HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development
Name: Anderson Creek Club: AC Crossings, Ph ?
Property Description
PIN(s):
Acreage:
56.86
acres
Address/SR No.:
Ray Road
Water
Public water available for this
development (via )
Water capacity available for this development
Nearest water line location (Road name & SR#): Ray Road
Nearest water line size: 12"
Fire flow available for this
development
Lines permitted under DENR Permit: (DEH Serial Number)
Sewer
Public sewer available for this development (via )
Sewer capacity available for this development
Nearest
sewer line location (Road name & SR#): N/A
Nearest sewer line size: 8inch
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record
Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications
for water/sewer extension Yes No N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to
nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Shane Cummings Date:
4/23/2013
VOTE:
CONDITIONS:
SHORT TERM:
An updated master plan should be submitted.
A Hydraulic Analysis should be submitted to demonstrate minimum fire flow and domestic flow/pressure
is available for the future water main extension.
A vicinity map should be included in the preliminary plat.
The Preliminary Plan should show the proposed sewer main extension and stopping
point.
Fire Hydrant are shown with hydrant legs installed under the roadway. The Fire Hydrant assemby should be installed on the water main on the right hand side of the roadway.
.
LONG
RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
Capacity fees must be paid in accordance with the latest Water and Sewer Use Ordinance prior
to HCDPU execution of water and sewer applications.
The EOR must submit to HCDPU Engineered Plans, hydraulic analysis, and associated documents for review and approval.
The water and
sewer utilities must be installed in accordance with HCDPU standards and specifications.
The EOR must submit all Engineering Final Documents prior to HCDPU approval of the water and
sewer extensions.
The proposed water lines that will serve the proposed phase of ACC subdivision must be permitted with NCDENR, installed, inspected, tested and approved by Harnett County
Department of Public Utilities (HCDPU) and NCDENR before the developer can record the final plat.
The final plat and the As-Built Record Drawings must match each other. The As-Built
Record Drawings and PE certifications must be submitted to HCDPU for review before the final plat can be recorded.
The Developer must provide HCDPU a Cost Statement indicating the cost
to install the water lines (materials and labor) that will serve the lots in Rangers Cove subdivision.
The developer and the utility contractor must provide HCDPU with a one (1) year
warranty on the water and sanitary sewer system improvements installed to serve the lots in the proposed subdivision.
Capacity fees must be paid in accordance with the latest Water and Sewer Use Ordinance prior to HCDPU execution of water and sewer applications.
The EOR must submit to HCDPU Engineered
Plans, hydraulic analysis, and associated documents for review and approval.
The water and sewer utilities must be installed in accordance with HCDPU standards and specifications.
The
EOR must submit all Engineering Final Documents prior to HCDPU approval of the water and sewer extensions.
The proposed water lines that will serve the proposed phase of ACC subdivision
must be permitted with NCDENR, installed, inspected, tested and approved by Harnett County Department of Public Utilities (HCDPU) and NCDENR before the developer can record the final
plat.
The final plat and the As-Built Record Drawings must match each other. The As-Built Record Drawings and PE certifications must be submitted to HCDPU for review before the
final plat can be recorded.
The Developer must provide HCDPU a Cost Statement indicating the cost to install the water lines (materials and labor) that will serve the lots in Rangers
Cove subdivision.
The developer and the utility contractor must provide HCDPU with a one (1) year warranty on the water and sanitary sewer system improvements installed to serve the
lots in the proposed subdivision.