Development Name:
BLACKBERRY MANOR PHASE I
Development Type:
Date: AUGUST 28, 2013
The above referenced application
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are
to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting.
::
Will project be bonded?
Finish Streets/water lines and have all infrastructure
inspected.
::
Street names should be shown in street area, not lot area (Nectar Ln/Boysenberry Ln)
Rd Sign Fees Due Ph 1 $525.00 /have already been paid
::
Add “Utility”
to all ROW’s
Streets need to be built or bonded
Fire hydrants, street lights, & streetscape buffer need to be installed or bonded
Add stormwater statement if applicable
Add 20’ corner
setback
Add zoning RA-30
Public Plat Declaration
All roads in this subdivision are hereby declared public. The maintenance of all streets and roads in this subdivision shall be the
responsibility of ___________________________________ and it shall be their responsibility to bring such streets up to the standards of the North Carolina Department of Transportation
before any streets on this plat are added into the North Carolina State Highway System. If the District Engineer has not recommended that the N.C. Department of Transportation accept
maintenance responsibility for the required public road improvements by the time that the County has issued building permits for seventy-five percent (75%) of the lots shown on the record
plat, the County shall not issue any more building permits until the District Engineer makes such a recommendation and formally notifies the Subdivision Administrator.
Add Landuse of
tract – Ag and low density residential
Will there be a sign? If so please provide an easement or locate
Note that a foundation survey will be required on all lots less than 15,000sqft.
::
The P.E must submit As-Built record drawings of the proposed utility improvements and P.E Certifications to the HCDPU for review and sub sequential approval.
The utility improvements
must be permitted with NCDENR.
The utility improvement must be installed, inspected, tested and approved by the EOR, HCDPU and NCDENR before final plat approval.
The developer/owner
must pay HCDPU all Capacity Use Fees for the water and sewer services.
The developer/owner must provide HCDPU with a Cost Statement for all utility improvements installed to serve this
project.
All easements and deeds for the lift station lot and associated utilities must be submitted to HC Legal Dept and HCDPU for approval before recording.
Final Plat should include
turn around at lift station site.
Utilities must be included in right of ways.
The Pump Station Site label should be revised as “Sewer Pump Station Site”
Bramble avenue gravity sewer
main ust have a sanitary sewer easement placed around the sewer main where installed out of the ROW.
Lot 52 shows a water service on the water main that is not connected. The line stops
at Lot #51 lot corner with a blowoff. this should be revised to show the main continuing to the north easet corner of Lot #52.
ARV manholes should be shown on the final plat.
The Sewer
Pump Station must have a complete start up per HCDPU Standards and Specifications and have Final NCDENR DWQ Approval prior Final Plat approval or activation of system.
Final Inspection
must be conducted by the Engineer of Record and HCDPU.
The Engineer of Record must submit to HCDPU Engineer Certification of the utilities installed and include remaining field reports.
The
Engineer of record must submit to HCDPU a cost statement for the water and sewer utilities.
::
The P.E must submit As-Built record drawings of the proposed utility improvements and P.E Certifications to the HCDPU for review and sub sequential approval.
The utility improvements
must be permitted with NCDENR.
The utility improvement must be installed, inspected, tested and approved by the EOR, HCDPU and NCDENR before final plat approval.
The developer/owner
must pay HCDPU all Capacity Use Fees for the water and sewer services.
The developer/owner must provide HCDPU with a Cost Statement for all utility improvements installed to serve this
project.
All easements and deeds for the lift station lot and associated utilities must be submitted to HC Legal Dept and HCDPU for approval before recording.
Final Plat should include
turn around at lift station site.
Utilities must be included in right of ways.
The Pump Station Site label should be revised as “Sewer Pump Station Site”
Bramble avenue gravity sewer
main ust have a sanitary sewer easement placed around the sewer main where installed out of the ROW.
Lot 52 shows a water service on the water main that is not connected. The line stops
at Lot #51 lot corner with a blowoff. this should be revised to show the main continuing to the north easet corner of Lot #52.
ARV manholes should be shown on the final plat.
The Sewer
Pump Station must have a complete start up per HCDPU Standards and Specifications and have Final NCDENR DWQ Approval prior Final Plat approval or activation of system.
Final Inspection
must be conducted by the Engineer of Record and HCDPU.
The Engineer of Record must submit to HCDPU Engineer Certification of the utilities installed and include remaining field reports.
The
Engineer of record must submit to HCDPU a cost statement for the water and sewer utilities.
::
Engineering (910)814-6156
Conditionally Approve
Improvements must be constructed
or bonded.
As-builts to be provided with stormwater certification prior to release of bond.
LONG RANGE CONDITIONS
The following conditions must be satisfied
Must meet all requirements
set forth by NC DENR. Contact at (910)433-3300.
:
Please visit www.harnett.org/utilities for more information on the approval process.
The developer/owner must provide HCDPU with
a one (1) warranty for all utility improvements installed to serve this project.
:
Please visit www.harnett.org/utilities for more information on the approval process.
The developer/owner must provide HCDPU with a one (1) warranty for all utility improvements installed
to serve this project.
:
:
:
:
Development Review Board
Chairman
A FINAL copy, consisting of any corrections, etc., will be sent
after the meeting.
Upon resubmittal, additional comments/ corrections may be required.
**Please remember all applicable fee’s**
If APPROVED, your signed plat/plan may be picked up
at the Planning Department or will be mailed to you within two (2) business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing
that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan
for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised
plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning
Board within 30 days or meet with Planning Staff to discuss other potential options.