HomeMy WebLinkAboutFinal Carolina Lakes Ph x Blk t PrtC Decision PacketFINAL DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name:
CAROLINA LAKES PHASE X BLOCK T PRT C
Development Type:
Date: APRIL 24, 2013
The above referenced application
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions
are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting.
::
::
::
Adjust building envelopes inside of easement
Note
a deed reference for the subject property
Note book/page for home owners’ assoc. docs.
Is there no water line extension past what is shown (ie coming from rear)?
Slide ROW/Utility street
note to new section of Sea Mist
Note that an elevation certificate will be required prior to construction on lots impacted by Flood Hazard Areas as deemed necessary
Take off note for
street lights since there are none, hydrant note can stay
Needs stormwater statement if applicable
Stormwater Certification
I certify that the stormwater management facilities are constructed
and installed in conformance with the ordinances, rules, regulations, drainage design standards of Harnett County, the State of North Carolina, and the approved stormwater permit and
erosion control plan.
Affix Maintenance statement as follows: Certificate of Improvements Maintenance
I hereby certify
that I assume all financial and legal responsibilities for the maintenance and upkeep of all streets and other required improvements in ___________ until such time that they are accepted
for maintenance by North Carolina Department of Transportation or other appropriate public or private entities.
::
The existing force main shown on the final plat should be labeled
as abandoned.
There should be a note on the final plat for the abandoned force main to be removed from buildable area and capped of lots where the force main crosses.
The Pump Station
Site label should be revised as “Sewer Pump Station Site”
The additional labeling shall be “Non-Buildable Lot to be deeded to County of Harnett.
Ballentyne Ct should show the existing
water main.
Summer Creek Lane existing water main should be shown.
Seam Mist Drive existing water main should be shown.
Sewer Utility Easements must be labeled.
The Final plat should
show fire hydrants.
ARV manholes should be shown on the final plat.
An Easement for access to the Dam should be shown at the end of Summer Creek Lane.
The new sewer pump station lot
must be deeded to Harnett County and recorded with the ROD.
The water and sewer utilities must be installed, tested and approved by HCDPU and the Engineer of Record.
The Utilities should
be labeled as existing.
The Sewer Pump Station must have a complete start up per HCDPU Standards and Specifications and have Final NCDENR DWQ Approval prior Final Plat approval or activation
of system.
The EOR must submit inspection reports for the utilities install in this section.
Final Inspection must be conducted by the Engineer of Record and HCDPU.
The Engineer of Record
must submit to HCDPU Engineer Certification of the utilities installed and include remaining field reports.
The Engineer of record must submit to HCDPU record drawings of the water and
sewer utilities for Carolina Lakes Block T. These record drawings must be in the form of 3 hard copies, 1 set of Mylar’s an Auto-Cad formatted disk and pdf drawing.
The Engineer of record
must submit to HCDPU a cost statement for the water and sewer utilities.
The Water and Sewer utilities need final approval from NCDENR.
::
The existing force main shown on the final plat should be labeled as abandoned.
There should be a note on the final plat for the abandoned force main to be removed from buildable
area and capped of lots where the force main crosses.
The Pump Station Site label should be revised as “Sewer Pump Station Site”
The additional labeling shall be “Non-Buildable Lot to
be deeded to County of Harnett.
Ballentyne Ct should show the existing water main.
Summer Creek Lane existing water main should be shown.
Seam Mist Drive existing water main should be
shown.
Sewer Utility Easements must be labeled.
The Final plat should show fire hydrants.
ARV manholes should be shown on the final plat.
An Easement for access to the Dam should be
shown at the end of Summer Creek Lane.
The new sewer pump station lot must be deeded to Harnett County and recorded with the ROD.
The water and sewer utilities must be installed, tested
and approved by HCDPU and the Engineer of Record.
The Utilities should be labeled as existing.
The Sewer Pump Station must have a complete start up per HCDPU Standards and Specifications
and have Final NCDENR DWQ Approval prior Final Plat approval or activation of system.
The EOR must submit inspection reports for the utilities install in this section.
Final Inspection
must be conducted by the Engineer of Record and HCDPU.
The Engineer of Record must submit to HCDPU Engineer Certification of the utilities installed and include remaining field reports.
The
Engineer of record must submit to HCDPU record drawings of the water and sewer utilities for Carolina Lakes Block T. These record drawings must be in the form of 3 hard copies, 1 set
of Mylar’s an Auto-Cad formatted disk and pdf drawing.
The Engineer of record must submit to HCDPU a cost statement for the water and sewer utilities.
The Water and Sewer utilities need
final approval from NCDENR.
::
Engineering (910)893-7555
:
Add stormwater certification to plat.
LONG RANGE CONDITIONS
The following conditions must be satisfied
Must
meet all requirements set forth by NC DENR. Contact at (910)433-3300.
:
Make sure all federal permits have been garnered in respect to all wetland encroachment or crossing
:
Please
visit www.harnett.org/utilities for more information on the approval process.
The developer must submit a one year warranty for the installation of the utilities to HCDPU.
Lots Impacted
by the existing abandoned force main shall have building permits placed on hold until confirmation of force main removal and plugging has been completed by the developer.
:
Please visit www.harnett.org/utilities for more information on the approval process.
The developer must submit a one year warranty for the installation of the utilities to HCDPU.
Lots
Impacted by the existing abandoned force main shall have building permits placed on hold until confirmation of force main removal and plugging has been completed by the developer.
:
:
:
Development Review Board
Chairman
A FINAL copy, consisting of any corrections, etc., will be sent after the meeting.
Upon resubmittal, additional
comments/ corrections may be required.
**Please remember all applicable fee’s**
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to
you within two (2) business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions
have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies
of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday
following the meeting the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff
to discuss other potential options.