Loading...
HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: The Manors – Part 3 - Final Property Description PIN(s): 9595-51-3229.000  Acreage: 25.65 Acres  Address/SR No.: Off Bandana   Water Public water  available for this development (via ) Water capacity  available for this development Nearest water line location (Road name & SR#): Fire flow  available for this development Lines permitted under DENR Permit: (DEH Serial Number) Sewer Public sewer  available for this development (via ) Sewer capacity  available for this development Nearest sewer line location (Road name & SR#): Nearest sewer line size Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes  No  N/A Cost Statement for water improvements Yes  No  N/A Cost Statement for sewer improvements Yes  No  N/A Professional Engineer’s Certifications for water/sewer extension Yes  No  N/A Final Plat & As-Built Record Drawings are identical Yes  No  N/A DOT Encroachment Agreement Yes  No  N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes  No  N/A Master Plan submitted for additional phases if intended Yes  No  N/A Ballot REVIEWER: Shane Cummings Date: April 22, 2013 VOTE: Conditionally Approved CONDITIONS: SHORT TERM: There should be a note on the final plat for the abandoned force main to be removed from buildable area and capped of lots where the force main crosses. The Pump Station Site label should be revised as “Sewer Lift Station Lot” The new sewer pump station lot must be deeded to Harnett County and recorded with the ROD. The water and sewer utilities must be installed, tested and approved by HCDPU and the Engineer of Record. The Sewer Outfall easements must be platted and recorded with the HCROD after HCDPU and Legal services have reviewed the map and deeds to Harnett County. The Sewer Pump Station must have a complete start up per HCDPU Standards and Specifications and have Final NCDENR DWQ Approval prior Final Plat approval or activation of system. Final Inspection must be conducted by the Engineer of Record and HCDPU. The Engineer of Record must submit to HCDPU Engineer Certification of the utilities installed and include remaining field reports. The Engineer of record must submit to HCDPU record drawings of the water and sewer utilities. These record drawings must be in the form of 3 hard copies, 1 set of Mylar’s an Auto-Cad formatted disk and pdf drawing. The Engineer of record must submit to HCDPU a cost statement for the water and sewer utilities. The Water and Sewer utilities need final approval from NCDENR. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process. The developer must submit a one year warranty for the installation of the utilities to HCDPU. The Sewer Outfall System must have HCDPU and NCDENR approvals prior to operation of the system. Old SLS #59 must be offline and abandoned.