     Development Review Board Chairman   A FINAL copy, consisting of any corrections, etc., will be sent after the meeting. Upon resubmittal, additional comments/ corrections may be required. **Please remember all applicable fee’s** If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2) business days. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan for compliance. If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options.