HomeMy WebLinkAboutland qualityJames D. Simons, PG, PE Land Quality Section Beverly Eaves Perdue, Governor
Director and State Geologist Dee Freeman, Secretary
December 9, 2010
LETTER OF APPROVAL WITH MODIFICATIONS
Diversified Holdings, LLC
Attn: E. Frank Weaver III, President
350 Wagoner Drive
Fayetteville, NC 28303-
RE: Project Name: The Summit, Phase Four Acres Approved: 5.2
Project ID: HARNE- 2011 -040
County: Harnett Barbecue Timberline Drive off Alpine Drive
River Basin: Cape Fear Stream Classification: Other
Submitted By: Moorman, Kizer & Reitzel, Inc.
Date Received by LQS: 11/9/2010
Plan Type: New
Dear Mr. Weaver:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval With Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion
control plan be on file at the job site. Also, you should consider this letter to give the Notice required by
G.S. 113A- 61.1(a) of our right of periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance- oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement of this
project, it is determined that the erosion and sedimentation control plan is inadequate to meet the
requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-
51 through 66), this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
The developer is responsible for obtaining any and all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity. This could include
agencies such as the Division of Water Quality's stormwater regulations, their enforcement requirements within
Fayetteville Regional Office 225 Green Street — Suite 714, Fayetteville, North Carolina 28301
Phone: 910-433-3300/ FAX: 910 - 486 - 0707 - Internet: http: / /www.dIr.enr. state. nc. us /pages /landqualitysection.htmI
An Equal Opportunity / Affirmative Action Employer — 50% Recycled / 10% Post Consumer Paper
Letter of Approval with Modifications
Diversified Holdings, LLC
December 9, 2010
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: The Summit, Phase Four
Project ID: HARNE -2011 -040
County: Harnett
1. Provide a plan detail, construction specifications, and maintenance requirements for the porous
baffles associated with the sediment traps. Include the baffle spacing for each sediment trap.
2. Identify Swale #1 on the plan sheets.
3. Submit two copies of all revised plan sheets to our office. Provide revised plan sheets to all
relevant parties involved in the land- disturbing activity.