HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development
Name: The Manors – Part 3 - Final
Property Description
PIN(s):
9595-51-3229.000
Acreage:
25.65
Acres
Address/SR No.:
Off Bandana
Water
Public water available for
this development (via )
Water capacity available for this development
Nearest water line location (Road name & SR#):
Fire flow available for this development
Lines permitted under
DENR Permit: (DEH Serial Number)
Sewer
Public sewer available for this development (via )
Sewer capacity available for this development
Nearest sewer line location (Road name
& SR#):
Nearest sewer line size
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for
water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan
Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Shane Cummings Date: April 22, 2013
VOTE: Conditionally Approved
CONDITIONS:
SHORT TERM:
There should be a note on the final plat for the abandoned force main to be removed from buildable area and capped of lots where the force main crosses.
The Pump Station
Site label should be revised as “Sewer Lift Station Lot”
The new sewer pump station lot must be deeded to Harnett County and recorded with the ROD.
The water and sewer utilities must
be installed, tested and approved by HCDPU and the Engineer of Record.
The Sewer Outfall easements must be platted and recorded with the HCROD after HCDPU and Legal services have reviewed
the map and deeds to Harnett County.
The Sewer Pump Station must have a complete start up per HCDPU Standards and Specifications and have Final NCDENR DWQ Approval prior Final Plat approval
or activation of system.
Final Inspection must be conducted by the Engineer of Record and HCDPU.
The Engineer of Record must submit to HCDPU Engineer Certification of the utilities installed and include remaining field reports.
The Engineer of record must submit to HCDPU record
drawings of the water and sewer utilities. These record drawings must be in the form of 3 hard copies, 1 set of Mylar’s an Auto-Cad formatted disk and pdf drawing.
The Engineer of record
must submit to HCDPU a cost statement for the water and sewer utilities.
The Water and Sewer utilities need final approval from NCDENR.
LONG RANGE:
Please visit www.harnett.org/utilities
for more information on the approval process.
The developer must submit a one year warranty for the installation of the utilities to HCDPU.
The Sewer Outfall System must have HCDPU and
NCDENR approvals prior to operation of the system. Old SLS #59 must be offline and abandoned.