HomeMy WebLinkAboutFinal Pace & McCune Media Blasting Decison PacketFINAL DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name:
PACE & MCCUNE MEDIA BLASTING
Development Type: COMMERCIAL SITE PLAN REVIEW
Date: APRIL 23, 2014
The above referenced application
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The
following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting.
::
Needs to have a 20' wide all weather proof
emergency vehicle access road.
::
NC 87 SHOULD BE NC 87 N
WHERE WILL DRIVE ACCESS BE? NC 87 N AT 50 EASEMENT? OR OTHER?
SANDSTONE LN SHOULD BE SHOWN (PVT RD)
::
The
proposed days & hrs of operation will require the parking area to be paved, or of a solid surface.
An improved drive aisle will need to be built.
Trash dumpster will need to be screened
from neighboring properties.
Show location of nearest fire hydrant.
Is “Mobile Media Blasting Technology” the official business name?
Label stop blocks on parking typical.
Show 10’ buffer
along front of property.
Label front buffer with the same plantings as the perimeter buffer is described.
Note if any hazardous materials will be stored on site. If so, note how they
will be stored, handled, disposed of, etc.
Note who will be responsible for maintenance of the parking areas, drive aisles, and all landscape buffering.
Add note for BOA approval date
& CUP # “Conditional Use Permit # BA-CU-10-14 approved April 14, 2014”
If applicable, provide a copy of the approved NCDOT driveway permit.
Add owner certification. Example…
As the
owner of record, I hereby formally consent to the proposed development shown on
this site plan and all regulations and requirements of the Harnett County ordinances.
_______________________________
_______
Date Owner Signature
::
The proposed days & hrs of operation will require the parking area to be paved, or of a solid surface.
An improved drive aisle will need to be built.
Trash dumpster will need
to be screened from neighboring properties.
Show location of nearest fire hydrant.
Is “Mobile Media Blasting Technology” the official business name?
Label stop blocks on parking typical.
Show
10’ buffer along front of property.
Label front buffer with the same plantings as the perimeter buffer is described.
Note if any hazardous materials will be stored on site. If so, note
how they will be stored, handled, disposed of, etc.
Note who will be responsible for maintenance of the parking areas, drive aisles, and all landscape buffering.
Add note for BOA approval
date & CUP # “Conditional Use Permit # BA-CU-10-14 approved April 14, 2014”
If applicable, provide a copy of the approved NCDOT driveway permit.
Add owner certification. Example…
As
the owner of record, I hereby formally consent to the proposed development shown on
this site plan and all regulations and requirements of the Harnett County ordinances.
___________________________
___________
Date Owner Signature
::
-Show distances to nearest water utilities.
-Show existing water/sewer mains and associated easements.
-Show proposed water
service location and sizes.
-Show proposed backflow prevention device.
-Add note for HCDPU to install water service.
-Add estimated daily water usage on the site plan.
::
Engineering
(910)893-7555
:
Provide a statement that less than one acre is being disturbed or provide erosion control plan approval from the state.
LONG RANGE CONDITIONS
The following conditions
must be satisfied
Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.
:
Please visit www.harnett.org/utilities for more information on the approval process.
The
developer and the utility contractor must jointly provide HCDPU a one (1) year warranty on all water and sewer improvements installed to serve these lots.
:
:
:
:
Development Review Board
Chairman
A FINAL copy, consisting of any corrections, etc., will be sent after the meeting.
Upon resubmittal, additional comments/ corrections
may be required.
**Please remember all applicable fee’s**
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2) business days.
If APPROVED WITH CONDITIONS, you must submit
5 copies of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while
you wait, as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions
have been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold.
If DENIED, you may
appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options.