HomeMy WebLinkAboutFinal Hadden Pointe Phase 2 Decision PacketDRAFT DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name:
HADDEN POINTE PHASE 2
Development Type:
Date: APRIL 24, 2013
The above referenced application
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to
be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting.
::
::
SR #s should be shown for secondary roads on vicinity maps
per guidelines.
Ballard Rd is SR1437 Harnett Central Rd is SR2215
Phase 2 should be noted on plat
::
Note Landuse Class – MDR
Roads in previous phases need to be taken over
by DOT
Note that property is located within WS IV
Note gross acreage of development
Add utility to all ROW’s
Show existing utilities along roadway
Affix storm water statement
Stormwater
Certification
I certify that the stormwater management facilities are constructed and installed in conformance with the ordinances, rules, regulations, drainage design standards of Harnett
County, the State of North Carolina, and the approved stormwater permit and erosion control plan.
Note proposed number of lots
Note that fire hydrants are installed no more than 500’
apart and that street lights are installed no more than 300’ apart
Submit updated plat with lost lot before signature
Install street light(s) on Yukon
Fees – $9,100
::
Show
existing water utilities.
::
include statement on map that lot 12 is nonbuildable lot
or recombine lot 12 with adjacent lots
Engineering (910)893-7555
:
Add stormwater certification
to plat.
Engineering (910)893-7555
:
Add stormwater certification to plat.
LONG RANGE CONDITIONS
The following conditions must be satisfied
Must meet all requirements set forth by NC DENR.
Contact at (910)433-3300.
:
NOTE: SR #s only should be shown for secondary roads on vicinity maps per guidelines.
:
Please visit www.harnett.org/utilities for more information
on the approval process.
:
:
:
Development Review Board
Chairman
A FINAL copy, consisting of any corrections, etc., will be sent after
the meeting.
Upon resubmittal, additional comments/ corrections may be required.
**Please remember all applicable fee’s**
If APPROVED, your signed plat/plan may be picked up at the
Planning Department or will be mailed to you within two (2) business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that
all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan for
compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised
plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning
Board within 30 days or meet with Planning Staff to discuss other potential options.