HomeMy WebLinkAboutWest Landing @The Summit Decision PacketDRAFT DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name:
WEST LANDING@THE SUMMIT FORMERLY THE SUMMIT PHASE 4
Development Type:
Date: MARCH 13, 2013
The above referenced application
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The
following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting.
::
The hydrant locations on the preliminary
plans submitted in 2010 differ than actual field placement. The inter-hydrant distance from Boulder Drive/Cooper Loop to Cooper Loop/Timberline Drive is in excess of 1,200 feet. And
additional hydrant shall be installed to comply with the ordinance.
::
VICINITY MAP: Tingen Rd should be Tingen Rd
SR1120 should be SR1117
::
We do not have an approved
preliminary for this project
Lot 176 has to have the full lot frontage paved at full width and be shown to met minimum lot frontage
Take off lot numbers for 177 & 183 and label as “Non
Buildable Open Space”
Show existing/proposed utilities
Note that street lights are spaced no more than 300’ apart and that fire hydrants are spaced no more than 500’ apart
Install
street lights
Remove “Planning Director” signature block
Note # of total lots
Add “utility access” after Public St on all roads
Plat needs a storm water statement
Note where the homeowners
documents are recorded at with book and page
::
Final cost statement must be provided and include water main diameter and lengths installed.
Final inspection by HCDPU and EOR
must be completed and accepted by HCDPU.
NCDENR PWS final approval must be issued.
Utility must be included in the ROW discription.
Water mains and associated valves, etc. must be included
on the final plat.
Final asbuilts including water service locations must be submitted to HCDPU.
::
Final cost statement must be provided and include water main diameter and lengths installed.
Final inspection by HCDPU and EOR must be completed and accepted by HCDPU.
NCDENR
PWS final approval must be issued.
Utility must be included in the ROW discription.
Water mains and associated valves, etc. must be included on the final plat.
Final asbuilts including
water service locations must be submitted to HCDPU.
::
Provide final soils report for proposed lots
Engineering (910)893-7555
:
LONG RANGE CONDITIONS
The following conditions
must be satisfied
Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.
:
Please visit www.harnett.org/utilities for more information on the approval process.
The
developer and the utility contractor must jointly provide HCDPU a one (1) year warranty on the water system improvements that will serve the lots in the Summit subdivison. The one (1)
year warranty period shall begin once the final approval letter has been issued by the North Carolina Department of Environment and Natural Resources, Division of Environmental Health
- Public Water Supply Section (NCDENR,DEH-PWSS).
:
Ensure all State & Federal permits have been obtained before construction.
:
:
:
Development
Review Board
Chairman
A FINAL copy, consisting of any corrections, etc., will be sent after the meeting.
Upon resubmittal, additional comments/ corrections may be required.
**Please
remember all applicable fee’s**
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2) business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies
of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait,
as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have
been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold.
If DENIED, you may appeal
the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options.